Commitment to Maintain Severe Accident Management Guidelines
ML15357A050
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/10/2015
From: Flores R, Thomas McCool
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201501110, TXX-15159
Download: ML15357A050 (4)


Text

Senior Rafael Vice President P0O Box 1002

& ChiefFlores Nuclear Officer Luminant 6322 NorthPower FM 56 Luminant rafaelflores@luminant.com Glen Rose, TX 76043 T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201501110 TXX-15159 December 10, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NOS. 50-445 AND 50-446 COMMITMENT TO MAINTAIN SEVERE ACCIDENT MANAGEMENT GUIDELINES

Dear Sir or Madam:

The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes conunitments related to SAMGs for Comanche Peak Nuclear Power Plant (CPNPP) Unit 1 and Unit 2. These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.

The new SAMG commitments are listed in Attachment 1.

It is expected that NRC staff personnel will conduct periodic inspection of our SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.

Should you have any questions concerning the content of this letter, please contact Robert A. Slough at 254-897-5727.

U. S. Nuclear Regulatory Commission TXX-151 59 Page 2 12/10/20 15 Sincerely, Luminant Generation Company LLC Rafael Flores By: . co Tho a Mc ool Vice President, Engineering & Support Attachment -. List of Regulatory Commitments c - Marc L. Dapas, U.S. Nuclear Regulatory Commission Regional Administrator, Region IV William Dean, Director, Office of Nuclear Reactor Regulation Baiwant K. Singal, NRR Resident Inspectors, Comanche Peak NEI (David Young at dly@nei.org)

Attachment to TXX-1 5159 Page 1 12/10/2015 List of Regulatory Commitments

Attachment to TXX-151 59 Page 2 12/10/2015 The following table identifies those actions committed to in this document by Luminant Generation Company LLC (Luminant Power) for Comanche Peak Nuclear Power Plant (CPNPP) Unit 1 and Unit 2.

Any other statements in this submittal are provided for informational purposes and are not considered to be regulatory commitments.

NUMBER COMMITMENT TYPE COMPLETION DATE 5194898 CPNPP will consider the site SAMGs within plant Ongoing October 31, 2016 configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. ________

5194911 CPNPP will update the site SAMGs to future revisions of the Ongoingl Within 2 refueling PWROG generic severe accident technical guidelines, and the outages or 3 years SAMGs will be integrated with other emergency response of the publication guideline sets and symptom-based Emergency Operating date of the Procedures, and validated, using the guidance in NEI 14-01, guidelines, Emergency Response Procedures and Guidelines for Beyond whichever is Design Basis Events and Severe Accidents. greater

Senior Rafael Vice President P0O Box 1002

& ChiefFlores Nuclear Officer Luminant 6322 NorthPower FM 56 Luminant rafaelflores@luminant.com Glen Rose, TX 76043 T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201501110 TXX-15159 December 10, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NOS. 50-445 AND 50-446 COMMITMENT TO MAINTAIN SEVERE ACCIDENT MANAGEMENT GUIDELINES

Dear Sir or Madam:

The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes conunitments related to SAMGs for Comanche Peak Nuclear Power Plant (CPNPP) Unit 1 and Unit 2. These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.

The new SAMG commitments are listed in Attachment 1.

It is expected that NRC staff personnel will conduct periodic inspection of our SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.

Should you have any questions concerning the content of this letter, please contact Robert A. Slough at 254-897-5727.

U. S. Nuclear Regulatory Commission TXX-151 59 Page 2 12/10/20 15 Sincerely, Luminant Generation Company LLC Rafael Flores By: . co Tho a Mc ool Vice President, Engineering & Support Attachment -. List of Regulatory Commitments c - Marc L. Dapas, U.S. Nuclear Regulatory Commission Regional Administrator, Region IV William Dean, Director, Office of Nuclear Reactor Regulation Baiwant K. Singal, NRR Resident Inspectors, Comanche Peak NEI (David Young at dly@nei.org)

Attachment to TXX-1 5159 Page 1 12/10/2015 List of Regulatory Commitments

Attachment to TXX-151 59 Page 2 12/10/2015 The following table identifies those actions committed to in this document by Luminant Generation Company LLC (Luminant Power) for Comanche Peak Nuclear Power Plant (CPNPP) Unit 1 and Unit 2.

Any other statements in this submittal are provided for informational purposes and are not considered to be regulatory commitments.

NUMBER COMMITMENT TYPE COMPLETION DATE 5194898 CPNPP will consider the site SAMGs within plant Ongoing October 31, 2016 configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. ________

5194911 CPNPP will update the site SAMGs to future revisions of the Ongoingl Within 2 refueling PWROG generic severe accident technical guidelines, and the outages or 3 years SAMGs will be integrated with other emergency response of the publication guideline sets and symptom-based Emergency Operating date of the Procedures, and validated, using the guidance in NEI 14-01, guidelines, Emergency Response Procedures and Guidelines for Beyond whichever is Design Basis Events and Severe Accidents. greater