ML15355A480

From kanterella
Jump to navigation Jump to search
10 CFR 50.71 Maintenance of Records Licensing Basis Document Update and Biennial Commitment Change Report
ML15355A480
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/21/2015
From: Hettel W G
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15356A148 List:
References
GO2-15-159
Download: ML15355A480 (11)


Text

G02-15-159 Page 2 The Columbia License Basis Documents are provided in electronic format in Attachments 4 and 5. The files are in the Portable Document Format (PDF). Attachment 3 contains a listing of the individual document component filenames comprising Attachments 4 and 5. The files have been sized to meet file size limitations for electronic submittals.

Additionally, the PDF files in Attachment 5 contain hyperlinks.

These hyperlinks are not essential to the FSAR content and are disabled.

Consistent with Energy Northwest's past FSAR submittals, Energy Northwest is providing a publicly available version of the FSAR (Attachment

5) in which information previously considered to be "sensitive unclassified (non-safeguards) information" has been removed. Energy Northwest recognizes that a draft Regulatory Issue Summary (RIS) has been issued addressing the public availability of FSAR information and is currently evaluating the impact to future FSAR biennial submittals.

A list of information removed from the FSAR submittal is contained in Attachment

6. A complete copy of the FSAR is submitted under separate cover. There are no commitments being made to the NRC by this letter; however, two existing commitments have been changed as described in Attachment
2. If you have any questions or desire additional information pertaining to this report, please contact Ms. L.L. Williams, Licensing Supervisor, at (509)377-8148.

I declare under penalty of perjury that the foregoing is true and correct. Executed on 1 z I /11

Attachment:

1. Redundant Information and Excessive Detail Removed from the FSAR 2. Regulatory Commitment Changes (NEI 99-04 Process) 3. Document Components
4. Technical Specification Bases, Revision 87 Licensee Controlled Specifications, Revision 87 Operational Quality Assurance Program Description, Revision 48 5. Columbia Generating Station FSAR, Amendment 63, Publicly Available
6. Information withheld from Columbia Generating Station FSAR , Amendment 63, Publicly Av a ilable (Attachment
5) cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident lnspector/988C CD Sonada-BPA/1399 WA Horin -Winston & Strawn

G02-15-159 Page 2 The Columbia License Basis Documents are provided in electronic format in Attachments 4 and 5. The files are in the Portable Document Format (PDF). Attachment 3 contains a listing of the individual document component filenames comprising Attachments 4 and 5. The files have been sized to meet file size limitations for electronic submittals.

Additionally, the PDF files in Attachment 5 contain hyperlinks.

These hyperlinks are not essential to the FSAR content and are disabled.

Consistent with Energy Northwest's past FSAR submittals, Energy Northwest is providing a publicly available version of the FSAR (Attachment

5) in which information previously considered to be "sensitive unclassified (non-safeguards) information" has been removed. Energy Northwest recognizes that a draft Regulatory Issue Summary (RIS) has been issued addressing the public availability of FSAR information and is currently evaluating the impact to future FSAR biennial submittals.

A list of information removed from the FSAR submittal is contained in Attachment

6. A complete copy of the FSAR is submitted under separate cover. There are no commitments being made to the NRC by this letter; however, two existing commitments have been changed as described in Attachment
2. If you have any questions or desire additional information pertaining to this report, please contact Ms. L.L. Williams, Licensing Supervisor, at (509)377-8148.

I declare under penalty of perjury that the foregoing is true and correct. Executed on 1 z I /11

Attachment:

1. Redundant Information and Excessive Detail Removed from the FSAR 2. Regulatory Commitment Changes (NEI 99-04 Process) 3. Document Components
4. Technical Specification Bases, Revision 87 Licensee Controlled Specifications, Revision 87 Operational Quality Assurance Program Description, Revision 48 5. Columbia Generating Station FSAR, Amendment 63, Publicly Available
6. Information withheld from Columbia Generating Station FSAR , Amendment 63, Publicly Av a ilable (Attachment
5) cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident lnspector/988C CD Sonada-BPA/1399 WA Horin -Winston & Strawn