Construction Permit Application Review SHINE Medical Technologies Safety Panel 1 December 15, 2015 NRC-011

Panelists

- Chief, Research and Test Reactors Licensing Branch, NRR

- Project Manager, NRR

  • Mary Adams

- Project Manager, NMSS 2

Licensing Considerations

  • SHINE seeks to construct commercial non-power utilization and production facilities
  • Licensing process similar to that of research and test reactors
  • Developed technology-specific guidance for application review 3

Advisory Committee on Reactor Safeguards (ACRS) Review

  • Staff presented at subcommittee and full committee meetings
  • ACRS recommended issuance of construction permit
  • Staff adequately addressed questions regarding aircraft impact and facility layup 4

Irradiation Unit Licensing

  • Irradiation units represent first subcritical utilization facilities
  • Given similarities to non-power reactors, ultimately reviewed under 10 CFR Part 50 5

Irradiation Unit Design Features

  • Thermal power level similar to non-power reactors
  • Safety considerations include:

- Fission heat removal

- Decay heat generation

- Fission gas release

- Accident scenarios 6

Production Facility Licensing

  • Similar to processes at existing fuel cycle facilities
  • Staff used NUREG-1537 and Interim Staff Guidance 7

Proposed Permit Conditions

  • Criticality accident alarm system
  • Criticality events not credible
  • Criticality safety analyses
  • Reactivity contributions from fissile isotopes
  • Radiation shielding and occupancy times 8

Acronyms

  • NMSS - Office of Nuclear Material Safety and Safeguards
  • NRR - Office of Nuclear Reactor Regulation 9

Construction Permit Application Review SHINE Medical Technologies Safety Panel 1 December 15, 2015 NRC-011

Panelists

- Chief, Research and Test Reactors Licensing Branch, NRR

- Project Manager, NRR

  • Mary Adams

- Project Manager, NMSS 2

Licensing Considerations

  • SHINE seeks to construct commercial non-power utilization and production facilities
  • Licensing process similar to that of research and test reactors
  • Developed technology-specific guidance for application review 3

Advisory Committee on Reactor Safeguards (ACRS) Review

  • Staff presented at subcommittee and full committee meetings
  • ACRS recommended issuance of construction permit
  • Staff adequately addressed questions regarding aircraft impact and facility layup 4

Irradiation Unit Licensing

  • Irradiation units represent first subcritical utilization facilities
  • Given similarities to non-power reactors, ultimately reviewed under 10 CFR Part 50 5

Irradiation Unit Design Features

  • Thermal power level similar to non-power reactors
  • Safety considerations include:

- Fission heat removal

- Decay heat generation

- Fission gas release

- Accident scenarios 6

Production Facility Licensing

  • Similar to processes at existing fuel cycle facilities
  • Staff used NUREG-1537 and Interim Staff Guidance 7

Proposed Permit Conditions

  • Criticality accident alarm system
  • Criticality events not credible
  • Criticality safety analyses
  • Reactivity contributions from fissile isotopes
  • Radiation shielding and occupancy times 8

Acronyms

  • NMSS - Office of Nuclear Material Safety and Safeguards
  • NRR - Office of Nuclear Reactor Regulation 9