|
---|
Category:Letter
MONTHYEARNL-25-0045, Proposed Inservice Inspection Alternative FNP-ISI-ALT-2025-10 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1) (NL-25-0045)2025-02-27027 February 2025 Proposed Inservice Inspection Alternative FNP-ISI-ALT-2025-10 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1) (NL-25-0045) ML24351A0802025-01-24024 January 2025 Issuance of Amendments Regarding Revision to Technical Specifications to Use Online Monitoring Methodology NL-24-0117, Change to Quality Assurance Program to Adopt Regulatory Guide 1.8 Revision 4 and License Amendment Request to Relocate Control of the Unit/Facility/Plant Staff Qualification Requirements from Technical Specifications to the Quality Assura2025-01-23023 January 2025 Change to Quality Assurance Program to Adopt Regulatory Guide 1.8 Revision 4 and License Amendment Request to Relocate Control of the Unit/Facility/Plant Staff Qualification Requirements from Technical Specifications to the Quality Assuranc ML25021A1042025-01-21021 January 2025 – Investigation Summary, Office of Investigations Case Number OI-RII-2024-0002 NL-25-0433, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2 - DC Electrical Rewrite - Update to TSTF-360 - Response to Request for Additional Information2025-01-17017 January 2025 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2 - DC Electrical Rewrite - Update to TSTF-360 - Response to Request for Additional Information NL-25-0014, Withdrawal of Request for Exemption from Physical Barrier Requirements2025-01-15015 January 2025 Withdrawal of Request for Exemption from Physical Barrier Requirements ML25008A2482025-01-15015 January 2025 Acknowledgement of the Withdrawal of the Requested Exemptions for Physical Barriers ML25008A0372025-01-15015 January 2025 Audit Summary Report for the Exemption Requests Regarding Physical Barriers ML24330A1232024-12-20020 December 2024 Issuance of Amendment Nos. 251, 248, 226, and 208 Revising TS to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24351A0402024-12-19019 December 2024 Authorization of Proposed Alternative RR-PR-04 Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves IR 05000348/20244022024-12-13013 December 2024 Joseph M Farley Nuclear Plant - Cyber Security Inspection Report 05000348/2024402 and 05000364/2024402 IR 05000348/20240122024-12-11011 December 2024 Biennial Problem Identification and Resolution Inspection Report 05000348/2024012 and 05000364/2024012 NL-24-0406, Response to Request for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0032024-11-15015 November 2024 Response to Request for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-003 ML24320A1342024-11-15015 November 2024 Regulatory Audit in Support of Review of the Exemption Requests Regarding Physical Barriers EPIDs L-2023-LLE-0018 and -0021 (Nonproprietary Cover Letter) ML24302A2972024-11-15015 November 2024 Regulatory Audit Report in Support of Review of the License Amendment Request to Revise TS 1.1 and Add New TSs 5.5.21 and 5.5.17 NL-24-0397, Response to Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement2024-11-15015 November 2024 Response to Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement IR 05000348/20240032024-11-13013 November 2024 Integrated Inspection Report 05000348/2024003, 05000364/2024003 and 07200042/2024001 IR 05000348/20244032024-11-13013 November 2024 – Security Baseline Inspection Report 05000348/2024403 & 05000364/2024403 NL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 ML24233A1372024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion NL-24-0315, – ISFSI, Registration of Spent Fuel Cask Use2024-08-0909 August 2024 – ISFSI, Registration of Spent Fuel Cask Use ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 2025-02-27
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24344A0842024-12-0505 December 2024 RAIs - TSTF-500 LAR ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24271A0052024-09-26026 September 2024 NRR E-mail Capture - for Your Response - RAI - Farley and Vogtle 1 and 2 - Proposed Alternative Request for Steam Generator Welds (L-2024-LLR-0041) ML24227A0512024-08-14014 August 2024 August 14, 2024 - Request for Additional Information - Farley, Units 1 and 2 - Proposed LAR to Revise TS SR 3.6.6.8 Frequency ML24179A1242024-06-27027 June 2024 ISFSI Request for Information (2024) ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions ML24037A1362024-02-0606 February 2024 RP DLR Feb. 2024 ML24037A1352024-02-0505 February 2024 E-mail ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23243A9952023-08-31031 August 2023 Request for Baseline RP Inspection ML23236A0022023-08-22022 August 2023 NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23095A0832023-04-0505 April 2023 NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189) ML23086A0232023-03-24024 March 2023 NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189) ML23003A8092023-01-0303 January 2023 NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068) ML22334A1482022-11-30030 November 2022 NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML22123A1802022-05-0303 May 2022 NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22123A1782022-05-0303 May 2022 NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22112A0892022-04-22022 April 2022 NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML21321A3772021-11-16016 November 2021 NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21321A3752021-11-10010 November 2021 NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal IR 05000348/20210122021-05-0606 May 2021 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000348/2021012 and 05000364/2021012 ML21012A3242021-01-12012 January 2021 NRR E-mail Capture - Request for Additional Information - Farley, 1 and 2 - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20351A4042020-12-16016 December 2020 NRR E-mail Capture - Draft RAIs for Farley 50.69 (ML20170B114) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20254A1912020-09-10010 September 2020 004 Radiation Safety Baseline Inspection Information Request ML20174A5812020-06-22022 June 2020 Notification of Inspection and Request for Information ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests ML20149K4392020-05-21021 May 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate RAI Sfnb RAI No. 2 ML20121A1472020-04-29029 April 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate Follow-up RAI Emib No. 1 ML20115E3922020-04-24024 April 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding TS 3.3.1 and TS 3.3.7 License Amendment Request ML20084G5272020-03-23023 March 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Measurement Uncertainty Recapture Power Uprate ML20055E9752020-02-28028 February 2020 Request for Additional Information Update the Spent Fuel Pool Criticality Safety Analysis (EPID L-2019-LLA-0212) Non-Proprietary Version ML19150A1022019-05-29029 May 2019 Request for Additional Information Regarding Relief Request FNP-ISI-05-04, Version 1.0 (L-2019-LLR-0020) ML19066A0422019-03-0707 March 2019 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Relief Request FNP-ISI-RR-03, Version 1.0 ML19056A2142019-02-25025 February 2019 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Relief Request FNP-ISI-RR-02, Version 1.0 ML19052A1712019-02-20020 February 2019 Rad Safety Inspection Document Request ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18239A1542018-08-24024 August 2018 Emergency Preparedness Inspection and Request for Information ML18087A1462018-05-0101 May 2018 Request for Additional Information TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML18058B1522018-02-27027 February 2018 Emailed RP RFI 2018-02 ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Companys Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Units ML17360A0552017-12-20020 December 2017 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Supplemental RAI Request No. 7 to License Amendment Request to Revise TS 5.5.17 Containment Leakage Rate Testing Program (CAC Nos. MF8844, MF8845; EPID No. L-2016-LLA-0015) ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17219A0012017-08-0303 August 2017 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Supplemental RAI Request No. 5(b), 5(c), and 6 Related to License Amendment Request to Revise TS 5.5.17 Containment Leakage Rate Testing Program ML17194A7872017-07-21021 July 2017 Request for Additional Information ML17095A4152017-04-17017 April 2017 Request for Additional Information 2024-09-26
[Table view] |
Text
,..
UNITED STATES NUCLEAR REGULATORY COMMISSION*
WASHINGTON, D.C. 20555-0001 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 December 17, 2015
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF6687 AND MF6688)
Dear Mr. Pierce:
By letter dated August 31, 2015, the Southern Nuclear Operating Company, Inc. (SNC),
submitted a request to revise the Joseph M. Farley Nuclear Plant, Units 1 and 2, Technical Specifications. The proposed change would eliminate the Residual Heat Removal autoclosure interlock and its associated Surveillance Requirement.
The NRC staff has determined that additional information is needed as discussed in the Enclosure. We request that SNC respond within 45 days of the date of this letter. Please note that the NRC staff's review is continuing and further requests for information may be developed.
Docket Nos. 50-348, 50-364
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
DOCKET NOS. 50-348 AND 50-364 By letter dated August 31, 2015 (Agencywide Documents Access and Management System Accession No. ML15261A673), the Southern Nuclear Operating Company, Inc., submitted a request to revise the Joseph M. Farley Nuclear Plant, Units 1 and 2, Technical Specifications.
The proposed change would eliminate the Residual Heat Removal autoclosure interlock and its associated Surveillance Requirement. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the request and determined that additional information is necessary to complete the review.
RAI No. 1:
~.
Section 2.3, "Procedural Changes," of the WCAP-11736, "Residual Heat Removal System Autoclosure Interlock Removal Report for the Westinghouse Owners Group,"NRC staff safety evaluation report (SER) states that WCAP-11736 proposes generic procedural requirements.
The SER also states that "the staff agrees with this generic guidance assuming a surveillance procedure for the [Residual Heat Removal (RHR) System] suction valve alarms is added to ensure these alarms remain operable." Provide a description of the mentioned surveillance procedure for the new RHR System suction valve alarm at Farley.
RAI No. 2:
The license amendment request discusses a new alarm that will actuate if any RHR System suction isolation valve is open and the reactor coolant system pressure is greater than the open permissive setpoint and less than the RHR System design pressure minus the RHR pump head pressure at minimum flow. NUREG-0800, Branch Technical Position (BTP) 5-4, "Design Requirements of the Residual Heat Removal System," contains an RHR System isolation requirement that states: "The valves should have independent diverse interlocks to protect against one or both valves being open during a [reactor coolant system] increase above the design pressure of the RHR system, to the extent that such interlocks will not degrade high system reliability during shutdown operations (see Generic Letter 88-17)~" Additionally, Section 2.5, "Safety Function of the Autoclosure Interlock," of the WCAP-11736 SER also highlights this concern: "The ACI function is to preclude conditions that could lead to a LOCA outside of containment, Event V, due to operator error. The sequence that concerns the staff in particular is that case in which the operator closes one of the isolation valves and not the other... ")
- a.
Since a level of diversity is being removed by removing the ACI, how will plant procedures ensure that operators will take appropriate action when the alarm is received in the control room?
- b.
What additional operator training will be required prior to implementation of the revised Technical Specifications?
Enclosure RAI No. 3:
The RHR System provides a low temperature overpressure protection safety function during shutdown and refueling operations by providing pressure relief to the pressure relief tank inside containment. Previously, power lockout of the RHR System containment isolation valves was implemented at FNP to reduce the frequency of inadvertent valve closure due to the presence of the ACI. With the removal of the ACI circuitry, FNP is also removing the requirement to lockout power to the RHR System containment isolation valves below a reactor coolant system temperature of 180 degrees Fahrenheit as discussed in the license amendment request. LCO 3.4.12, "Low Temperature Overpressure Protection (L TOP) System," requires that two RHR suction relief valves with setpoints less than or equal to 450 pounds per square inch gauge be available or alternatively that the reactor coolant system be depressurized with a reactor coolant system vent greater than or equal to 2.85 square inches in* Modes 4, 5, and 6. The presence of LCO 3.4.12 does not inherently prevent the closure of the two RHR suction relief valves during Modes 4, 5, and 6; appropriate plant procedures are also required to ensure that the LCO will be met. With. power no longer being removed and manual valve closure possible, describe plant procedures associated with the control of the RHR suction relief valves to provide assurance that inadvertent isolation will not occur during Modes 4, 5, and 6.
\\
Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 December 17, 2015
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1AND2-REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF6687 AND MF6688)
Dear Mr. Pierce:
By letter dated August 31, 2015, the Southern Nuclear Operating Company, Inc. (SNC),
submitted a request to revise the Joseph M. Farley Nuclear Plant, Units 1 and 2, Technical Specifications. The proposed change would eliminate the Residual Heat Removal autoclosure interlock and its associated Surveillance Requirement.
The NRC staff has determined that additional information is needed as discussed in the Enclosure. We request that SNC respond within 45 days of the date of this letter. Please note that the NRC staff's review is continuing and further requests for information may be developed.
Docket Nos. 50-348, 50-364
Enclosure:
Sincerely,
/RA/
Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlDpr Resource RidsNrrLASFigueroa Resource APatel, NRR LPL2-1 R/F RidsNrrDorllpl2-1 Resource RidsNrrDe Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource ADAMS A ccess1on o.:
5 7 4 4 N
ML1 33 A 8
- B :ye-mail OFFICE LPL2-1/PM LPL2-1/LA NRR/DSS/SRXB/BC LPL2-1/BC LPL2-1/PM NAME SWilliams SFigueroa CJackson*
MMarkley SWilliams DATE 12/17/15 12/08/15 12/14115 12/17/15 12/17/15 OFFICIAL RECORD COPY