ML15334A437
| ML15334A437 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 11/30/2015 |
| From: | Diane Jackson Operations Branch I |
| To: | Emily Larson FirstEnergy Nuclear Operating Co |
| Jackson D | |
| Shared Package | |
| ML15161A011 | List: |
| References | |
| Download: ML15334A437 (3) | |
Text
E. Larson UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 Mr. Eric A. Larson Site Vice President First Energy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077-0004
SUBJECT:
INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL (BEAVER VALLEY POWER STATION - UNIT 2)
Dear Mr. Larson:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at the Beaver Valley Power Station, Unit 2. Please note that written examination approval will be communicated under separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to D. Gibson, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC approved the subject operating test in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10 on November 30, 2015.
The NRC staff will administer the operating tests during the week of December 7, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
November 30, 2015
E. Larson 2
Please contact your Chief Examiner, Mr. Peter Presby at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73 cc: Distribution via ListServ
E. Larson 2
Please contact your Chief Examiner, Mr. Peter Presby at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73 cc: Distribution via ListServ DISTRIBUTION w/encl:
DDorman, RA (R1ORAMAIL)
SKennedy, DRP DLew, DRA (R1ORAMAIL)
SShaffer, DRP MScott, DRP (R1DRPMAIL)
SElkhiamy, DRP JColaccino, DRP (R1DRPMAIL)
JKrafty, DRP, SRI RLorson, DRS (R1DRSMAIL)
BReyes, DRP, RI GSuber, DRS (R1DRSMAIL)
JJessie, RI, OEDO RidsNrrPMBeaverValley Res DJackson, DRS RidsNrrDorlLpl1-2 Res PPresby, DRS, Chief Examiner DRS Master Exam File (CBixler) (w/concurrences)
DOCUMENT: G:\\DRS\\Operations Branch\\PRESBY\\Exam FY16-BV2 Dec 15 (U01906)\\ExamApproval-O-Ltr.docx ADAMS PKG: ML15161A011 ADAMS ACCESSION NO.: ML15334A437 SUNSI Review Non-Sensitive
Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/DEJ for/
PPresby/DEJ for/
DEJackson/DEJ DATE 11/27/15 11/25/15 11/30/15 OFFICIAL RECORD COPY
E. Larson UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 Mr. Eric A. Larson Site Vice President First Energy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077-0004
SUBJECT:
INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL (BEAVER VALLEY POWER STATION - UNIT 2)
Dear Mr. Larson:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at the Beaver Valley Power Station, Unit 2. Please note that written examination approval will be communicated under separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to D. Gibson, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC approved the subject operating test in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10 on November 30, 2015.
The NRC staff will administer the operating tests during the week of December 7, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
November 30, 2015
E. Larson 2
Please contact your Chief Examiner, Mr. Peter Presby at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73 cc: Distribution via ListServ
E. Larson 2
Please contact your Chief Examiner, Mr. Peter Presby at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73 cc: Distribution via ListServ DISTRIBUTION w/encl:
DDorman, RA (R1ORAMAIL)
SKennedy, DRP DLew, DRA (R1ORAMAIL)
SShaffer, DRP MScott, DRP (R1DRPMAIL)
SElkhiamy, DRP JColaccino, DRP (R1DRPMAIL)
JKrafty, DRP, SRI RLorson, DRS (R1DRSMAIL)
BReyes, DRP, RI GSuber, DRS (R1DRSMAIL)
JJessie, RI, OEDO RidsNrrPMBeaverValley Res DJackson, DRS RidsNrrDorlLpl1-2 Res PPresby, DRS, Chief Examiner DRS Master Exam File (CBixler) (w/concurrences)
DOCUMENT: G:\\DRS\\Operations Branch\\PRESBY\\Exam FY16-BV2 Dec 15 (U01906)\\ExamApproval-O-Ltr.docx ADAMS PKG: ML15161A011 ADAMS ACCESSION NO.: ML15334A437 SUNSI Review Non-Sensitive
Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/DEJ for/
PPresby/DEJ for/
DEJackson/DEJ DATE 11/27/15 11/25/15 11/30/15 OFFICIAL RECORD COPY