ML15328A405

From kanterella
Jump to navigation Jump to search

Letter for Draft SE of TSTF-529, Revision 3, Clarify Use and Application Rules
ML15328A405
Person / Time
Site: Technical Specifications Task Force
Issue date: 01/29/2016
From: Kevin Hsueh
NRC/NRR/DPR/PSPB
To:
Technical Specifications Task Force
Honcharik M, NRR/DPR, 301-415-1774
Shared Package
ML15345A444 List:
References
TAC MF1406, TAC MF1407
Download: ML15328A405 (3)


Text

January 29, 2016 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

DRAFT SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-529, REVISION 3, CLARIFY USE AND APPLICATION RULES (TAC NOS. MF1406 AND MF1407)

Dear Members of the Technical Specifications Task Force:

By letter dated September 14, 2015 (Agencywide Documents Access and Management System Accession No. ML15259A337), the Technical Specifications Task Force submitted to the U.S.

Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-529, Revision 3, Clarify Use and Application Rules. The NRC staff's draft safety evaluation (SE) of the Traveler is enclosed.

Twenty working days are provided to you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.

To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely,

/RA/

Kevin Hsueh, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 753

Enclosure:

As stated cc: See next page

ML15328A405 (Letter); ML15345A447 (Draft SE); ML15345A444 (Package)

  • concurred via e-mail NRR-106 OFFICE PLPB/PM PLPB/LA*

STSB/BC**

NAME MHoncharik DHarrison RElliott DATE 12/11/2015 12/29/15 12/08/2015 OFFICE OGC*

PLPB/BC*

NAME JLindell KHsueh DATE 1/19/2016 1/29/2016

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation Attention: Brian D. Mann 11921 Rockville Pike Suite 100 Rockville, MD 20852 E-mail: brian.mann@excelservices.com James R. Morris Diablo Canyon Power Plant Building 104/5/21A P.O. Box 56 Avila Beach, CA 93424 E-mail: JY1E@pge.com Joseph A. Clark Entergy Nuclear South 5485 Highway 61 St. Francisville, LA. 70775 E-mail: jclark@entergy.com Otto W. Gustafson Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com Michael K. Leisure Duke Energy 526 S. Church Street Mail Code EC2ZF Charlotte, NC 28202 E-mail: mike.leisure@duke-energy.com