ML15261A169

From kanterella
Jump to navigation Jump to search
Informs That on 980413,Region II Administrator Established NRC Mgt Oversight Group (Mog) to Provide Oversight of ONS Recovery Plan & Oversight of Performance During Recovery. Notifies That Mog Will Conduct Public Meeting on 980422
ML15261A169
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/15/1998
From: Casto C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccollum W
DUKE POWER CO.
Shared Package
ML15261A170 List:
References
NUDOCS 9804210227
Download: ML15261A169 (5)


Text

REGULARY INFORMATION DISTRIBUTE SYSTEM (RIDS)

ACCESSION NBR:9804210227 DOC.DATE: 98/04/15 NOTARIZED: NO DOCKET #

FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287 AUTH.NAME AUTHOR AFFILIATION CASTO,C.A.

Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION MCCOLLUM,W.R.

Duke Power Co.

C

SUBJECT:

Informs that on 980413,Region II Administrator established NRC mgt oversight group (MOG) to provide oversight of ONS Recovery Plan.& oversight of performance during recovery.

Notifies that MOG will conduct public meeting on 980422.

DISTRIBUTION CODE: IE45D COPIES RECEIVED:LTR ENCL SIZE:-/

E TITLE: Summary of Significant Meeting with Licensee (Part 50)

NOTES:

C RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1

1 LAB 1

1 INTERNAL: DEDRO 1

1 FILECENTER 1

1 NRR/DRPM/PERB 1

1 OGC ROED 1

1 RES/DET/EIB 1

1 RGN2 FILE 01 1

1 TERNAL: NOAC 1

1 NRC PDR 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST:

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO:

DESK (DCD) ON EXTENSION 415-2083.

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

April 15, 1998 Duke Energy Corporation ATTN:

Mr. W. R. McCollum Vice President Oconee Site P. 0. Box 1439 Seneca, SC 29679

Dear Mr. McCollum:

On April 13. 1998, the Region II Administrator established an NRC management oversight group (MOG) to provide NRC oversight of the Oconee Nuclear Station Recovery Plan, maintain an overview of Oconee performance during the recovery, and provide recommendations regarding NRC actions. This group will conduct a public meeting on April 22. 1998, to discuss these activities. In preparation for the meeting, the enclosed documents are provided for your information. is the approved charter for the MOG. This charter provides for coordinating a plant specific issue list with you and your staff, assessment of Oconee performance and consolidation of NRC activities. is a list of individual items from our inspection reports that were used as a basis for your most recent Systematic Assessment of Licensee Performance (SALP) rating. These items are tracked via a Plant Issues Matrix (PIM) maintained by the NRC. While the PIM is currently not a public document, the information is contained in various inspection reports as indicated in the Enclosure. This list is arranged in categories based upon a template used during the senior management meeting. This arrangement will allow for monitoring of Oconee performance by comparing SALP period performance with future performance by using updates to the PIM. While we are using the recent SALP report as a baseline assessment, events and issues since issuance of that report were also considered in establishing the MOG. is a listing of-issues that the MOG intends to monitor and discuss at the public meeting. While this list is comprehensive, more items may be added or deleted as the MOG implements this effort.

As stated in the charter, our bi-monthly meetings will continue. A recommendation to the Regional Administrator that MOG activities are complete will be based on satisfactory progress of your Recovery Plan, significant completion of the MOG Issues Checklist, and a successful performance assessment by evaluation of the PIM.

Sincerely, Original signed by Charles A. Casto Charles A. Casto, Deputy Director Division of Reactor Projects 9804210227 980415 PDR ADOCK 05000269 G

PDR

Duke Energy Corporation 2

Docket Nos. 50-269, 50-270. 50-287 License Nos. DPR-38. DPR-47, DPR-55

Enclosures:

1.

Approved Oconee Charter

2.

Oconee MOG Analysis of PIM Data From Previous SALP Period

3.

Oconee Recovery Plan Issues Checklist cc w/encls:

J. E. Burchfield Compliance Duke Energy Corporation P. 0. Box 1439 Seneca, SC 29679 Paul R. Newton Duke Energy Corporation 422 South Church Street Charlotte, NC 28242-0001 Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Robert B. Borsum Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 J. Michael McGarry, III, Esq.

Winston and Strawn 1400 L Street, NW Washington, D. C. 20005 Mel Fry. Acting Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 cc w/encls:

(cont'd see page 3)

Duke Energy Corporation 3

cc w/encls:

(Cont'd)

Max Batavia, Chief Bureau of Radiological Health S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 County Supervisor of Oconee County Walhalla, SC 29621 Manager, LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 G. A. Copp Licensing - EC050 Duke Energy Corporation P. 0. Box 1006 Charlotte, NC 28201-1006 Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 0II

Duke Energy Corporation 4

Distribution w/encls:

D. LaBarge, NRR R. Carroll, RII C. Payne, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 78128 Rochester Highway Seneca, SC 29672 OFFICE RII:DRP HQ:NRR RDR SIGNATURE NAME COGLE MBERKOW K

DATE 4/

/98 4/

/98 4/

/98 4/

/98 4/

/98 4/

/98 4/

/98 COPY?

YES NO NO ES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY NT NAME:

P:\\OCOLTR.CHR