Refers to 980325 Meeting Conducted by Mutual Request in Atlanta,Ga Re Status of Plant Performance Issues.List of Attendees & Handout Encl
ML15261A167
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/01/1998
From: Ogle C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccollum W
DETROIT EDISON CO.
References
NUDOCS 9804080304
Download: ML15261A167 (36)


Text

CATEGORY 24 REGULATORY INFORMATION DISTRIBUTION SYSTEMAi.(RIDS)

ACCESSION NBR:9804080304 DOC.DATE: 98/04/01 NOTARIZED: NO DOCKET #

FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287 AUTH.NAME AUTHOR AFFILIATION.

OGLE,C.R.

Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION MCCOLLUM,W.R.

Detroit Edison Co.

SUBJECT:

Refers to 980325 meeting conducted by mutual request in C

Atlanta,GA re status of plant performance issues.List of A

attendees & handout encl.

DISTRIBUTION CODE: IE45D COPIES RECEIVED:LTR I ENCL SIZE:

37 T

TITLE: Summary of Significant Meeting with Licensee (Part 50)

E NOTES:

G RECIPIENT COPIES RECIPIENT COPIES 0

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1

1 LABARGE,D 1

1 R

INTERNAL: DEDRO 1

1 FILE CENTER 1

1 y

NRR/DRPM/PERB 1

1 1

1 RES/DET/EIB 1

1 RGN2 FILE 01 1

1 2

EXTERNAL:

NOAC 1

1 NRC PDR 1

1 D

.0 C

U M

E N

T NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

April 1, 1998 Duke Energy Corporation ATT.: Mr. W. R. McCollum Vice President Oconee Nuclear Station P. 0. Box 1439 Seneca. SC 29679

SUBJECT:

MEETING

SUMMARY

- OCONEE NUCLEAR STATION

Dear Mr. McCollum:

This refers to the meeting conducted by mutual request at the Region II offices in Atlanta, Georgia, on March 25. 1998, to discuss the status of plant performance issues. Enclosed are a list of attendees and your presentation handout.

It is our opinion that this meeting was beneficial in that it provided the NRC staff with a better understanding of Oconee Nuclear Station performance and your ongoing improvement initiatives. At the close of the meeting, you were informed of our intent to implement a management oversight group to keep abreast of Oconee recovery activities and emergent issues.

In accordance with Section 2.790(a) of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this meeting, please contact Mr. R. Carroll at (404) 562-4511.

Sincerely, Original signed by Michael Scott (for)

Charles R. Ogle. Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-269. 50-270. and 50-287 License Nos. DPR-38, DPR-47, and DPR-55

Enclosures:

1. List of Attendees
2. Licensee Presentation Handout cc:

(See page 2) 9804080304 980401 PDR ADOCK 05000269 P

PDR

DPC 2

cc cont'd:

cc cont'd:

Mr. J. E. Burchfield Manager, LIS Compliance NUS Corporation Duke Power Company 2650 McCormick Drive P. 0. Box 1439 Clearwater. FL 34619-1035 Seneca, SC 29679 Mr. G. A. Copp Mr. Paul R. Newton Licensing - E050 Legal Department (PBO5E)

Duke Energy Corporation Duke Energy Corporation P. 0. Box 1007 422 South Church Street Charlotte, NC 28201-1007 Charlotte. NC 28242-0001 Ms. Karen E. Long Mr. Robert P. Gruber Assistant Attorney General Executive Director N. C. Department of Justice Public Staff - NCUC P. 0. Box 629 P. 0. Box 29520 Raleigh, NC 27602 Raleigh, NC 27626-0520 Distribution:

Mr. Robert B. Borsum

0. LaBarge. NRR Framatome Technologies R. Carroll, RH 1700 Rockville Pike. Suite 525 C. Ogle, RII Rockville, MD 20852 C. Payne. RH PUBLIC Mr. J. Michael McGarry, III, Esq.

NRC Resident Inspector Winston and Strawn 1400 L Street, NW Washington. D. C. 20005 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources P. 0. Box 27687 Raleigh. NC 27611-7687 Mr. Max Batavia. Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 County Supervisor of Oconee County Walhalla, SC 29621 OFFICE RIl:

SIGNATURE DFATE I

/9 3/

/96 3/

/9 3/

/96 3/

/96 3/

/96 3/

/96 71M_____

no YES no YES No YES No YES

NoMO, N

Y OFFICIAL RECOD COPY DOCUMENT NAlE:

G:\\JqTUJ O8A.WP

LIST OF ATTENDEES Nuclear Regulatory Commission L. Reyes, Regional Administrator, Region II (RII)

J. Johnson. Deputy Regional Administrator, RII C. Casto. Deputy Director, Division of Reactor Projects (DRP). RII J. Jaudon: Director. Division of Reactor Safety (DRS), RII B. Mallett, Deputy Director, DRS, RII H. Berkow. Director. Project Directorate 11-2. Office of Nuclear Reactor Regulation (NRR)

C. Ogle. Chief, Branch 1, DRP, RII D. LaBarge, Project Manager, Project Directorate 11-2. NRR W. Rogers. Senior Reactor Analyst. DRS. RII K. Landis. Chief. Branch 3. DRP, RII M. Thomas, Acting Chief. Engineering Branch, DRS. RII R. Schin. Reactor Inspector, Engineering Branch. DRS. RII S. Woods, Health Physicist, Nuclear Materials Safety and Safeguards R. Carroll, Project Engineer. Branch 1. DRP, RII Oconee Nuclear Station OWW.

McCollum. Vice President. Oconee Nuclear Station (ONS)

J. Forbes. Station Manager. ONS W. Foster. Safety Assurance Manager. ONS M. Nazar, Engineering Manager. ONS E. Burchfield. Regulatory Compliance Manager, ONS ENCLOSURE 1

Oconee Nuclear Station Bi-Monthly Performance Meeting 0~eNudce March 25, 1998 1

ENCLOSURE 2

Purpose of Meeting

  • Plant Status
  • Expectations for 1998
  • Assessment of Recent Performance
  • Recovery Plan Focus Areas
  • Closing Remarks 2

Plant Status

  • Units l and 3 operating at 100% full power
  • Unit 2 refueling outage started March 13, 1998

- Planned 63 day outage

- Integrated Control System and Operator Aid Computer replacements

- Reactor coolant pump and steam generator inspections

- Service water modifications

  • Unit 3 refueling outage this fall 3

Expectations for 1998 Cultural changes Management expectations and standards Lower threshold for identifying problems Self assessment and benchmarking

- Process improvements

- Operational focus

- Human performance

  • Management of programs

- Design basis

- Equipment and system reliability 4

Expectations for 1998

  • Personnel Safety Index < 4
  • Nuclear System Events < 25
  • Effective Full Power Days > 924.35
  • Human Performance Index > 1.75
  • Station Radiation Exposure < 292 person-rem
  • Performance Indicator Index > 79.83
  • INPO Rating of 2 or.better 5

1998 RECOVERY PLAN FOCUS AREAS Operational Quality and Financial Safety of Operations Production Management I~Management F

PAc INy yuag Y

tho

)

Performance 8 Matheson 2%

RM I Westherford 80%

r Post-Job Briefs Quality TK McQuarrie 30%

RT Bond 2

u uirePrbe IndexPrevention NT T mesIndex MOD masur 10%L J Atrarette 20%

el 0IeTil Enh1ance R81tGcl~atu Problems S*0If Assessome nt ec npcatusn y

PrO*,6ProcesseuorOerain R T Bond 30%

R T Bond 26%

Prc dur s 10 KEYye tam

  • a y

KEY Performance LOW POINTS LJ Anarellnde 10%

OREEN 2.7 -.0 POIMTSB WHITE 0 POINT QUARTERLY 10 s

SATUS To gy97 CURRENT (MEASURF)

STATUs 6

Assessment of Recent Performance

  • Recovery Plan is addressing right issues
  • Progress being made
  • Too many lower level issues
  • Additional supervisor commitment required
  • Recovery Plan initiatives being expanded to drive further improvement

- Supervisory accountability

- Structured approaches for improvement 7

Assessment of Recent Performance

  • Accomplishments

- Strengthened management team

- Site awareness and direction on Recovery Plan achieved

- Significantly strengthened processes to improve lateral integration between Operations, Maintenance, and Engineering

- Significant reduction in the number of nuclear system events

Assessment of Recent Performance

  • Accomplishments

- Structured processes implemented for system/equipment reliability

- Rigorous engineering review of LPI and HPI systems

- Structure for human performance improvement g

- Significantly increased level of self assessment activity

Assessment of Recent Performance

  • Challenges

- Unit 2 refueling outage

- Supervisor commitment

- Culture change in self assessment

- Consistent use of 6 human performance tools

- Continue with identification and resolution of design basis issues 10

Assessment of Recent Performance Challenges

- Housekeeping

- Equipment life cycle management

- Work Control process

- Process improvements to reduce number of lower level issues 11

1998 Recovery Plan Continued focus on areas identified in 1997 plan

- Design Basis

- System/Equipment Reliability

- Human Performance

- Self Assessment

- Operational Focus

- Financial Management

  • Measures adjusted for 1998
  • Some changes in initiatives within focus areas
  • Largest adjustments in Operational Focus 12

Design Basis

  • Accomplishments Meeting schedules for projects
  • HPI Reliability Study completed
  • HPI/LPI SITA completed
  • 25 design basis calculations completed as part of Oconee Safety Related Designation Clarification (OSRDC)

Project

  • Emergency Power System Reliability Study completed
  • UFSAR review on schedule 13

Design Basis Challenges

- Continue with identification and resolution of design basis issues

- Service water modifications

- SQUG outlier resolution

-ITS implementation 0

- Resolution to Generic Letter 96-06 Configuration Management 14

Design Basis Changes for 1998:

Configuration management

  • Steering team established for focused oversight of configuration management
  • Configuration management assessment currently underway CRVS/PRVS Design
  • System improvements underway
  • Pursuing resolution of licensing basis issues with NRR EFW SITA this summer 15

System/Equipment Reliability Accomplishments Top Equipment Problem Resolution (TEPR) process is assuring proper priority on resolving equipment problems Structured processes implemented

  • System Teams
  • Fluid Leak Management
  • Control Room Instrument Problems (CRIPs)
  • Equipment Aging Program Large replacement projects almost completed

System/Equipment Reliability Top 15 Major Equipment Problems (MEPRa) Resolved Fluid Leak Management 120 100 aMEPRa Reved 80

  • identifled 2

60 in Data Base 40 a Resolved 1

20 0

1 i

II (D

0)0 Control Room Instrument Problems 120 100 gin Total 800

-=-

Workable 60

-- Goal for workable 80 40 20 0

I 17

System/Equipment Reliability Challenges

- Equipment life cycle management

- OAC and ICS implementation and follow up

- Station support on equipment reliability issues

- Improved focus on prevention and detection

- Control Rod Drive modifications 0

- Management of temporary modifications 18

System/Equipment Reliability

  • Changes for 1998:

Steam generator reliability until end of service life

  • Measures for system/equipment reliability

- Rework Index

- Equipment Failures

- Problem Prevention Index

- Equipment Deficiency Index

- System Reliability Performance Index

- Lost Generation Days Due to Equipment Failures 19

12 Total 97 Jan-98 Feb-98 Mar-98 Apr-98 May-98 (a

Jun-98 Jul-98 Aug-98 Sep-98 Oct-98 Nov-98 0=4 Dec-98 onOU 1

4

System/Equipment Reliability g

EFPDs Lost Due To Equipment Failures 120 100 Unit 12 Month Rolling Average 80 Target L.

60 w

20 0

1 1

0 21

Human Performance Accomplishments Increase in job observations and pre-job/post-job briefs

- Improved site-wide understanding of human performance tools

  • Challenges Improve deliberate implementation of human performance tools

- Strengthen supervisory involvement

- Consistent management drive for improvement 22

Human Performance

  • Changes for 1998

- Human performance tool training for contractors and vendors

- Implementation of real-time behavior based monitoring

  • Measures

- Culture Index

- Number of Observations and Pre-Job/Post-Job Briefs

- Problem Self-Identification Ratio.

23

Self Assessment

  • Accomplishments PIP backlog reduction

- PIP quality improvement

- Increased management observations and benchmarking

- Reduction in problem identification threshold

- Increase in number of assessments

  • Challenges

- Continued reductions in PIP backlog

- Continued improvement in PIP quality

- Self assessment cultural changes 24

Self Assessment

  • Changes for 1998

- Implementation of reorganized Independent Oversight Team Training and support for group assessment coordinators Focus on PIP problem evaluation cycle time

  • Measures

- PIP backlog

-PIP quality Number of manager observations, group assessments, and benchmarking trips Implementation progress on Independent Oversight Team 25

Self Assessment Corrective Actions > 6 months old 600 500 YTD ACTUAL 400 YTD TARGET 300 200 100_

0 co>

0 zz

>0

<0 W

0 oz 0

zL 26 U) 26

Operational Focus Accomplishments Improved Engineering Operational Focus

  • TEPR
  • Lateral integration with Operations Improved use of operating experience Procedure use and adherence expectations firmly internalized Structured process for assessing mispositionings 27

Operational Focus Challenges Operations Control Room / Board Monitoring Operating procedures Work Control process Outage readiness Housekeeping

-OAC Surveillance Testing 28

Operational Focus Changes for 1998

- Operating procedures

- Operations Control Room / Board Monitoring

- Housekeeping

- Surveillance Program

- Maintenance Technical Support 29

Operational Focus Changes for 1998

- Work Control Process

- OAC Recovery Plan

- Implement Single Point Access for Radiological Controls

-Unit 3 Outage Readiness 30

OfjlI III.AOprtoa Operational Focus

  • Measures

- Number of mispositionings

- Work Control/Maintenance effectiveness

- Unit 3 refueling outage readiness milestones Housekeeping

- Operations Control Board Monitoring

- TEPR effectiveness 31

Closing Remarks 32