CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9711250024 DOC.DATE: 97/11/10 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287 AUTH.NAME AUTHOR AFFILIATION OGLE,C.R.
Region 2 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION MCCOLLUM,W.R.
Duke Power Co.
C
SUBJECT:
Advises of planned insp effort resulting from ONS plant performance review,general time frame of planned insps &
A exact dates of team insps.
T DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR __ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E
NOTES:
G RECIPIENT COPIES RECIPIENT COPIES 0
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1
1 LABARGE,D 1
1 R
INTERNAL: ACRS 2
2 AEOD/SPD/RAB 1
1 ECV-c:,,1 1
DEDRO 1
1
<1EN 1
NRR/DISP/PIPB 1
1 NRR/DRCH/HHFB 1
1 NRR/DRPM/PECB 1
1 2
NRR/DRPM/PERB 1
1 NUDOCS-ABSTRACT 1
1 OE DIR 1
1 OGC/HDS2 1
1 RGN2 FILE 01 1
1 D
EXTERNAL: LITCO BRYCE,J H 1
1 NOAC 1
1 NRC PDR 1
1 NUDOCS FULLTEXT 1
1 0
C U
M E
N T
NOTE TO ALL "RIDS RECIIENTS:
PLEASE HELP US TO HAVE YOUR NAME OR CRGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE NUMOER OF OFIES RECEIVET SN YCU IR OUR TROANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCDI CN EXTENSION 415-21%
TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20
IS November 10, 1997 Duke Power Company ATTN: Mr. W. R. McCollum Vice President Oconee Nuclear Station P. 0. Box 1439 Seneca. SC 29679
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - OCONEE NUCLEAR STATION
Dear Mr. McCollum:
On October 15, 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of Oconee Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Oconee Nuclear Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period of March - September 1997.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Oconee Nuclear Station PPR review and the general time frame of planned inspections plus the exact dates of team inspections. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months.
Individual inspections are identified by the month(s) in which we intend to conduct the inspection. Exact dates are not provided for non-team inspections because experience has proven that we must often change dates as the result of higher priority requirements and conflicts at your site or other sites. You will be contacted three-six weeks prior to individual inspections to confirm dates. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
The NRC's general policy for reactor inspections is that each inspection shall be announced, except when announcing the inspection could reasonably compromise the objectives of the inspectors. Therefore, some specific inspections, such as in the security and radiological protection areas, may not be announced.
As part of the regional initiative inspection program, we plan to conduct followup inspections of fire barrier penetration seal issues during the next six months. The issues are discussed in Information Notice (IN) 88-04, 9711250024 971110 i'111'li a m 2 0 02.
n o 111111111 11111171111 11111111111 PDR ADOCK 05000269
. 11111 1 11 (iPDR 2
'41
DEC 2
"Inadequate Qualification and Documentation of Fire Barrier Penetration Seals," and IN 88-56, "Potential Problems with Silicone Foam Fire Barrier Penetration Seals."
The specific plants that will be inspected have not yet been determined. We will notify you separately if the inspections are scheduled at your facility in the next six months.
We will inform you of any changes to the inspection plan. If you have any questions. please contact me at 404-562-4510.
Sincerely.
Original signed by:
Charles R. Ogle. Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-269. 50-270, 50-287 License Nos. DPR-38. DPR-47. DPR-55
Enclosure:
Inspection Plan cc w/encl:
Mr. J. E. Burchfield Compliance Duke Energy Corporation P. 0. Box 1439 Seneca, SC 29679 Mr. Paul R. Newton Legal Department (PB05E)
Duke Energy Corporation 422 South Church Street Charlotte, NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh. NC 27626-0520 Mr. Robert B. Borsum Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 cc w/encl cont'd:
(See page 3)
DEC 3
cc w/encl cont'd:
Distribution w/encl:
Mr. J. Michael McGarry, III. Esq.
D. LaBarge, NRR Winston and Strawn R. Carroll. RII 1400 L Street. NW C. Ogle, RII Washington. D. C. 20005 K. Barr, RII H. Christensen. RII Mel Fry, Acting Director A. Belisle. RII Division of Radiation Protection P. Fredrickson. RII N. C. Department of Environmental C. Payne. RII Health & Natural Resources PUBLIC 3825 Barrett Drive Raleigh. NC 27609-7721 NRC Resident Inspector U.S. Nuclear Regulatory Comm.
Mr. Max Batavia, Chief 78128 Rochester Highway Bureau of Radiological Health Seneca, SC 29672 South Carolina Department of Health
-and Environmental Control 2600 Bull Street Columbia, SC 29201 County Supervisor of Oconee County Walhalla, SC 29621 Manager. LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 Mr. G. A. Copp Licensing - ECO50 Duke Energy Corporation P. 0. Box 1006 Charlotte, NC 28201-1006 Ms. Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 nEELEE
- DR RII:DRS RIJ:DRS RII:DRS SIGNATURE C
N ABL NAME RR HCRISENS ABELISLE PFR 14ICKS DATE
_1 LLvZ_
10/
/97 AI
/97 10/ 1 /97
_1/7 OFFICIAL RECORD COPY DOCUMENT NAME:
\\OCOLET.997
OCONEE NUCLEAR STATION INSPECTION PLAN INSPECTION PLANNED PROCEDURE/
TITLE NUMBER OF INSPECTION TYPE OF INSPECTION - COMMENTS TEMPORARY INSPECTORS DATES INSTRUCTION IP 40500 EFFECTIVENESS OF LICENSEE 4
1/26-30/98 Core - a multi-disciplined team CONTROLS IN IDENTIFYING.
2/2-6/98 to assess licensee corrective RESOLVING. AND PREVENTING action/self assessment.
PROBLEMS IP 71714 COLD WEATHER PREPARATIONS 1 (RI) 12/97 Regional Initiative - seasonal region-wide initiative IP 60855 ISFSI (Loading) 1 (pending load Regional Initiative - ISFSI schedule) loading operations (DRP review)
IP 62700 MAINTENANCE IMPLEMENTATION 1
1/98 Regional Initiative - to 3/98 observe conduct of online maintenance.
IP 73753 INSERVICE INSPECTION 1
(Ul) 11/97 Regional Initiative (Ul) 2/98 current Unit 1 outage to verify adequacy of HPI pipe
- (U2) 2/98 installation, SG tube repairs.
IP 55050 NUCLEAR WELDING GENERAL and review the LPSW INSPECTION PROCEDUREand (U2) ISI for INSPETIONPROCDUREupcoming Unit 2 outage and LPSW modifications.
IP 37550 ENGINEERING 1
3/98 Core-Including a review of 437550 ENGINEERING
/98 the Unit 2 LPSW/CCW I modifications.
ENCLOSURE Page 1 of 3
(OCOINSP.997 cont'd)
INSPECTION PLANNED PROCEDURE/
TITLE NUMBER OF INSPECTION TYPE OF INSPECTION - COMMENTS TEMPORARY INSPECTORS DATES INSTRUCTION IP 92903 FOLLOWUP - ENGINEERING 1
1/98 Regional Initiative - Open items follow-up inspection, to include Deviation 94-24-04 regarding penetration room ventilation discrepancies and GL 96-06.
IP 93809 SAFETY SYSTEM ENGINEERING 4
3/2-6/98 Core - EFW SSEI recommended as INSPECTION 3/16-20/98 a result of 50.54f letter review.
IP 37550 ENGINEERING TBD Regional Initiative - Keowee electrical followup inspection after licensee's electrical reliability study (10-12/97) and issuance of NRR' s final Oconee electrical system
______________report.
IP 83750 OCCUPATIONAL EXPOSURE 1
3/98 Core - Focus on Radiation Protection Controls IP 84750 RADIOACTIVE WASTE SYSTEMS, WATER 1
2/98 Core CHEMISTRY, CONFIRMATORY MEASUREMENTS AND RADIOLOGICAL ENVIRONMENTAL MONITORING IP 86750 SOLID RADIOACTIVE WASTE 1
2/98 Core MANAGEMENT AND TRANSPORTATION OF RADIOACTIVE MATERIALS IP 60855 ISFSI (Loading) 1 (pending load Regional Initiative - ISFSI HP schedule) activities (DRS-HP aspects)
IP 81700 PHYSICAL SECURITY PROGRAM FOR 1
12/97 Core POWER REACTORS ENCLOSURE Page 2 of 3
(OCOINSP.997 cont'd)
INSPECTION PLANNED PROCEDURE/
TITLE NUMBER OF INSPECTION TYPE OF INSPECTION - COMMENTS TEMPORARY INSPECTORS DATES INSTRUCTION IP 60854 IISFSI (Dry Run/Loading) 1 (pending load Regional Initiative - Heavy IP 60855 schedule) oneerina review) i ENCLOSURE Page 3 of 3