,*,1REG&4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 5, 1997 ORGANIZATION: Duke Power Company
SUBJECT:
SUMMARY
OF MEETING WITH DUKE POWER COMPANY ON LICENSE RENEWAL ACTIVITIES FOR OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 On July 17, 1997, the Nuclear Regulatory Commission (NRC) staff met with representatives of Duke Power Company (Duke) to provide staff feedback on the electrical and structural examples provided to the staff by Duke at a June 3, 1997, meeting (see the NRC meeting summary dated June 26, 1997).
The specific areas for which Duke requested feedback regarding level of detail needed for an application were identified in a June 10, 1997, Duke letter. A list of meeting attendees is provided in Attachment 1.
At the meeting, the NRC staff provided comments in the specific areas requested by Duke as well as additional format and content comments identified by the staff. Attachment 2 was provided by the staff to illustrate the type of information requested for cables. Although a comprehensive review to determine the completeness or technical adequacy of the examples was not performed by the staff, a number of technical comments were identified and were provided to Duke at the meeting to illustrate the type of information and level of detail needed for a complete submittal.
The staff's comments provided at the meeting were subsequently documented in its letter to Duke dated August 4, 1997.
Subject to the comments contained in the August 4 letter, the staff indicated that the examples provide the type of information that if provided for the complete submittal should result in submittals with format and content sufficient for the staff to begin a technical review.
Stephen T. Hoffman, Senior Project Manager License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287 Attachments: As Stated cc w/encls: See next page R. L. Gill, Duke Power 9708080118 970805,
PDR ADOCK 05000269 P
PDR NBC__ FOE CINE WN Ull l
3IIIII I ll l l 1111 1
E
Oconee Nuclear Station Units 1, 2, and 3 cc:
Mr. Paul R. Newton Mr. Ed Burchfield Duke Power Company, PBO5E Compliance 422 South Church Street Duke Power Company Charlotte, North Carolina 28242-0001 Oconee Nuclear Site P. 0. Box 1439 J. Michael McGarry, III, Esquire Seneca, South Carolina 29679 Winston and Strawn 1400 L Street, NW.
Ms. Karen E. Long Washington, DC 20005 Assistant Attorney General North Carolina Department of Mr. Robert B. Borsum Justice Framatome Technologies P. 0. Box 629 Suite 525 Raleigh, North Carolina 27602 1700 Rockville Pike Rockville, Maryland 20852 Mr. G. A. Copp Licensing -
ECO50 Manager, LIS Duke Power Company NUS Corporation 526 South Church Street 2650 McCormick Drive, 3rd Floor Charlotte, North Carolina 28242-0001 Clearwater, Florida 34619-1035 Richard Fry, Director Senior Resident Inspector Division of Radiation Protection U.S. Nuclear Regulatory Commission North Carolina Department of Route 2, Box 610 Environment, Health, and Seneca, South Carolina 29678 Natural Resources P. 0. Box 27687 Regional Administrator, Region II Raleigh, North Carolina 27611-7687 U. S. Nuclear Regulatory Commission Atlanta Federal Center Mr. William R. McCollum, Jr.
61 Forsyth Street, S.W., Suite 23T85 Vice President, Oconee Site Atlanta, Georgia 30303 Duke Power Company P. 0. Box 1439 Max Batavia, Chief Seneca, South Carolina 27679 Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 County Supervisor of Oconee County Walhalla, South Carolina 29621
ATTENDANCE LIST NRC MEETING WITH DUKE POWER COMPANY July 17, 1997 NAME ORGANIZATION
- 1. Steve Hoffman NRC/NRR/PDLR
- 2. Robert Gill Duke
- 3. Debra Ramsey Duke
- 4. Paul Colaianni Duke
- 5. John Rycyna BGE
- 6. Paul W. Thomas PECO Energy
- 7. William M. Denny OGDEN Environmental & Energy
- 8. Tricia Heroux for EPRI
- 9. Anne CottingilhIm Winston & Strawn
- 10. Kathryn Sutton Winston & Strawn
- 11. Vincent Sacco GPU Nuclear
- 12. Christopher Kudla Entergy
- 13. Steven Toney Duke Power
- 14. P. T. Kuo NRC/DRPM/PDLR
- 15. Chris Grimes NRC/DRPM/PDLR
- 16. Christopher M. Regan NRC/DRPM/PDLR
- 17. Paul Shemanski NRC/DE/EELB
- 18. Mark Pratt NRC/DE/EELB
- 19. Winston W. C. Liu NRC/DRPM/PDLR
- I/--
-7 7 -2 VO6L, 3 Table 1 Cable Products Included in the Test Program Note: Cables discussed in this volume are shown in boldface.
SuDplier DES:rdf0 L
Brand Rex 30 mil XLPE Insulation, 60 mil CSPE Jacket, 12 AWG, 3/C, 600 V
- 2.
Rockbestos Firewall III 30 mil I XIPE, 45 mil Neoprene Jacket, 12 AWG, 3/C, 600 V
- 3.
Raychem Flamtrol, 30 mil XLPE Insulation, 12 AWG, 1/C, 600 V
- 4.
Samuel Moore Dekoron Polyset, 30 mil XLPO Insulation, 45 mil CSPE Jacket, 12 AWG, 3/C and Drain, 600 V
- 5. Anaconda Anaconda Y Flame-Guard FR-EP, 30 mil EPR Insulation, 45 mil CPE Jacket, 12 AWG, 3/C, 600 V Sa. Anaconda
- Anaconda Flame-Guard EP, 30 mil EPR Insulation, 15 mil Individual CSPE Jackets, 45 mil Overall CSPE Jacket, 12 AWG, 3/C, 1000 V
- 6.
Okonite Okonite Okolon, 30 mil EPR Insulation, 15 mil CSPE Jacket, 12 AWG, 1/C, 600 V
- 7.
Samuel Moore Dekoron Dekorad Type 1952, 20 mil EPDM Insulation, 10 mil Individual CSPE Jackets, 45 mil Overall CSPE Jacket, 16 AWG, 2/C TSP, 600 V
- 8.
Kerite Kerite 1977,70 mil FR Insulation, 40 mil FR Jacket, 12 AWG, 1/C, 600 V 8a. Kerite Kerite 1977, 50 mil FR Insulation, 60 FR Jacket, 12 AWG, 1/C, 600 V
- 9.
Rockbestos RSS-6-104/LE Coaxial Cable, 22 AWG, 1/C Shielded
- 10. Rockbestos 30 mil Firewall Silicone Rubber Insulation, Fiberglass Braided Jacket, 16 AWG, 1/C, 600 V
- 11. Champlain 5 mil Polyimide (Kapton) Insulation, Unjacketed, 12 AWG, 1/C
- 12. BIW Bostrad 7E, 30 mil EPR Insulation, 15 mil Individual CSPE Jackets, 60 mil Overall CSPE Jacket, 16 AWG, 2/C TSP, 600 V This cable was only used for the multiconductor samples in the 3-month chamber.
Note: See nomenclature section for abbreviations.
August 5, 1997 ORGANIZATION:
Duke Power Company
SUBJECT:
SUMMARY
OF MEETING WITH DUKE POWER COMPANY ON LICENSE RENEWAL ACTIVITIES FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 On July 17, 1997, the Nuclear Regulatory Commission (NRC) staff met with representatives of Duke Power Company (Duke) to provide staff feedback on the electrical and structural examples provided to the staff by Duke at a June 3, 1997, meeting (see the NRC meeting summary dated June 26, 1997).
The specific areas for which Duke requested feedback regarding level of detail needed for an application were identifiedin a June 10, 1997, Duke letter. A list of meeting attendees is provided in Attachment 1.
At the meeting, the NRC staff provided comments in the specific areas requested by Duke as well as additional format and content comments identified by the staff. Attachment 2 was provided by the staff to illustrate the type of information requested for cables. Although a comprehensive review to determine the completeness or technical adequacy of the examples was not performed by the staff, a number of technical comments'were identified and were provided to Duke at the meeting to illustrate the type of information and level of detail needed for a complete submittal.
The staff's comments provided at the meeting were subsequently documented in its letter to Duke dated August 4, 1997.
Subject to the comments contained in the August 4 letter, the staff indicated that the examples provide the type of information that if provided for the complete submittal should result in submittals with format and content sufficient for the staff to begin a technical review.
Original signed by:
Stephen T. Hoffman, Senior Project Manager License.Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287 Attachments: As Stated cc w/encls: See next page R. L. Gill, Duke Power DOCUMENT NAME: A:DUKE00717.MTS (S.
Hoffman/LLM Disk)
To receive a copy of this document, Indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE SPM:PDLR EVLJ D:PDLR I
NAME SHoffman:avl CGrimes DATE 08/-5/97 08/6/9 OFFICIAL RECORD COPY
Meeting Summary HARD COPY Db-ket Tileh4A PUBLIC PDLR R/F OEDO RIV Coordinator, 0-17G21 E-MAIL:
S. Collins/F. Miraglia (SJC1/FJM)
R. Zimmerman (RPZ)
M. Slossom (MMS)
S. Weiss (SHW)
P. Shemanski (PCS)
M. Pratt (MDP)
R. Correria (RPS)
R. Wessman (RHW)
J. Strosnider (JRS2)
S. Droggitis (SCD)
S. Peterson (SRP)
G. Lainas (GCL)
B. Morris (BMM)
J. Moore (JEM)
G. Mizuno (GSM)
G. Holahan (GMH)
B. Sheron (BWS)
M. Mayfield (MEM2)
A. Murphy (AJM1)
H. Brammer (HLB)
L. Shao (LCS1)
G. Bagchi (GXB1)
R. Johnson (REJ)
D. LaBarge (DEL)
H. Berkow (HNB)
PDLR Staff