ML15253A413

From kanterella
Jump to navigation Jump to search
Notification of 990120 Meeting with Util in Rockville,Md to Discuss Various Licensing Issues Re Catawba,Mcguire & Oconee Nuclear Stations
ML15253A413
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 01/11/1999
From: Labarge D
NRC (Affiliation Not Assigned)
To: Berkow H
NRC (Affiliation Not Assigned)
References
NUDOCS 9901130239
Download: ML15253A413 (6)


Text

January 11, 1999 MEMORANDUM TO: Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11, NRR FROM:

David E. LaBarge, Senior Project Manager Original signed by:

Project Directorate 11-2 Division of Reactor Projects - 1/11, NRR

SUBJECT:

FORTHCOMING COUNTERPARTS MEETING WITH DUKE ENERGY CORPORATION DATE & TIME:

Wednesday, January 20, 1999 9:00 a.m. - 3:00 p.m.

LOCATION:

Duke Energy Corporation Headquarters Building Charlotte, North Carolina PURPOSE:

To discuss various licensing issues related to the Catawba, McGuire, and Oconee Nuclear Stations PARTICIPANTS:*

NRC/NRR Duke Energy Corporation W. Beckner, NRR M. Tuckman M. Cash H. Berkow, NRR J. Fisicaro K. Canady D. LaBarge, NRR L. Keller J. Davis P. Tam, NRR J. Burchfield R. Lytton F. Rinaldi, NRR G. Gilbert L. Plisco, Region II Docket Nos. 50-269, 50-270, 50-287, 50-369, Distribution:

50-370, 50-413, and 50-414 See next page

Attachment:

Agenda cc w/att: See next page

Contact:

David E. LaBarge, NRR (301) 415-1472

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to "Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Register 48344, 9/20/94. Persons who wish to observe should contact the project manager at 301-415-1472 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before the meeting.

9901130239 990111 R

ADOCK 05000269 P

PDR To receive a copy of this document, indicate in the box: "C" = Copy without attachment "E" = Copy with attachment/enclosurq,. "N" = Nqpy OFFICE PM:

I L

LA:PDII-

)

D:PPII NAME DL ar e:cn L. Berry _

H. erk DATE I 11(/99

/99

/

it9

/ 199

/

/99

/ /97 DOCUMENT NAME: G:\\OCONEE\\CPSMTG.W D OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 11, 1999 MEMORANDUM TO: Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11, NRR FROM:

David E. LaBarge, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - 1/11, NRR

SUBJECT:

FORTHCOMING COUNTERPARTS MEETING WITH DUKE ENERGY CORPORATION DATE & TIME:

Wednesday, January 20, 1999 9:00 a.m. - 3:00 p.m.

LOCATION:

Duke Energy Corporation Headquarters Building Charlotte, North Carolina PURPOSE:

To discuss various licensing issues related to the Catawba, McGuire, and Oconee Nuclear Stations PARTICIPANTS:*

NRC/NRR Duke Energy Corporation W. Beckner, NRR M. Tuckman M. Cash H. Berkow, NRR J. Fisicaro K. Canady D. LaBarge, NRR L. Keller J. Davis P. Tam, NRR J. Burchfield R. Lytton F. Rinaldi, NRR G. Gilbert

.- PliscoRegion-L Docket Nos. 50-269, 50-270, 50-287, 50-369, 50-370, 50-413, and 50-414

Attachment:

Agenda cc w/att: See next page

Contact:

David E. LaBarge, NRR (301) 415-1472

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to "Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Register 48344, 9/20/94. Persons who wish to observe should contact the project manager at 301-415-1472 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before the meeting.

Meeting Notice dated January 11.

1999 E-Mail S. Collins/R. Zimmerman (SJC1//RPZ)

B. Boger (BAB2)

J. Zwolinski H. Berkow L. Berry OPA (e-mail to OPA)

W. Beckner P. Tam F. Rinaldi L. Plisco, RII M. Tschiltz (MDT)

K. Clark (KMC2)

PMNS (Meeting Announcement Coordinator)

Hard Copy Docket File PUBLIC PD 11-2 Rdg.

D. LaBarge OGC ACRS cc: Licensee & Service List

Catawba, McGuire, Oconee Nuclear Stations cc:

Dr. John M. Barry Mr. Rick N. Edwards Mecklenburg County Framatome Technologies Department of Environmental Suite 525 Protection 1700 Rockville Pike 700 N Tryon Street Rockville, Maryland 20852 Charlotte, North Carolina 29202 Manager, LIS County Manager of Mecklenburg County NUS Corporation 720 East Fourth Street 2650 McCormick Drive, 3rd Floor Charlotte, North Carolina 28202 Clearwater, Florida 34619-1035 Mr. Michael T. Cash Senior Resident Inspector Regulatory Compliance Manager U.S. Nuclear Regulatory Commission Duke Energy Corporation 7812B Rochester Highway McGuire Nuclear Site Seneca, South Carolina 29672 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Mr. G. R. Peterson Site Vice President Senior Resident Inspector Catawba Nuclear Station c/o U.S. Nuclear Regulatory Duke Energy Corporation Commission 4800 Concord Road 12700 Hagers Ferry Road York, South Carolina 29745 Huntersville, North Carolina 28078 Mr. H. B. Barron Mr. Richard M. Fry, Director Vice President, McGuire Site Division of Radiation Protection Duke Energy Corporation

_____~~North.Carolina.Department. ofo-So2700utHagers Ferry Road Environment, Health, and Natural Huntersville, North Carolina 28078 Resources 3825 Barrett Drive Mr. William R. McCollum Raleigh, North Carolina 27609-7721 Vice President, Oconee Site Divsio-o RaiatonProectonDuke Energy Corporation County Supervisor of Oconee County, P. 0. Box 1439 Wahalla, South Carolina 27621 Seneca, South Carolina 29679 Elaine Wathen, Lead REP Planner North Carolina Electric Membership Division of Emergency Management Corporation 116 West Jones Street P. 0. Box 27306 Raleigh, North Carolina_2760-3 Raleigh, North Carolina 2761t Mr. T. Richard Puryear Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745

Catawba, McGuire, Oconee Nuclear Stations cc:

Mr. Gary Gilbert Saluda River Electric Cooperative, Regulatory Compliance Manager Inc.

Duke Energy Corporation P.0. Box 929 4800 Concord Road Laurens, South Carolina 29360 York, South Carolina 29745 Senior Resident Inspector Ms. Lisa F. Vaughn U.S. Nuclear Regulatory Commission Legal Department (PBO5E) 4830 Concord Road Duke Energy Corporation York, South Carolina 29745 422 South Church Street Charlotte, North Carolina 28201-1006 Regional Administrator, Region 11 U.S. Nuclear Regulatory Commission J. Michael McGarry, III, Esquire Atlanta Federal Center Winston and Strawn 61 Forsyth Street, S.W., Suite 23T85 1400 L Street,.NW.

Atlanta, Georgia 30303 Washington, DC 20005 Virgil R. Autry, Director North Carolina Municipal Power Division of Radioactive Waste Management Agency Number 1 Bureau of Land and Waste Management 1427 Meadowwood Boulevard Department of Health and Environmental P. 0. Box 29513 Control Raleigh, North Carolina 27626 2600 Bull Street Columbia, South Carolina 29201 Mr. Steven P. Shaver Senior Sales Engineer Ms. Karen E. Long Westinghouse Electric Company Assistant Attorney General

---5929 Carnegie Blvd.---------


North Carolina Department-of Justice Suite 500 P. 0. Box 629 Charlotte, North Carolina 28209 Raleigh,, North Carolina 27602 lCounty Manager of York County eL.

A. Keller York County Courthouse

-Manager

- Nuclear Regulatory York, South Carolina 29745 Licensing Duke Energy Corporation Piedmont Municipal Power Agency, 526 South Church Street 121 Village Drive Charlotte, North Carolina 28201-1 006 Greer, South Carolina 29651

______Mr.,Ed Burchfield -

Compliance Duke Energy Corporation Oconee Nuclear Site P. 0. Box 1.439 Seneca, South Carolina 29679

Duke Energy Corporation - NRC Counterparts Meeting January 20, 1999 AGENDA Time Togic Discussion Leader 9:00.a.m. Introductions, D. LaBarge, M. Tuckman 9:15 General Duke Status/1999 Direction M. Tuckman 9:35 Engineering Items of Interest, With Emphasis K. Canady on Licensing Actions/Activities (Fuel Transition, Chapter 15 Reanalysis, Mixed Oxide Fuel, Oconee Steam Generator Replacement) 10:00 Station Support Items of Interest, With Emphasis J. Davis on Licensing Actions/Activities 10:05 Nuclear Assessment and Issues Division J. Fisicaro Items Of Interest, With Emphasis on Licensing Actions/Activities 10:15 Ice Condenser Technical Specifications R. Lytton/W. Beckner Improvement Plans 10:30 Break 10:40 Improved Standard Technical Specification W. Beckner, NRR PMs, Conversion Experience, Critique, and L. Keller Recommendations 11:00 Discussion on Revised Notice of Enforcement H. Berkow Discretion Guidance 11:15 NRC Focus Areas, Organizations and Processes L Plisco

  • Region II
  • Licensee Performance Assessment Program
  • Enforcement Program Changes Noon Lunch 1:00 p.m.-Anticipated Site Submittals for 1999 J-Burchfieldf M.-Cash, G. Gilbert 1:45 Other Discussion Items:
  • Electronic Submittals Program Status D. LaBarge
  • Feedback on Revised Request For L. Keller Additional Information Process
  • Other items as appropriate Anyone 3:00 Meeting Adjourned