4.
0
0
4
R REG& I
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
In Reply Refer To:
JUL 2
1980
RII:BRC
50-270/80-19
Duke Power Company
ATTN:
W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178.
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by B. R. Crowley of this office on
June 17-18,
1980,
of activities authorized by NRC Operating License No. DPR-47
for the Oconee facility, and to the discussion of our findings held with J. M. Davis
at the conclusion of the inspection.
Areas. examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice",
Part 2,
Title 10,
Code
^of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it
is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
C. E. Murphy, Ch ef
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
80073 o
Duke Power Company
-2-
JUL 2 1980
Enclosure:
Inspection Report No. 50-370/80-19
cc w/encl:
J. E. Smith, Station Manager
0