ML15251A143

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-270/80-19 on 800617-18.No Noncompliance Noted
ML15251A143
Person / Time
Site: Oconee 
Issue date: 07/02/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15251A142 List:
References
NUDOCS 8007310495
Download: ML15251A143 (2)


See also: IR 05000270/1980019

Text

4.

0

0

4

R REG& I

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

In Reply Refer To:

JUL 2

1980

RII:BRC

50-270/80-19

Duke Power Company

ATTN:

W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178.

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by B. R. Crowley of this office on

June 17-18,

1980,

of activities authorized by NRC Operating License No. DPR-47

for the Oconee facility, and to the discussion of our findings held with J. M. Davis

at the conclusion of the inspection.

Areas. examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2,

Title 10,

Code

^of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it

is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Ch ef

Reactor Construction and Engineering

Support Branch

Enclosure:

(See Page 2)

80073 o

Duke Power Company

-2-

JUL 2 1980

Enclosure:

Inspection Report No. 50-370/80-19

cc w/encl:

J. E. Smith, Station Manager

0