aRE
UNITED STATES
o
NUCLEAR REGULATORY COMMISSION
REGION 1I
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30303
In Reply Refer To:
R.I:W
SEP 2 0 1978
50-269/78-17
50-270/78-17
50-287/78-18
Duke Power Company
Attn:
Mr. William 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. W. J. Millsap of this
office on August 7, 1978, of activities authorized by NRC Operating
License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station
Units 1, 2 and 3 facilities, and to the discussion of our findings held
with Mr. J. E. Smith at the conclusion of the inspection.
Within the scope of this inspection, no items of noncompliance were
disclosed.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
In accordance with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear
from you in this regard within the specified period, the report
will be placed in the Public Document Room.
00
SEP 2 0 797e
Duke Power Company
-2
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report Nos.
50-269/78-17
50-270/78-17
50-287/78-18
cc w/encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. 0. Box 1175
Seneca, South Carolina 29678
0