EJDISON KNISOUTHERN CALIFORNIA Thomas J. Palhnisano Vice President Decommissioning &

Chief Nuclear Officer An EDISON INTERNATIONAL Company 10 CFR 50.90 August 27, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 License Amendment Request (LAR) for Revision to Cyber Security Plan Implementation Schedule Completion Date Supplement I to Amendment Application Numbers 269 and 254 San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

(1) Letter from Thomas J. Palm isano (SCE) to Document Control Desk (NRC) dated .November 12, 2014;

Subject:

Docket Nos. 50-361 and 50-362, License Amendment Request (LAR) for Revision to Cyber Security Plan, Implementation Schedule Completion Date, Amendment Application Numbers 269 and 254, San Onofre Nuclear Generating Station, Units 2 and 3 (ADAMS Accession No. ML14321A015)

Dear Sir or Madam:

This letter submits Supplement 1 to Southern California Edison (SCE) letter dated November 12, 2014 (Reference 1) which submitted a License Amendment Request (LAR) to change the implemen~tation date fo~r the SONGS Cyber S~ecurity Plan, _Implementation_ Milestone 8.- ....

This Supplement, based on recent discussions with NRC and for consistency with recent precedents, proposes a slightly different change to the License Condition (Paragraph 2.E of Facility Operating License Nos. NPF-1 0 and NPF-1 5) than was included as part of the Reference 1 LAR. The proposed change to the License Condition also utilizes the most current version of the SONGS Units 2 and 3 Facility Operating License pages (i.e., issued as part of Amendments 230 and 223, respectively) and supersedes the changes in Reference 1.

This LAR will become effective upon issuance by the NRC. SCE intends to implement the approved amendment within a period of 30 days following issuance but no later than December 31, 2015.

There are no new regulatory commitments in this submittal.

P.O. Box 128 San Clemente, CA 92674 (949) 368-6575 Fax: (949) 368-6183 tom~palmisano@sce.com

Document Control Desk2 2 If you have any questions or require additional information, please contact Mr. Mark Morgan at (949) 368-6745.

Sincerely, : License Condition 2.E Marked-Up Pages : License Condition 2.E Clean-Typed Pages cc: M. L. Dapas, Regional Administrator, NRC Region IV T. J. Wengert, NRC Project Manager, SONGS Units 2 and 3 R. L. Kellar, Region IV, Branch Chief, Repository and Spent Fuel Safety S. Y. Hsu, California Department of Public Health, Radiologic Health Branch

ATTACHMENT 1 Proposed Facility Operating License Mark-Up Pages

Unit 2 Facility Operating License Page E. SCE shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21 is entitled: "San Onofre Nuclear Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letter dated May 15, 2006. SCE shall fully implement and maintain as supplemented bya in effect all provisions of the Commission-approved cyber security plan (CSP),

change approved b: Y including changes made pursuant to the authority of 10 CFR 50.90 and License Amendmer nt 10 CFR 50.54(p). The SONGS CSP was approved by License Amendment XXX No. 225*

t F. This license is subject to the following additional condition for the protection of the environment:

Before engaging in activities that may result in a significant adverse environmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement, SCE shall provide a written notification of such activities to the NRC Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities.

G. DELETED H. SCE shall notify the Commission, as soon as possible but not later than one hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.

SCE shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

J. Deleted I

Amendment No. 2-O

Unit 3 Facility Operating License Page Report. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.

E. SCE shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21 is entitled: "San Onofre Nuclear Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2' submitted by letter dated May 15, 2006. SCE shall fully implement and maintain

,as supplemented by a in effect all provisions of the Commission-approved cyber security plan (CSP),

change approved by including changes made pursuant to the authority of 10 CFR 50.90 and License Amendment 10 CFR 50.54(p). The SONGS CSP was approved by License Amendment XXX No. 218#

F. This license is subject to the following additional condition for the protection of the environment:

Before engaging in activities that may result in a significant adverse environmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement, SCE shall provide a written notification of such activities to the NRC Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities.

G. DELETED H. SCE shall notify the Commission, as soon as possible but not later than one hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.

SCE shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

Amendment No. 2-1-s iRov iso by lct ated March, 6, 2007

ATTACHMENT 2 Proposed Facility Operating License Clean-Typed Pages

Unit 2 Facility Operating License Page E. SCE shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21 is entitled: "San Onofre Nuclear Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2' submitted by letter dated May 15, 2006. SCE shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The SONGS CSP was approved by License Amendment No. 225, as supplemented by a change approved by License Amendment XXX.

F. This license is subject to the following additional condition for the protection of the environment:

Before engaging in activities that may result in a significant adverse environmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement, SCE shall provide a written notification of such activities to the NRC Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities.

G. DELETED H. SCE shall notify the Commission, as soon as possible but not later than one hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.

SCE shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

J. Deleted

Amendment No. 231

Unit 3 Facility Operating License Page Report. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.

E. SCE shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21 is entitled: "San Onofre Nuclear Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letter dated May 15, 2006. SCE shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The SONGS CSP was approved by License Amendment No. 218, as supplemented by a change approved by License Amendment X)(X.

F. This license is subject to the following additional condition for the protection of the environment:

Before engaging in activities that may result in a significant adverse environmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement, SCE shall provide a written notification of such activities to the NRC Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities.

G. DELETED H. SCE shall notify the Commission, as soon as possible but not later than one hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.

SCE shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

Amendment No. 224 Rciscd b,, lcttcr datcd Mrcoh 6, 2007