ML15244A401
| ML15244A401 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/06/1988 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8801150114 | |
| Download: ML15244A401 (4) | |
Text
ACCELERATED DI&
BUTION DEMONSTR ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8801150114 DOC.DATE: 88/01/06 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287 AUTH.NAME AUTHOR AFFILIATION BROWNLEE,V.L.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION TUCKER,H.B.
Duke Power Co.
SUBJECT:
Confirms 880222-26 equipment qualification insp.Major areas R
to be inspected listed.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response D
NOTES:AEOD/Ornstein:lcy.
0500026.
AEOD/Ornstein:lcy.
05000270 AEOD/Ornstein:lcy.
05000287/
RECIPIENT COPIES RECIPIENT COPIES A
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1
1 PASTIS,H 2
2 D
INTERNAL: AEOD 1
1 DEDRO 1
1 D
NRR MORISSEAU,D 1
1 NRR/DLPQ/PEB 1
1 NRR/DOEA DIR 1
1 NRR/DREP/EPB 1
1 S
NRR/DREP/RPB 2
2 NRR/DRIS DIR 1
1 NRR/PMAS/ILRB 1
1 EA=L-ERMAN,J 1
1 OGC/HDS2 1
1 iREG FIL 1
1 RES/DRPS DIR 1
RG-N-2 FILE 01 1
1 EXTERNAL: LPDR 1
1 NRC PDR 1
1 NSIC 1
1 NOTES:
1 1
D S
A D
D S
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22
JAN 0 6 198 Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55 Duke Power Company ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
EQUIPMENT QUALIFICATION INSPECTION OF OCONEE NUCLEAR FACILITY This letter confirms the dates of February 22-26, 1988 for the NRC environmen tal qualification (EQ) of electrical equipment inspection for the Oconee facility.
These dates were established during a previous telephone conversa tion with P. Guil on January 4, 1988 by B. Bonser of this office. The inspec tion will take place at the site.
A management entrance meeting is scheduled for 1:00 p.m. on February 22, 1988, with a management exit meeting tentatively scheduled for 10:30 a.m. on February 26, 1988, at the plant site. A plant walkdown inspection of specific EQ equipment is planned for February 24,
- 1988, and will require escorted service by knowledgeable EQ personnel of your organization.
The inspection will include the following:
- 1. Review of your implementation of 10 CFR 50.49 EQ program, including preservation of qualified status of equipment.
- 2. Review of your implementation of Technical Evaluation Report/Safety Evaluation Report EQ corrective action commitments.
- 3. Review of EQ documentation files including all supporting calculations and performance characteristics (including instrument and loop accuracies in which effects of decreases of insulation resistance as a result of hostile environment degradation of equipment such as terminal blocks, cable,
- splices, EPA, transmitters, etc.,
are evaluated (see NUREG/CR-3691);
variation in current; voltage; frequency and other electrical characteris tics that could impact the qualification). Additional details for audit ability of EQ records are specified in IE Notice 85-39.
4..
Physical inspection of equipment from the Master List.
8801150114 880106 PDR ADOCK 05000269
'I 0
.DCD
Duke Power Co.
2 JAN06 198 At least two weeks prior to the inspection, we will require one copy of each document identified in.
the enclosure with a plus (+) mark. A duplicate copy is to be sent to:
Uldis Potapovs, Chief Equipment Qualification Inspection Section EW/S 312A U. S. Nuclear Regulatory Commission Washington, DC 20555 All calculations and files are to be at the plant site for this inspection.
Your cooperation during this inspection will be appreciated. Should you have any questions regarding this inspection, please contact T. E. Conlon on (404) 331-5537.
Sincerely, A J Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects
Enclosure:
References cc w/encl:
M. S. Tuckman, Station Manager bcc w/encl:
NRC Resident Inspector DRS Technical Assistant H. Pastis, NRR State of South Carolina Document Control Desk U. Potapovs, NRR T. Conlon N. Merriweather T. Peebles RHI RIIJ RII ARuff:ls TEConlon ARHerdt 01/
/88 01/V/88 01/b /88
ENCLOSURE REFERENCES
- 1. +Licensee's overall EQ Program.
- 2. +NRC Safety Evaluation Reports (SER) concerning environmental qualification of safety-related. electrical equipment, including the SER that forwarded the Technical Evaluation Report (TER) to each licensee.
- 3. +Licensee's commitments for corrective action including May 1983 SER/TER response, 1984 minutes of meeting with NRC, and subsequent changes.
- 4. +a. Licensee's list of equipment requiring environmental qualification (Master List, submitted in May 1983).
+b. Master List, version in effect at time of inspection.
- 5. +a. Generic Letter 84-24, D. G. Eisenhut to Licensee's and Applications, dated December 17, 1984,
Subject:
Certification of Compliance to 10 CFR 50.49.
- 6. +Licensee's current System Component Evaluation Worksheets (SCEW sheets) for generic items or equivalent.
- 7. +Licensee's procedures applicable to equipment qualification (EQ program, procurement of qualified equipment, maintenance of qualified equipment, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface including corporate QA, Site QA/QC audits, EQ spare parts procurement) and licensee program for EQ related NRC Informa tion Notices/Bulletins.
- 8. *Licensee's qualification documentation and/or files including all calcula tions and analysis (Aging, Performance characteristics, etc.) that support the environmental qualification.
- 9. +SER or statement concerning status of Regulatory Guide 1.97 Electrical Equipment in the EQ area.
- These documents must be available for the inspectors use throughout the inspection.
+These documents are requested for review before the inspection.