Confirms That Conditions of 870410 & 0806 Confirmatory Orders Met & Restrictions Imposed by Order Lifted.Required Approval for Full Power Operation Given to Facility on 871105
ML15244A357
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/05/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8711130279
Download: ML15244A357 (3)


Text

REGUL9RY INFORMATION DISTRIBUT*

SYSTEM (RIDS)

ACCESSION NBR:8711130279 DOC.DATE: 87/11/05 NOTARIZED: NO DOCKET #

FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269 AUTH.NAME AUTHOR AFFILIATION GRACEJ.N.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION TUCKER,H.B.

Duke Power Co.

SUBJECT:

Confirms that conditions of 870410 & 0806 confirmatory orders met & restrictions imposed by order lifted.Required approval for full power operation given to facility on 871105.

DISTRIBUTION CODE: IEO1D COPIES RECEIVED:LTR VENCL -0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:AEOD/Ornstein:1cy.

05000269 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1

PASTISH 2

INTERNAL: AEOD 1

DEDRO 1

NRR MORISSEAU,D 1

NRR/DLPG/PEB 1

NRR/DOEA DIR 1

1 NRR/DREP/EPB 1

NRR/DREP/RPB 2

NRR/DRIS DIR 1

NRR/PMAS/ILRB 1

1 MANJ 1

OGC/HDS2 1

1 FILE 1

RES DEPY GI i

RGN2 FILE 01 1

EXTERNAL: LPDR 1

NRC PDR 1

NSIC 1

NOTES:

1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 2r

NOV 05 1987 Docket No. 50-269 License No. DPR-38 Duke Power Company ATTN:

Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

OCONEE NUCLEAR STATION UNIT 1 - CONFIRMATORY ORDER The Oconee Confirmatory Orders of April 10, 1987, and August 6, 1987 placed restrictions of operation on Oconee Unit 1. The Orders required that Unit 1 shall not operate at any power level after the end of cycle 10 unless the Regional Administrator, Region II, has approved the Low Pressure Injection (LPI) and Reactor Building Cooling Unit (RBCU) coolers for full power operation or the Regional Administrator has relaxed or rescinded any of the conditions of the Order upon showing of good cause by the licensee. My letter of October 29, 1987, relaxed the Order and concurred with your intention to test and evaluate the RBCU and LPI system coolers following cleaning and then have them approved for full power operation prior to exceeding 5% power.

The Unit 1 LPI and RBCU coolers were cleaned and tested.

Test results and analyses were reviewed by Region II inspectors on November 5, 1987, and found to satisfy the requirements of the Order. The required approval for full power operation was given by Region II to the Oconee station manager on November 5, 1987.

We therefore confirm that the conditions of the April 10, 1987 and August 6, 1987 Confirmatory Orders have been met for Unit 1, and therefore, the restrictions imposed by the order on Unit 1 have been lifted.

Sincerely, J. Nelson Grace Regional Administrator cc: M. S. Tuckman, Station Manager bcc:

(See page 2) 8711130279 871105 PDR ADOCK 05000269 P -

PDR

Duke Power Company 2

bcc: NRC Resident Inspector H. Pastis, NRR State of South Carolina Document Control Desk RH RI.

RIT Rik RI RH RH er ebles VBrownlee JH eyes 11/,/87 11/0/87 11/

/87 11/6/87 11

/87 11/5/87 11/5 87