ML15244A248

From kanterella
Jump to navigation Jump to search
Confirms 870416 Telcon on 870513 Enforcement Conference to Discuss Findings Re Unit 3 Startup W/Both Trains of HPI Inoperable & Valves to LPI HXs Closed as Discussed in Insp Repts 50-269/87-16,50-270/87-16 & 50-287/87-16.Agenda Encl
ML15244A248
Person / Time
Site: Oconee  
Issue date: 05/07/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8705190167
Download: ML15244A248 (2)


See also: IR 05000269/1987016

Text

MAY

Docket Nos. 50-269, 50-270, 50-287

License Nos.

DPR-38, DPR-47, DPR-55

Ok e Power Company

/ATTN:

Mr. H. B. Tucker, Vice President

. Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING -

OCONEE

-

DOCKET NOS.

50-269, 50-270

AND 50-287

This confirms the conversation between Mr. N. A. Rutherford of your staff, and

Mr. T. A. Peebles of my staff, on April 16,

1987, concerning an enforcement

conference to be conducted at the Region II Office on May 13,

1987,

at

10:00 a.m. We requested this meeting to discuss our findings relative to the

Unit 3 startup with both trains of high pressure injection inoperable and

valves to the Low Pressure Injection Heat Exchangers closed as discussed in

Inspection Reports 50-269/87-16,

50-270/87-16 and 50-287/87-16.

A proposed

meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased

to discuss them.

Sincerely,

Nelson Grace

J Regional Administrator

Enclosure:

Proposed Meeting Agenda

c w/encl:

S. Tuckman, Station Manager

/ cc w/encl:

IRC Resident Inspector

H. Pastis, NRR

State of South Carolina

Document Control Desk

RII

.RII

RII

R

les:jt

iA

wnlee

yes

t

4/ /87

4-7i/87

/6/87

4q /87

8705190167 870507

PDR ADOCK 05000269

G

PDR

Enclosure

Proposed Meeting Agenda

Duke Power Company (DPC)

May 13, 1987, 10:00 a.m.

I.

Opening Remarks

J. N. Grace

II.

OPC Discussion of

DPC Staff

April 10, 1987 Unit 3 Startup

A. HPI suction valves closed

B. LPI heat exchanger service water valves closed

III.

Closing Remarks

J. N. Grace

C

~

.7j-