Letter Sequence Other |
---|
|
|
MONTHYEARPNP 2015-062, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML15351A3602015-12-16016 December 2015 Attachment 5, Final Integrated Plan Project stage: Other PNP 2015-083, Notification of Full Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2015-12-16016 December 2015 Notification of Full Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Other PNP 2015-084, Notification of Full Compliance with NRC Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2015-12-16016 December 2015 Notification of Full Compliance with NRC Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML16174A1712016-06-21021 June 2016 NRR E-mail Capture - (External_Sender) Palisades Nuclear Plant Assessment of Frazil Ice for Mitigating Strategies Project stage: Request ML16014A3182016-08-22022 August 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2015-08-28
[Table View] |
|
---|
Category:Letter type:PNP
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02
[Table view] Category:Status Report
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) PNP 2015-084, Notification of Full Compliance with NRC Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2015-12-16016 December 2015 Notification of Full Compliance with NRC Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation PNP 2015-062, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) PNP 2015-061, Fifth Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) PNP 2015-005, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) PNP 2015-007, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML14352A2862014-12-18018 December 2014 Entergy Nuclear Operations, Inc. Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 PNP 2014-085, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) PNP 2014-084, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14059A0772014-02-28028 February 2014 Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) PNP 2014-011, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-28028 February 2014 Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) PNP 2013-064, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) PNP 2013-065, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12122A0712012-05-14014 May 2012 Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report2008-05-0808 May 2008 J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report ML0706101422007-03-0909 March 2007 February 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 Cfr), Section 2.206 ML0634502502006-12-19019 December 2006 November 2006 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 L-HU-06-013, Decommissioning Funding Status Report2006-03-22022 March 2006 Decommissioning Funding Status Report L-HU-05-008, Decommissioning Funding Status Reports2005-03-31031 March 2005 Decommissioning Funding Status Reports L-HU-04-040, Nuclear Management Company, LLC, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures2004-09-24024 September 2004 Nuclear Management Company, LLC, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures ML0329009652003-10-16016 October 2003 Decommissioning Funding Status Reports - Supplemental Response for Duane Arnold, Kewaunee, Monticello, Palisades, Point Beach, Units 1 and 2, and Prairie Island, Units 1 and 2 ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2024-09-18
[Table view] |
Text
,.
~ Entergy Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Anthony J. Vitale PNP 2015-062 Site Vice President August28,2015 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Palisades Nuclear Plant Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
Palisades Nuclear Plant Docket No. 50-255 License No. DPR-20
REFERENCES:
- 1. NRC Order Number EA-12-051, Order To Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012 (ADAMS Accession No. ML12054A682)
- 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29,2012 (ADAMS Accession No. ML12221A339)
- 3. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," Revision 1, dated August 2012 (ADAMS Accession No. ML12240A307)
- 4. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2012-092, Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated October 25,2012 (ADAMS Accession No. ML12300A067)
- 5. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-009, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying License With Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28,2013 (ADAMS Accession No. ML13060A360)
- 6. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-065, Palisades Nuclear Plant First Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051),
dated August 28,2013 (ADAMS Accession No. ML13241A235)
PNP 2015-062 Page 2 of 3
- 7. NRC Interim Staff Evaluation, Palisades-Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC No. MF0769), dated November 26,2013 (ADAMS Accession No. ML13312A423)
- 8. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-010, Palisades Nuclear Plant Second Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-0S1), dated February 28,2014 (ADAMS Accession No. ML14059A078)
- 9. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2014-084, Palisades Nuclear Plant Third Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-0S1),
dated August 28,2014 (ADAMS Accession No. ML14240A278)
- 10. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2015-005, Palisades Nuclear Plant Fourth Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-0S1), dated February 27,2015 (ADAMS Accession No. ML15062A056)
Dear Sir or Madam:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Entergy Nuclear Operations, Inc. (ENO). This order was immediately effective and directed ENO to install reliable spent fuel pool level instrumentation at the Palisades Nuclear Plant (PNP).
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C. Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. Reference 2 endorses industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference
- 2. Reference 4 provided the PNP initial status report regarding mitigation strategies.
Reference 5 provided the PNP overall integrated plan. Reference 6 provided the first six-month status report. Reference 7 contains a request for additional information regarding the overall integrated plan for implementation of Order EA-12-051. References 8,9, and 10 provide the second, third, and fourth six-month status reports, respectively.
The purpose of this letter is to provide the fifth six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1. The attached report provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief and the basis, if any.
This letter also provides information in response to the request for additional information in Reference 7.
PNP 2015-062 Page 3 of 3 This letter contains no new commitments and no revised commitments.
I declare under penalty of perjury that the foregoing is true and correct; executed on August 28,2015.
AJVljse
Attachment:
Palisades Nuclear Plant Fifth Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) cc: Office Director, NRR, USNRC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
Attachment Palisades Nuclear Plant Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) 1 Introduction Entergy Nuclear Operations, Inc. (ENO) developed for Palisades Nuclear Plant (PNP) an overall integrated plan (Reference 1 in Section 8), documenting the requirements to install reliable spent fuel pool level instrumentation (SFPI), in response to Reference 2 in Section 8.
This attachment provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
2 Milestone Accomplishments The following milestone(s) have been completed since January 31,2015 and are current as of July 31,2015.
- Fourth Six-Month Status Report - February 2015
- Fifth Six-Month Status Report - Complete with submission of this document in August 2015.
- Response to NRC Interim Staff Evaluation (ISE) Request for Additional Information (received November 26, 2013) - February 2015.
3 Milestone Schedule Status The following provides a line item update to the milestone schedule to support the Overall Integrated Plan. It provides the activity status of each item, and whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed.
Revised Target Target Completion Activity Milestone Completion Datet Status Date Reliable SFPI Installed Fall 2015 Refueling In Progress N/A Outa9_e Response to NRC Request for Additional Information Submitted August 19, 2013 August 19, (received July 18, 2013) N/A (Reference 3) 2013 Page 1 of 4
Response to NRC ISE Submitted Request for Additional March 31, 2015 February 27, Information (received N/A 2015 November 26, 2013)
T' Target Completion Date IS the last submitted date from either the overall mtegrated plan or previous six-month update.
4 Changes to Compliance Method There are no additional changes to the compliance method.
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation ENO expects to comply with the order implementation date and no relief/relaxation is required at this time.
6 Open Items from Overall Integrated Plan and Interim Staff Evaluation ENO has received an Interim Staff Evaluation for PNP that includes 18 Requests for Additional Information (RAls). There were 3 additional RAls received prior to the June 2015 Audit Visit (Reference 0), for a total of 21 RAls. The following table provides the status of these RAls.
RAI # Response Status This item was closed during the 1
June 2015 NRC Audit Visit.
This item was closed during the 2
June 2015 NRC Audit Visit.
This item was closed during the 3
June 2015 NRC Audit Visit.
This item was closed during the 4
June 2015 NRC Audit Visit.
This item was closed during the 5
June 2015 NRC Audit Visit.
This item was closed during the 6
June 2015 NRC Audit Visit.
This item was closed during the 7
June 2015 NRC Audit Visit.
This item was closed during the 8 June 2015 NRC Audit Visit.
This item was closed during the 9
June 2015 NRC Audit Visit.
This item was closed during the 10 June 2015 NRC Audit Visit.
This item was closed during the 11 June 2015 NRC Audit Visit.
This item was closed during the 12 June 2015 NRC Audit Visit.
Page 2 of 4
This item was closed during the 13 June 2015 NRC Audit Visit.
This item was closed during the 14 June 2015 NRC Audit Visit.
This item was closed during the 15 June 2015 NRC Audit Visit.
This item was closed during the 16 June 2015 NRC Audit Visit.
This item was closed during the 17 June 2015 NRC Audit Visit.
This item was closed during the 18 June 2015 NRC Audit Visit.
This item was closed during the 19 (New)
June 2015 NRC Audit Visit.
This item was closed during the 20 (New)
June 2015 NRC Audit Visit.
21 (New) See Section 9 7 Potential Interim Staff Evaluation Impacts There are no potential impacts to the ISE identified at this time.
8 References The following references support the updates to the overall integrated plan described in this attachment.
- 1. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-009, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying License With Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2013 (ADAMS Accession No. ML13060A360)
- 2. NRC Order Number EA-12-051, Order To Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation, dated March 12,2012 (ADAMS Accession No. ML12054A682)
- 3. NRC email to Entergy Nuclear Operations, Inc., Palisades Nuclear Plant- Requests for Additional Information Regarding OveraJllntegrated Plan for Reliable Spent Fuel Pool Instrumentation (TAC MF0769), dated July 18, 2013 (ADAMS Accession No. ML13200A328)
- 4. NRC letter to Entergy Nuclear Operations, Inc., Palisades -Interim Staff Evaluation and Request for Additional Information Regarding the OveraJllntegrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC NO. MF0769), dated November 26, 2013 (ADAMS Accession No. ML13312A423)
- 5. Summary of the November 26,2013, Public Meeting to Discuss Industry Responses to Staff Interim Evaluations for Spent Fuel Pool Instrumentation, dated December 26, 2013 (ADAMS Accession No. ML133478030).
- 6. NRC letter to Entergy Nuclear Operations, Inc., Palisades Nuclear Plant - Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Page 3 of 4
Instrumentation Related To Orders EA-12-049 and EA-12-051 (TAG Numbers MF0768 and MF0769), dated April 22, 2015 (ADAMS Accession No. ML15110A051) 9 Responses to Open Requests for Additional Information RAI#21 Please describe the impact of recent MOHR's SFPI equipment failures (failure of the filter coil (or choke) in particular) on the Palisades' SFP level instrument. Also, any actions/measures Waterford [sic] plans to implement to address this equipment failure.
Note: RAI #21 was issued prior to the NRC June 2015 Audit Visit (Reference O) and is still open. This is a generic issue for all plants with MOHR instrumentation. The NRC has requested additional information from MOHR concerning qualification of the proposed circuitry changes. A response was provided during the audit and has been updated below to reflect the current status.
ENO Response:
The vendor MOHR determined that the source of the failures is a miniature surface mount common-mode choke component used on the Video and Digicomp printed circuit boards within the EFP-IL Signal Processor. Per MOHR's recommendation, the two boards have been replaced in both EFP-IL Signal Processors at Palisades. Corrective actions were performed under condition report CR-HQN-2015-0345 to replace each of the two circuit boards within the two EFP-IL Signal Processors at the site. They are Corrective Action 10 for U-2141 (Spent Fuel Pool Level Indication) and Corrective Action 11 for U-2142 (Spent Fuel Pool Level Indication). The new boards have equivalent substitute components that are less susceptible to transient electrical events. The substitute components have equivalent size, mass, and solder attachment technique as the original component such that there is no impact to the system mechanical characteristics. The components demonstrate equivalent electrical performance such that EMC characteristics are not significantly changed.
MOHR has provided Palisades with a copy of their Root Cause Analysis Report, Revision 1, dated 6/1/2015.
In the event one or both channels become non-functioning at any pOint in the future, compensatory actions will be applied under the plant's Operating Requirements Manual.
Page 4 of 4