ML15239A067

From kanterella
Jump to navigation Jump to search
Forwards Initial SALP Repts 50-269/93-11,50-270/93-11 & 50-287/93-11 for Period 920202-930501.Performance Maintained at Superior Level in Areas of Radiological Protection & Security
ML15239A067
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/13/1993
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hampton J
DUKE POWER CO.
Shared Package
ML15239A068 List:
References
NUDOCS 9308050083
Download: ML15239A067 (9)


See also: IR 05000269/1993011

Text

FORD1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9308050083

DOC.DATE: 93/07/13

NOTARIZED: NO

DOCKET #

FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269

50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270

50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287

AUTH.NAME

AUTHOR AFFILIATION

EBNETER,S.D.

Region 2 (Post 820201)

RECIP.NAME

RECIPIENT AFFILIATION

R

HAMPTON,J.W.

Duke Power Co.

I

SUBJECT: Forwards initial SALP repts 50-269/93-11,50-270/93-11 &

50-287/93-11 for period 920202-930501.Performance maintained

D

at superior level in areas of radiological protection &

security.

S

DISTRIBUTION CODE: IE40D COPIES RECEIVED:LTR

ENCL

SIZE:

TITLE: Systematic Assessment of Licensee Performance (SALP) Report

NOTES:

0

RECIPIENT

COPIES

RECIPIENT

COPIES

R

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-3 LA

1

1

PD2-3 PD

1

1

WIENS,L

1

1

INTERNAL: ACRS

2

2

AEOD/DOA

1

1

AEOD/DSP/TPAB

1

1

COMMISSION

5

5

DEDRO

1

1

NRR/DORS/OEAB

1

1

NRR/DRCH/HHFBPT

1

1

NRR/DRCH/HOLB

1

1

NRR/DRIL/RPEB

1

1

NRR/DRIL/RSIB

1

1

NRR/DRSS/PEPB

1

1

NRR/DRSS/PRPB

1

1

NRR/DRSS/RSGB

1

1

NRR/PMAS/ILRB

1

1

0

NUDOCS-ABSTRACT

1

1

OE DIR

1

1

OGC/HDS2

1

1

-R-EGF ILE,

02

1

1

RGN2

FILE

01

1

1

EXTERNAL: EG&G/BRYCE,J.H.

1

1

L ST LOBBY WARD

1

1

NRC PDR

1

1

NSIC

1

1

E

T

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATE YOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

31

ENCL

31

JUL 131993

Docket Nos. 50-269, 50-270 and

50-287

License Nos. DPR-38, DPR-47 and

DPR-55

Duke Power Company

ATTN: Mr. J. W. Hampton

Vice President

Oconee Site

P. 0. Box 1439

Seneca, SC 29679

Gentlemen:

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

(NRC INSPECTION REPORT NOS. 50-269/93-11, 50-270/93-11 AND

50-287/93-11)

The NRC Systematic Assessment of Licensee Performance (SALP) has been

completed for your Oconee facility. The facility was evaluated for the period

February 2, 1992, through May 1, 1993. The results of the evaluation are

documented in the enclosed Initial SALP Report. This report will be discussed

with you at a public meeting to be held at the Oconee facility on July 28,

1993, at 10:00 a.m.

The performance of your Oconee facility was evaluated in the functional areas

of Plant Operations, Radiological Controls, Maintenance/Surveillance,

Emergency Preparedness, Security, Engineering/Technical Support, and Safety

Assessment/Quality Verification.

Overall performance for Oconee continued with the same category ratings as the

last assessment period. Performance was maintained at a superior level in the

functional areas of Radiological Protection, Security and Emergency

Preparedness. Performance in the remaining functional areas was good.

Although management attention resulted in improvement in command and control

over operational evolutions, particularly shutdown operations, the weaknesses

noted in the previous SALP period associated with procedural adherence

continued. Failure by the staff to follow procedural requirements was

compounded in some cases by the inadequacy of the procedures. Further,

inadequate control of maintenance and surveillance activities resulted in

several preventable operational transients. I look forward to discussing this

assessment with you on July 28, 1993.

Any comments you have concerning our evaluation of performance of your Oconee

facility should be submitted to this office within 30 days following the date

of our meeting. Your comments will be considered in the development of the

9308050083 930713

PDR

ADOCK 05000269

G

PDR

JUL 13 1993

Duke Power Company

2

Final SALP Report and will be issued, along with a summary of our meeting, as

an appendix to the Final SALP Report.

Should you have any questions concerning this letter,-we will be glad to

discuss them with you.

Sincerely,

Stewart D. Ebneter

Regional Administrator

Enclosure:

Initial SALP Report

cc w/encl:

M. E. Patrick

Compliance

Duke Power Company

P. 0. Box 1439

Seneca, SC 29679

A. V. Carr, Esq.

Duke Power Company

422 South Church Street

Charlotte, NC 28242-0001

County Supervisor of

Oconee County

Walhalla, SC 29621

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

1700 Rockville Pike, Suite 525

Rockville, MD 20852

J. Michael McGarry, III, Esq.

Winston and Strawn

1400 L Street, NW

Washington, D. C. 20005

Office of Intergovernmental Relations

116 West Jones Street

Raleigh, NC 27603

cc:

Continued see page 3

JUL 131993

Duke Power Company

3

cc:

Continued

Heyward G. Shealy, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL 34619-1035

G. A. Copp

Licensing - EC050

Duke Power Company

P. 0. Box 1006

Charlotte, NC 28201-1006

Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. 0. Box 629

Raleigh, NC 27602

INPO

JUL 13 1993

Duke Power Company

4

bcc w/encl:

The Chairman

K. C. Rogers, Commissioner

F. J. Remick, Commissioner

E. G. de Planque, Commissioner

J. M. Taylor, EDO

H. L. Thompson, Jr., EDO

L. R. Plisco, Regional

Coordinator, EDO

T. E. Murley, NRR

S. Varga, NRR

D. B. Matthews, NRR

L. A. Wiens, NRR

F. Allenspach, SALP Coordinator, NRR

Regional Administrators, RI, RIII

RIV, and RV

K. Clark, RH, PA0

A. R. Herdt, DRP, RH

M. S. Lesser, DRP, RH

W. H. Miller, DRP, RH

S. Vias, Chief, TSS (2 copies)

NRC Resident Inspector

DRS and DRSS Branch Chiefs,

and Section Chiefs

Document Control Desk

  • FOR PREVIOUS CONCURRENCE SEE ATTACHED

RH

RH

RH

RH

RH

  • WMiller
  • MLesser
  • AHerdt
  • PSthor
  • JJaudon

07/ /93

07/ /93

07/ /93

07/ /93

07/ /93

RH

NRR

NRR

R

RI

  • PHarmon

LWiens

DMatthews

jo

son

ey

07/ /93

07/ /93

07/ /93

7/5/

934

071 /93

Duke Power Company

3

cc w/encl:

T e Chairman

K. C. Rogers, Commissioner

J. . Curtiss, Commissioner

F. J. Remick, Commissioner

E. G. e Planque, Commissioner

J. M. aylor, EDO

H. L. T ompson, Jr., EDO

J. F. We hselberger, Regional

Coordin tor, EDO

T. E. Mur1 y, NRR

S. Varga,

R

D. B. Matthe s, NRR

L. A. Wiens, RR

F. Allenspach, SALP Coordinator, NRR

Regional Administrators, RI, RIII

RIV, and RV

K. Clark, RH,

0

A. R. Herdt, DRP, RH

M. S. Lesser, DRP RH

W. H. Miller, DRP, RH

S. Vias, Chief, TS

(2 copies)

NRC Resident Inspec or

DRS and DRSS Branch hiefs,

and Section Chiefs

Document Control Desk

RH

RH

RII

RI

I

Wiqler

Messer

AHerdt

PS or

JJ

on

07/J'/93

07/

/93

07/j /93

07/ '/93

07 *93

RII

NRR

NRR

RII

RH

Wi Harmon

L~iens

DMatthews

JJohnson

LReyes

07/S/93

07/7/93

07/7/93

07/ /93

07/ /93

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET. N.W., SUITE 2900

ATLANTA, GEORGIA 30323-0199

JUL 1 21993

Docket Nos. 50-269, 50-270 and

50-287

License Nos. DPR-38, DPR-47 and

DPR-55

Duke Power Company

ATTN: Mr. J. W. Hampton

Vice President

Oconee Site

P. 0. Box 1439

Seneca, SC 29679

Gentlemen:

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

(NRC INSPECTION REPORT NOS. 50-269/93-11, 50-270/93-11 AND

50-287/93-11)

The NRC Systematic Assessment of Licensee Performance (SALP) has been

completed for your Oconee facility. The facility was evaluated for the period

February 2, 1992, through May 1, 1993. The results of the evaluation are

documented in the enclosed Initial SALP Report. This report will be discussed

with you at a public meeting to be held at the Oconee facility on July 28,

1993, at 10:00 a.m.

The performance of your Oconee facility was evaluated in the functional areas

of Plant Operations, Radiological Controls, Maintenance/Surveillance,

Emergency Preparedness, Security, Engineering/Technical Support, and Safety

Assessment/Quality Verification.

Overall performance for Oconee continued with the same category ratings as the

last assessment period. Performance was maintained at a superior level in the

functional areas of Radiological Protection, Security and Emergency

Preparedness. Performance in the remaining functional areas was good.

Although management attention resulted in improvement in command and control

over operational evolutions, particularly shutdown operations, the weaknesses

noted in the previous SALP period associated with procedural adherence

continued. Failure by the staff to follow procedural requirements was

compounded in some cases by the inadequacy of the procedures. Further,

inadequate control of maintenance and surveillance activities resulted in

several preventable operational transients. I look forward to discussing this

assessment with you on July 28, 1993.

Any comments you have concerning our evaluation of performance of your Oconee

facility should be submitted to this office within 30 days following the date

of our meeting. Your comments will be considered in the development of the

JUL 13 1993

Duke Power Company

2

Final SALP Report and will be issued, along with a summary of our meeting, as

an appendix to the Final SALP Report.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

Stewart D. Ebneter

Regional Administrator

Enclosure:

Initial SALP Report

cc w/encl:

M. E. Patrick

Compliance

Duke Power Company

P. 0. Box 1439

Seneca, SC 29679

A. V. Carr, Esq.

Duke Power Company

422 South Church Street

Charlotte, NC 28242-0001

County Supervisor of

Oconee County

Walhalla, SC

29621

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

1700 Rockville Pike, Suite 525

Rockville, MD 20852

J. Michael McGarry, III, Esq.

Winston and Strawn

1400 L Street, NW

Washington, D. C. 20005

Office of Intergovernmental Relations

116 West Jones Street

Raleigh, NC 27603

cc:

Continued see page 3

JUL 13 1993

Duke Power Company

3

cc:

Continued

Heyward G. Shealy, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL 34619-1035

G. A. Copp

Licensing - ECO50

Duke Power Company

P. 0. Box 1006

Charlotte, NC 28201-1006

Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. 0. Box 629

Raleigh, NC 27602

INPO