Forwards SALP Repts 50-269/92-01,50-270/92-01 & 50-287/92-01 on 900801-920201.Overall Performance Acceptable
ML15239A057
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/06/1992
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hampton J
DUKE POWER CO.
Shared Package
ML15239A058 List:
References
NUDOCS 9205050105
Download: ML15239A057 (4)


See also: IR 05000269/1992001

Text

APRO061Y

Docket Nos. 50-269, 50-270, 50-287

License Nos. DPR-38, DPR-47, DPR-55

Duke Power Company

ATTN: Mr. J. W. Hampton

Vice President

Oconee Site

P. 0. Box 1439

Seneca, SC 29679

Gentlemen:

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

(NRC INSPECTION REPORT NOS. 50-269/92-01, 50-270/92-01 AND

50-287/92-01)

The NRC Systematic Assessment of Licensee Performance (SALP) has been completed

for your Oconee facility.

The facility performance was evaluated for the

period August 1, 1990,

through February 1, 1992, in the functional areas of

.

Plant Operations, Radiological Controls, Maintenance/Surveillance,

Emergency

Preparedness,

Security, Engineering/Technical Support,

and Safety Assess

ment/Quality Verification. The results of the evaluation are documented in the

enclosed Initial SALP Report which will be discussed with you at a public

meeting to be held at the Oconee facility on April 15, 1992, at 10:00 a.m.

Overall, the performance of Oconee continued to be satisfactory, but varied

in the degree of performance among the functional areas.

The assessment

indicates continued superior performance in the areas of Radiological Controls

and Emergency Preparedness and improved performance in the area of Security.

With regard to operational safety, certain aspects of performance this period

were uncharacteristic of past performance and this has resulted in declining

performance ratings in Operations and Engineering/Technical Support.

The

period was characterized by the emergence,

and recurrence, of many shutdown

issues related to inadequate control room operation and ineffective oversight.

Contributing to these emergent concerns were the long-standing issues of lack

of attention to detail in equipment configuration control and a laxness in

adherence with procedures. It is recognized that management attention has been

directed to these problem areas and although some short-term results have

been achieved, the full impact of corrective actions has not been demonstrated.

Safety Assessment/Quality Verification performance apparently has reached a

performance plateau and has not been fully effective in preventing recurrence

of events such as those encountered during outages or in resolving the long

.

term issues which contribute to performance on a generic basis.

The assessment recommends management attention to the problem areas and

evaluation of the effectiveness of licensee corrective actions.

9205050105 920406

PDR ADOCK 05000269

G

PDR

Duke--Power-Company

2

APR 06

-

Any comments you have concerning our evaluation of the performance of your

Oconee facility should be submitted to this office within 30 days following the

date of our meeting.

These comments will be considered in the development of

the Final SALP Report.

Your comments and a summary of our meeting will be

issued as an appendix to the Final SALP Report.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

Stewart 0. Ebneter

Regional Administrator

Enclosure:

Initial SALP Report -

Oconee

cc w/encl:

A.

V.

Carr, Esq

Duke Power Company

422 South Church Street

Charlotte, NC 28242-0001

County Supervisor of Oconee County

Walhalla, SC

29621

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

Suite 525, 1700 Rockville Pike

Rockville, MD 20852

J. Michael McGarry, III, Esq.

Winston and Strawn

1400 L Street, NW

Washington, D. C. 20005

Office of Intergovernmental Relations

116 West Jones Street

Raleigh, NC 27603

Heyward G. Shealy, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

(cc w/encl cont'd -

see page 3)

Duke-Power-Company

3

APR 06 1992

cc w/encl:

(Continued)

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL

34619-1035

R. L. Gill

Nuclear Production Department

Duke Power Company

P. 0. Box 1007

Charlotte, NC 28201-1007

Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. 0. Box 629

Raleigh, NC

27602

M. E. Patrick

Compliance

Duke Power Company

P. 0. Box 1439

Seneca, SC 29679

bcc w/encl:

The Chairman

K. C. Rogers, Commissioner

J. R. Curtiss, Commissioner

F. J. Remick, Commissioner

E. G. de Planque, Commissioner

J. M. Taylor, EDO

H. L. Thompson, Jr., EDO

J. F. Wechselberger, Regional

Coordinator, EDO

T. E. Murley, NRR

S. Varga, NRR

L. Wiens, NRR

D. Matthews, NRR

F. Allenspach, SALP Coordinator, NRR

Regional Administrators, RI, RIII

RIV, and RV

K. Clark, RII,

PAO

A. Herdt, DRP, RII

A. Belisle, DRP, RH

W. Miller, DRP, RII

L. Watson, Chief, TSS

NRC Resident Inspector

DRS and DRSS Branch Chiefs,

and Section Chiefs

Document Control Desk

bcc w/encl:

(cont'd see page 4)

Duke Power Company

4

bcc w/encl:

(Continued)

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 610

Seneca, SC 29678

RII:D P RII:DRP

RII RP

RP

RIIDRSS

rI: A

P#.

    • wh.o3

pd nawarf

£n fwa

WMV r

ABe sle

AHerdt

MiS

JSAar

-

n

J

oan

3/io/92

3//92

3/3v/92

-43---/92

3/ / 92 4/3/92

3

9 ~L1141114-