ML15239A010

From kanterella
Jump to navigation Jump to search
Forwards SALP Board Repts 50-269/87-33,50-270/87-33, 50-287/87-33,50-369/87-29,50-370/87-29,50-413/87-26 & 50-414/87-26.Oconee & McGuire Evaluated for Mar 1986 - Jul 1987.Catawba Evaluated for Oct 1985 - Jul 1987
ML15239A010
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 10/20/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML15239A011 List:
References
NUDOCS 8711130138
Download: ML15239A010 (3)


See also: IR 05000269/1987033

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8711130138

DOC.DATE: 87/10/20 NOTARIZED: NO

DOCKET #

FACIL:50-000 Generic Docket

05000000

50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269

50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270

50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287

50-369 William B. McGuire Nuclear Station, Unit 1, Duke Powe 05000369

50-370 William B. McGuire Nuclear Station, Unit 2, Duke Powe 05000370

50-413 Catawba Nuclear Station, Unit 1, Duke Power Co.

05000413

AUTH.NAME

AUTHOR AFFILIATION

GRACE,J.N.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

TUCKER,H.B.

Duke Power Co.

SUBJECT: Forwards SALP Board Repts 50-269/87-33,50-270/87-33,

50-287/87-33,50-369/87-29,50-413/87-26 & 50-414/87-26.Oconee

& McGuire evaluated for 860301-840431.Catawba evaluated for

851001-870731.Mgt leadership & active participation noted.

DISTRIBUTION CODE: IE40D COPIES RECEIVED:LTR _

ENCL 1_ SIZE: '21

TITLE: Systematic Assessment of Licensee Performance (SALP) Report

NOTES:AEOD/Ornstein:1cy.

05000269

AEOD/Ornstein:1cy.

05000270

AEOD/Ornstein:1cy.

05000287

LPDR 2cys AMDTS to FSAR. ASLB icy.

05000413

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

P.D2-3 LA

1.

0.

PD2-3 PD

1

1

PASTIS,H

1

1

HOOD,D

.1

1

JABBOUR,K

1

1

INTERNAL: ACRS

2

2

AEOD BAILEY,B

1

0

AEOD/DOA

1

1

AEOD/DSP/TPAB

1

1

COMMISSION

5

5

DEDRO

1

1

NRR MORISSEAU,D

1

1

NRR/DEST/SIB

1

1

NRR/DLPG/HFB

1

1

NRR/DLPG/PEB

1

1

NRR/DOEA/EAB

1

1

NRR/DREP/EPB

1

1

NRR/DREP/RPB

1

1

NRR/DRIS DIR

1

1

NRR/PMAS/ILRB

1

1

OE

EB1 1ANJ

1

1

OGC/HDS2

1

1

LE

02

1

1

RGN2

FILE

01

1

1

EXTERNAL: H ST LOBBY WARD

1

1

LPDR

3

3

NRC PDR

1

1

NSIC

1

1

NOTES:

4

4

TOTAL NUMBER OF COPIES REQUIRED: LTTR

39 ENCL

37

OCT 2 0 1987

Docket Nos. 50-269, 50-270, 50-287,

50-369, 50-370, 50-413,

50-414

License Nos. DPR-38, DPR-47, DPR-55,

NPF-9, NPF-17, NPF-35,

NPF-52

Duke Power Company

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

REPORT NOS. 50-269/87-33, 50-270/87-33, 50-287/87-33, 50-369/87-29,

50-370/87-29, 50-413/87-26, 50-414/87-26

The

NRC Systematic Assessment of Licensee Performance

(SALP)

Board has

completed its periodic evaluation of your Oconee,

McGuire and Catawba

facilities.

Oconee and McGuire were evaluated for the period of March 1, 1986

through July 31, 1987.

Catawba was evaluated for the period October 1, 1985

through July 31, 1987.

The results of the evaluation are documented in the

enclosed SALP Board Reports.

These reports will be discussed with you at

Oconee on October 27, 1987, and at McGuire and Catawba on October 29, 1987.

The performance of your Oconee, McGuire and Catawba facilities was evaluated in

the functional areas of plant operations, radiological controls, maintenance,

surveillance, fire protection,

emergency preparedness,

security, outages,

quality programs

and administrative controls affecting quality, licensing

activities, training, and engineering support. Catawba was also evaluated in

the area of preoperational and startup testing.

The engineering support category is a new functional area that has been added

to the SALP.

This new category explores events and problems relative to plant

design, modification implementation, testing and evaluation of problems that

occurred during the evaluation period.

Strong management leadership and active participation were evident at all three

of your facilities and the conduct of activities showed a proper concern for

nuclear safety. In the area of engineering support, as noted in all three

reports, there has been a lack of timely communication and coordination between

the site and corporate engineering staff. We do acknowledge, however, that you

have recognized this weakness and have initiated corrective actions.

Any comments you have concerning our evaluation of the performance of your

facilities should be submitted to this office within 30 days following the date

of our meeting at your McGuire and Catawba facilities on October 29, 1987.

Your comments,

a summary of our plant specific meetings, and my disposition of

your comments will be issued as appendices to the enclosed SALP board reports.

8711130138 871020

PDR ADOCK 05000269

PDR .:TE

Duke Power Company

4

OCT 2 0 :987

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosures:

1.

SALP Board Report -

Oconee

2.

SALP Board Report -

McGuire

3.

SALP Board Report -

Catawba

cc w/encls:

M. S. Tuckman, Station Manager

T. L. McConnell, Station Manager

J. W. Hampton, Station Manager

bcc w/encls:

NRC Resident Inspector

H. Pastis, NRR

K. Jabbour, NRR

D. Hood, NRR

State of South Carolina

Document Control Desk

RII

RII

RII

RH

RII(

/RII

W

4

onser

TPeeles

VBrownlee

LReyes

AGibson

PStohr

101A9/87

/0/,s'/87

10/

/87

10/

/87

10/XD/87

1O/ZLO/87

RI

-RII

10k/87