ML15238B371

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re Util 790410,13,21 & 0505 & 21 Responses to IE Bulletins79-05A & 79-05B.Response to IE Bulletin 79-05C,re Reactor Coolant Pump Operation After Loca,Will Be Reviewed as Part of Task Action Plan II.K.3.5
ML15238B371
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/01/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To: Parker W
DUKE POWER CO.
Shared Package
ML15238B373 List:
References
TASK-2.K.3.05, TASK-TM IEB-79-05A, IEB-79-05B, IEB-79-05C, IEB-79-5A, IEB-79-5B, IEB-79-5C, NUDOCS 8106110170
Download: ML15238B371 (3)


Text

JUNE On*9 D I B

L PDR JStolz (j~~

ti1 NSIC OELD NRC PDR-3 DEisenhut AEOD TERA-2 +1 MFairtile/PWagner IE-3 ACRSoi-1 0 Dockets Nos. 50-269, 50-270 Gray File 10 and 50-287 RIngram ile HOrnstein 0

1 EBlackwood

4.

l p 1 RDiggs co,4 Mr. William 0. Parker, Jr.

CMiles Vice President - Steam Production ASLAB Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Parker:

We have completed a review of the information you have provided in letters dated April 10, 13 and 21, May 5 and 21, 1979 in response to IE Bulletins79-05A, and 79-05B for the Oconee Nuclear Station.

The enclosed Safety Evaluation addresses the completeness and acceptability of the responses.

Your responses to IE Bulletin 79-05C, regarding the operation of the reactor coolant pumps following a loss-of-coolant accident will be reviewed separately as part of Task Action Plan Item II.K.3.5.

Sincerely, "ORIGINAL SIGNED BY 7

3OJN 7. S.TOLTZ John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Safety Evaluation cc w/enclosure:

See next page 81061101~

ORB#4:DL OR~.0 B#4DL C-D PWagner/cab MFairtile JSt DATE *

  • 6 NRCFORM318(10-80) NRCMO240 OFFICIAL RECORD COPY USGO: 1981-33-90

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 1, 1981 Dockets Nos. 50-269, 50-270 and 50-287 Mr. William 0. Parker, Jr.

Vice President - Steam Production Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Parker:

We have completed a review of the information you have provided in letters dated April 10, 13 and 21, May 5 and 21, 1979 in response to IE Bulletins79-05A, and 79-05B for the Oconee Nuclear Station.

The enclosed Safety Evaluation addresses the completeness and acceptability of the responses.

Your responses to IE Bulletin 79-05C, regarding the operation of the reactor coolant pumps following a loss-of-coolant accident will be reviewed separately as part of Task Action Plan Item II.K.3.5.

Sincerely, T J n F. Stolz, Chiefj erating Reactors Branch #4 ivision of Licensing

Enclosure:

Safety Evaluation cc w/enclosure:

See next page

Duke Power Company cc w/enclosure(s):

Mr. William L. Porter Duke Power Company P. 0. Box 33189 422 South Church Street Office of Intergovernmental Relations Charlotte, North Carolina 28242 116 West Jones Street Raleigh, North Carolina 27603 Oconee County Library 501 West Southbroad Street Walhalla, South Carolina 29691 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621 U. S. Environmental Protection Agency Region IV Office ATTN:

EIS COORDINATOR 345 Courtland Street, N.E.

Atlanta, Georgia 30308 Mr. Francis Jape U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Manager, LIS NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515

.J.

Michael McGarry, III, Esq.

DeBevoise & Liberman 1200 17th Street, N.W.

Washington, 0. C. 20036