ML15238A317
| ML15238A317 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/07/1996 |
| From: | Wert L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hampton J DUKE POWER CO. |
| References | |
| NUDOCS 9611150342 | |
| Download: ML15238A317 (6) | |
Text
November 7, 1996 Duke Power Company ATTN: Mr. J. W. Hampton Vice President Oconee Site P. 0. Box 1439 Seneca, SC 29679
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - OCONEE
Dear Mr. Hampton:
On October 15, 1996. the NRC staff completed the semiannual Plant Performance Review (PPR) of the Oconee Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Oconee involved the participation of all regional technical divisions and NRR in evaluating inspection results and safety performance information for the period from March 1996 to September 1996. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and senior management meeting reviews.
This letter advises you of our planned inspection effort resulting from the Oconee PPR review. It is provided in an attempt to minimize the resource impact on your staff and to allow for scheduling conflicts to be resolved in advance of inspection dates. The enclosure presents our inspection plan for the next six months. Specific dates are included for near-term inspections.
Long-term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature, nor are Region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.
During each NRC inspection planned during this period, specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Report (UFSAR) commitments. Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.
9611150342 961107 PDR ADOCK 05000269 G
2 We will inform you of any changes to the inspection plan. If you have any questions, please contact L.Wert at (404) 331-5506.
Sincerely, Original signed by:
L. D. Wert, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38. DPR-47, DPR-55
Enclosure:
Inspection Plan cc w/encl:
Mr. J. E. Burchfield Compliance Duke Power Company P. 0. Box 1439 Seneca, SC 29679 Mr. Paul R. Newton Legal Department (PBO5E)
Duke Power Company 422 South Church Street Charlotte, NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Mr. Robert B. Borsum Framatome Technologies 1700 Rockville Pike. Suite 525 Rockville, MD 20852 Mr. J. Michael McGarry, III, Esq.
Winston and Strawn 1400 L Street. NW Washington, D. C. 20005 Dayne H. Brown. Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 cc w/encl cont'd:
(See page 3)
DPC 3
cc w/encl cont'd:
Mr. Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 County Supervisor of Oconee County Walhalla, SC 29621 Manager. LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 Mr. G. A. Copp Licensing - EC050 Duke Power Company P. 0. Box 1006 Charlotte, NC 28201-1006 Ms. Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 Distribution w/encl:
D. LaBarge. NRR R. Carroll, RII L. D. Wert, RII N. Economos. RII R. Baldwin, RII G. Hallstrom. RH PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 78128 Rochester Highway Seneca, SC 29672 OFFICE RI R R -RS RI IDRS RI -DRS RI DRS SIGNATURE NAME SRudisail TPPebles CCaso KB HCistensen PFredrickson DATE
,404A
/96 10 /
96 10 /) /96 10 /1
/96 10 _
/ 96
" 1/ 96 COPY?
\\YESI NO NO Y
NO ES NO NO YES NO UH-ICIAL RECURU CUP U UCUMENI NAME:
G:\\UUUPPR1L9b
1 of 3 OCONEE INSPECTION PLAN INSPECTION PROCEDURE/
NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE/[PROGRAM AREA]
INSPECTORS DATES TYPE OF INSPECTION COMMENTS IP 71714 COLD WEATHER PREPARATIONS 1
10/6/96-11/17/96 Regional Initiative -
Issues
[OPERATIONS -
DRP 2210]
from McGuire INITIAL OPERATOR LICENSE 3
4/14-18/97(preps)
Operator license exams EXAMINATIONS 4/28/97-5/2/97
[OPERATIONS -
OLHP 2330]
IP 62700 MAINTENANCE IMPLEMENTATION 10/7-11/96 Regional Initiative - Water
[MAINTENANCE - MNT 2310]
1 11/12-15/96 hammer related inspection and 11/18-22/96 modification activities IP 73753 INSERVICE INSPECTION 1
10/15-17/96 Core - Units 1 and 3
[MAINTENANCE -
MNT 2310]
4/14-18/97 IP 40500 EFFECTIVENESS OF PROBLEM 1
3/10-14/97 Regional Initiative IDENTIFICATION, RESOLUTION Equipment/motor failure AND PREVENTION trending and root cause
[MAINTENANCE -
MNT 2310]
IP 62706 MAINTENANCE RULE 5
6/16-20/97 Regional Initiative - Team
[MAINTENANCE - MNT 23101 Inspection IP 37550 ENGINEERING 1
11/12-22/96 Regional Initiative - Water
[ENGINEERING - ENG 2320]
hammer related inspection and modification activities IP 37550 ENGINEERING 3
11/12-22/96 Regional Initiative - Unit 3
[ENGINEERING - ENG 23201 ICS modification ENCLOSURE
(TABLE.OCO cont'd) 2 of 3 INSPECTION PROCEDURE/
NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE/[PROGRAM AREA]
INSPECTORS DATES TYPE OF INSPECTION - COMMENTS IP 71001 LICENSED OPERATOR TRAINING 1
11/5-8/96 Regional Initiative - Unit 3
[OPERATIONS - OLHP 2330]
ICS modification (operator training)
IP 37550 ENGINEERING 2
11/18-22/96 Regional Initiative - Unit 3
[ENGINEERING - ENG 2320]
12/2-6/96 feedwater isolation, CCW/SW, and OAC modifications IP 38701 PROCUREMENT PROGRAM 1
3/3/97-3/14/97 Regional Initiative
[ENGINEERING - ENG 2320]
Material Upgrade Program (from previous PPR)
IP 92903 FOLLOWUP - ENGINEERING 1
3/3-14/97 Regional Initiative
[ENGINEERING -
ENG 2320]
Followup on previous issues IP 37001 10 CFR 50.59 SAFETY 1
3/24/97-4/4/97 Regional Initiative - (Recent EVALUATION PROGRAM site issues)
[ENGINEERING -
ENG 2320]
IP 37550 ENGINEERING 2
3/24/97-4/4/97 Regional Initiative - Unit 1
[ENGINEERING - ENG 2320]
outage modifications (ICS and CCW/SW)
IP 37550 ENGINEERING TBD Regional Initiative
[ENGINEERING - ENG 2320]
NRC/AEOD emergency electrical system report followup IP 83750 OCCUPATIONAL EXPOSURE 1
11/18-22/96 Core
[PLANT SUPPORT -
PS 2340]
ENCLOSURE
(TABLE.OCO cont'd) 3 of 3 INSPECTION PROCEDURE/
NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE/[PROGRAM AREA]
INSPECTORS DATES TYPE OF INSPECTION - COMMENTS IP 84750 RADIOACTIVE WASTE SYSTEMS, 1
10/28/96-11/1/96 Core - (IP 84750 & 86750 to WATER CHEMISTRY, 3/10-14/97 be performed by same CONFIRMATORY MEASUREMENTS, inspector)
AND ENVIRONMENTAL MONITORING
[PLANT SUPPORT - PS 2340]
IP 86750 SOLID RADIOACTIVE WASTE 1
10/28/96-11/1/96 Core - (IP 84750 & 86750 to (TI 2515/133)
MANAGEMENT AND 3/10-14/97 be performed by same TRANSPORTATION OF inspector)
RADIOACTIVE MATERIALS
[PLANT SUPPORT -
PS 2340]
IP 82701 OPERATIONAL STATUS OF THE 1
3/10-14/97 Core EP PROGRAM
[PLANT SUPPORT -
PS 2340]
IP 81700 PHYSICAL SECURITY PROGRAM 1
11/18-22/96 Core - Review of security
[PLANT SUPPORT - SI 2350]
2/18-21/97 plans and audits, corrective actions, vital area access control, PA detection equipment, management support and effectiveness IP 60855 ISFSI.
1 1/13-17/97 Regional Initiative - Heavy
[OPERATIONS -
SI 23501 Loads IP 37828 INSTALLATION AND TESTING 1
10 - 12/96 Regional Initiative - Water OF MODIFICATIONS hammer related inspection and
[ENGINEERING -
DRP 2210]
modification activities IP 72700 STARTUP TESTING 1
TBD Regional Initiative - Unit 3
[MAINTENANCE -
SI 23501 startup testing ENCLOSURE