HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program
Letter Sequence Request | |
---|---|
TAC:MF6583, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Open) | |
Initiation Administration Results
Other: | |
MONTHYEARHNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-08-18018 August 2015
[Table View]Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Project stage: Request HNP-15-083, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-09-29029 September 2015 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Project stage: Supplement ML15275A3572015-10-0808 October 2015 Acceptance of Requested Licensing Action for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Project stage: Acceptance Review HNP-16-011, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-02-0505 February 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program Project stage: Response to RAI HNP-16-034, Transmittal of Response to Second Request for Additional Information Regarding the License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee..2016-04-28028 April 2016 Transmittal of Response to Second Request for Additional Information Regarding the License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee.. Project stage: Request ML16141A0482016-05-19019 May 2016 Supplement to License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program Project stage: Supplement 2015-09-29 |
ML15236A254 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 08/18/2015 |
From: | Waldrep B Duke Energy Progress |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML15236A265 | List: |
References | |
HNP-15-040 | |
Download: ML15236A254 (2) | |
Similar Documents at Harris | |
---|---|
Category:Letter type:HNP
MONTHYEARHNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date2018-09-17017 September 2018
[Table view]Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval2018-06-0404 June 2018 Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 192018-05-0303 May 2018 Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19 HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2018-05-0202 May 2018 Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation2018-04-20020 April 2018 Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O2018-04-16016 April 2018 Cycle 22 Core Operating Limits Report, Revision O HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-02-16016 February 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 12018-02-14014 February 2018 Cycle 21 Core Operating Limits Report, Revision 1 HNP-18-017, CFR 50.54(q) Evaluations2018-02-0505 February 2018 CFR 50.54(q) Evaluations HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2018-01-22022 January 2018 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-01-18018 January 2018 Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations2018-01-11011 January 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors2018-01-0404 January 2018 Submittal of 14-Day Special Report for Accident Radiation Monitors HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-11-27027 November 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..2017-10-30030 October 2017 Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-10-30030 October 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.2017-10-0202 October 2017 Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-09-14014 September 2017 Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-09-13013 September 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-07-20020 July 2017 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-040, Snubber Program Plan2017-06-0101 June 2017 Snubber Program Plan HNP-17-051, 10 CFR 50.54(q) Evaluation2017-05-24024 May 2017 10 CFR 50.54(q) Evaluation HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center2017-05-24024 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations. HNP-17-047, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations. HNP-17-046, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..2017-04-25025 April 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106.. HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator2017-04-12012 April 2017 Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation2017-03-30030 March 2017 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.22017-02-16016 February 2017 Annual Report in Accordance with Technical Specifications, Section 6.9.1.2 HNP-17-015, Summary of 10 CFR 50.54(q) Evaluation2017-02-15015 February 2017 Summary of 10 CFR 50.54(q) Evaluation 2018-09-17 Category:Technical Specification MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024
[Table view]Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024 Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2021-11-15015 November 2021 Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown2021-09-23023 September 2021 License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21116A2072021-05-0404 May 2021 Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications2021-02-24024 February 2021 License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-07-27027 July 2020 Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2020-05-27027 May 2020 Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML20147A0402020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted) ML20147A0332020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System2020-05-12012 May 2020 License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2020-04-16016 April 2020 Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications2019-11-21021 November 2019 Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2019-11-0808 November 2019 License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-10-0707 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2019-07-25025 July 2019 License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-04-10010 April 2019 License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-18-0204, Transmittal of Technical Specification Bases2018-11-12012 November 2018 Transmittal of Technical Specification Bases HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du ML17066A2992017-03-28028 March 2017 2nd Correction to License Amendment No. 154 Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program HNP-16-066, License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report2016-12-0202 December 2016 License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process HNP-16-068, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2016-08-26026 August 2016 Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-16-064, Transmittal of Technical Specification Bases2016-08-10010 August 2016 Transmittal of Technical Specification Bases RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 HNP-15-038, License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change2015-12-17017 December 2015 License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change HNP-15-086, License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2015-10-29029 October 2015 License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-08-18018 August 2015 Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 2024-05-23 Category:Bases Change MONTHYEARRA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024
[Table view]Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2021-11-15015 November 2021 Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications2021-02-24024 February 2021 License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications ML20147A0332020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification ML20147A0402020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted) RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System2020-05-12012 May 2020 License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications2019-11-21021 November 2019 Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2019-11-0808 November 2019 License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-10-0707 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-04-10010 April 2019 License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-18-0204, Transmittal of Technical Specification Bases2018-11-12012 November 2018 Transmittal of Technical Specification Bases HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-16-066, License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report2016-12-0202 December 2016 License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process HNP-16-068, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2016-08-26026 August 2016 Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-16-064, Transmittal of Technical Specification Bases2016-08-10010 August 2016 Transmittal of Technical Specification Bases RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 HNP-15-038, License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change2015-12-17017 December 2015 License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change HNP-15-086, License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2015-10-29029 October 2015 License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-08-18018 August 2015 Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 HNP-15-046, Transmittal of Technical Specifications Bases2015-05-18018 May 2015 Transmittal of Technical Specifications Bases HNP-14-050, Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2014-04-24024 April 2014 Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process HNP-12-130, Transmittal of Technical Specifications Bases2012-12-0606 December 2012 Transmittal of Technical Specifications Bases HNP-11-097, Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information2011-12-20020 December 2011 Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information HNP-10-006, Request for License Amendment Proposed Revision to Technical Specification 3.6.2.2.a, Surveillance Requirement 4.6.2.2.d and Associated TS Bases to Incorporate an Expanded Range of Eductor Flow Rates2010-01-27027 January 2010 Request for License Amendment Proposed Revision to Technical Specification 3.6.2.2.a, Surveillance Requirement 4.6.2.2.d and Associated TS Bases to Incorporate an Expanded Range of Eductor Flow Rates ML0932002062009-11-16016 November 2009 Technical Specification Bases HNP-04-151, Technical Specification Bases Change: Undervoltage and Underfrequency - Reactor Coolant Pump Buses2004-10-19019 October 2004 Technical Specification Bases Change: Undervoltage and Underfrequency - Reactor Coolant Pump Buses HNP-03-015, TS Bases Change - Containment Isolation Valves2003-02-19019 February 2003 TS Bases Change - Containment Isolation Valves 2024-03-20 Category:Technical Specifications MONTHYEARML24059A4252024-08-14014 August 2024
[Table view]Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 ML21316A2482022-01-19019 January 2022 Issuance of Amendment No. 188, Regarding Revision of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation RA-20-0321, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Comple2020-11-11011 November 2020 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completi ML20183A4082020-07-0909 July 2020 Correction to Amendment No. 177 Regarding Elimination of Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML19225C0692019-09-19019 September 2019 Issuance of Amendment No. 175 Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints RA-18-0201, Corrected Technical Specification Page Regarding License Amendment Request to Self Perform Core Reload Design and Safety Analyses2018-10-15015 October 2018 Corrected Technical Specification Page Regarding License Amendment Request to Self Perform Core Reload Design and Safety Analyses ML17324B1292017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a TS Bases Control Program (CAC No. MD5802) - Corrected TS Pages ML17324B0482017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17074A6722017-05-25025 May 2017 Issuance of Amendment Relocation of Explosion Gas Monitoring Program Technical Specifications ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16155A1242016-07-25025 July 2016 Issuance of Amendment on Main Steam Safety Valve Lift Setting Tolerance, Nominal Reactor Trip Setpoint on Pressurizer Water Level, and Pressurizer Water Level Span in Technical Specifications RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-08-18018 August 2015 Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15163A0562015-06-30030 June 2015 Issuance of Amendment to Revised Technical Specifications Table 3.3-4, Engineered Safety Features Actuation System Instrumentation ML15075A2122014-11-30030 November 2014 Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data RA-15-000, Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data2014-11-30030 November 2014 Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data ML15075A2132014-11-30030 November 2014 Attachment 9 - DPC-NE-2005 Appendix I Harris Plant Specific Data ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security HNP-12-116, License Amendment Request to Revise Technical Specification Table 3.3-4 Re Degraded Voltage Time Delay Values2012-11-29029 November 2012 License Amendment Request to Revise Technical Specification Table 3.3-4 Re Degraded Voltage Time Delay Values HNP-12-098, Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-10-22022 October 2012 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process ML12080A2172012-03-20020 March 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages HNP-12-040, Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages2012-03-20020 March 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages HNP-11-067, License Amendment Request for Revision to Technical Specification Core Operating Limits Report References for Realistic Large Break LOCA Analysis2011-08-22022 August 2011 License Amendment Request for Revision to Technical Specification Core Operating Limits Report References for Realistic Large Break LOCA Analysis HNP-11-053, Transmittal of Technical Specifications Bases Revisions2011-05-0505 May 2011 Transmittal of Technical Specifications Bases Revisions ML1023707682010-08-16016 August 2010 Response to Second Request for Additional Information Regarding Amendment to Remove Credit for Boraflex in Boiling Water Reactor Spent Fuel Pool Storage Racks ML0926402472009-10-14014 October 2009 Issuance of Amendment Regarding Lowering the Minimum Allowed Level of the Ultimate Heat Sink Main Reservoir ML0923203862009-08-25025 August 2009 Correction to Operating License and Technical Specification Page Issued with Amendment No. 131 Issued on July 2, 2009 ML0923102232009-08-25025 August 2009 Correction to Operating License and Technical Specification Page Issued with Amendment No. 131 Issued on July 2, 2009 ML0923102862009-08-20020 August 2009 Letter & Technical Specifications - Corrections to Technical Specification Pages Issued with Amendment No. 128 Issued on January 29, 2009 HNP-08-075, Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks2008-09-29029 September 2008 Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks ML0814301512008-06-12012 June 2008 Technical Specifications, Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program HNP-08-049, Request for License Amendment Technical Specification 3.7.5a2008-04-30030 April 2008 Request for License Amendment Technical Specification 3.7.5a ML0726003592007-09-19019 September 2007 Technical Specification Page Correction Issued with Amendment No. 125 Issued on July 23, 2007 HNP-07-127, Correction to Technical Specification Page in Amendment 1252007-09-13013 September 2007 Correction to Technical Specification Page in Amendment 125 ML0724707482007-08-31031 August 2007 Technical Specification, Issuance of Amendment to Revise Steam Generator Water Level Trip Setpoint Values HNP-07-005, Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.52007-06-15015 June 2007 Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5 ML0622003982006-08-0202 August 2006 Request for License Amendment to Revise Values Associated with the Steam Generator Water Level Trip Setpoints ML0622004022006-08-0202 August 2006 Request for License Amendment HNP Calculation HNP-I/INST-1010 HNP-06-060, License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity2006-05-23023 May 2006 License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0606803122006-03-0808 March 2006 Tech Spec Pages for Amendment 120 Regarding Temperature Limit for Dissolved Oxygen in Reactor Coolant System HNP-05-143, Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools2005-12-22022 December 2005 Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools HNP-05-002, Supplemental Information to the Proposed License Amendment Request to Technical Specification (TS) 6.8.4.k and TS Surveillance Requirement (SR) 4.6.1.6.12005-12-0909 December 2005 Supplemental Information to the Proposed License Amendment Request to Technical Specification (TS) 6.8.4.k and TS Surveillance Requirement (SR) 4.6.1.6.1 ML0525105022005-09-0101 September 2005 Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools 2024-08-02 |
Text
/
- % ' Benjamin C. Waidrep DUKE Vice President ENERGY Harris Nuclear Plant
~5413 Shearon Harris Road New Hill NC 27562-9300 919.362.2000 10 CFR 50.90 August 18, 2015 Serial: HNP-15-040 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant (HNP), Unit 1 Docket No. 50-400/Renewed License No. NPF-63
Subject:
APPLICATION FOR TECHNICAL SPECIFICATION CHANGE REGARDING RISK-INFORMED JUSTIFICATION FOR THE RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE CONTROLLED PROGRAM Ladies and Gentlemen:
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR Part 50.90), "Application for Amendment of License, Construction Permit, or Early Site Permit," Duke Energy Progress, Inc. (Duke Energy) is submitting a request for an amendment to the Technical Specifications (TS) for Shearon Harris Nuclear Power Plant, Unit 1 (HNP).
The proposed amendment would modify HNP TSs by relocating specific surveillance frequencies to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specification Initiative SB, Risk-Informed Method for Control of Surveillance Frequencies." Additionally, the change would add a new program, the Surveillance Frequency Control Program, to TS Section 6, Administrative Controls. The changes are consistent with Nuclear Regulatory Commission (NRC) approved Technical Specification Task Force (TSTF) Standard Technical Specifications (STS) Change TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative Sb," Revision 3 (ADAMS Accession No. ML090850642). provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Enclosure 2 provides documentation of Probabilistic Risk Assessment (PRA) technical adequacy. Enclosure 3 provides the existing TS pages marked up to show the proposed changes. Enclosure 4 provides the proposed TS Bases changes (for information only). Enclosure 5 documents that the proposed amendment does not involve a Significant Hazards Consideration pursuant to the provisions of 10 CFR 50.92. provides a cross-reference between TSTF-425, Revision 3, and the HNP TSs that contain surveillance frequencies being proposed for relocation to a licensee controlled program.
Duke Energy requests approval of the proposedlicense amendment by August 2, 2016, with the amendment being implemented within 120 days.
U.S. Nuclear Regulatory Commission HNP-1 5-040 Page 2 In accordance with 10 CFR 50.91, "Notice for Public Comment; State Consultation," a copy of this application, with enclosures, is being provided to the state of North Carolina.
This document contains no new Regulatory Commitments.
Please refer any questions regarding this submittal to John Caves at (919) 362-2406.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August 18, 2015.
Sincerely, Benjamin C.W Vice President, Shearon Harris Nuclear Power Plant
Enclosures:
- 1. Description and Assessment
- 2. Documentation of Probabilistic Risk Assessment (PRA) Technical Adequacy
- 3. Proposed Technical Specification Changes
- 4. Proposed Technical Specification Bases Changes (For Information Only)
- 5. Proposed No Significant Hazards Consideration Determination
- 6. Cross-Reference between HNP Technical Specifications and TSTF-425, Revision 3 cc: Mr. J. D. Austin, NRC Sr. Resident Inspector, HNP Mr. W. L. Cox, Ill, Section Chief, N.C. DHSR (electronic distribution only:
lee.cox@dhhs. nc.gov)
Ms. M. Barillas, NRC Project Manager, HNP Mr. V. M. McCree, NRC Regional Administrator, Region II