ML15226A033
Jump to navigation
Jump to search
| ML15226A033 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 09/15/2014 |
| From: | Entergy Nuclear Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML15226A139 | List: |
| References | |
| PNP 2014-086 | |
| Download: ML15226A033 (1) | |
Text
FSAR CHAPTER 4 - PRIMARY COOLANT SYSTEM TABLE 4-20 Revision 27 Page 1 of 1 REACTOR VESSEL SURVEILLANCE COUPON REMOVAL SCHEDULE Withdrawal Sequence Capsule Removal Time (EFPY)
Capsule Fluence X 1019 (n/cm2)
Refuel Number First A-240 2.26 4.01 2
Second W-290 5.21 0.926 5
T-330 5.21 5
Third W-110 9.95 1.66 10 Fourth W-100 16.93 2.1 16 Fifth W-80
~ 31.96
~ 3.06
~ 27 W-280 Reserved for future use W-260 Reserved for future use T-150 Reserved for future use Revision of the removal schedule requires NRC approval prior to implementation per 10CFR50, Appendix H. Schedule approved by NRC August 14, 2007 (TAC No. MD3461).