Text
FSAR CHAPTER 4 - PRIMARY COOLANT SYSTEM TABLE 4-19 Revision 21 Page 1 of 1 PRIMARY COOLANT SYSTEM INSPECTION CE REQUIREMENTS ASME III CE Requirement Code Requirement Reactor Vessel Ultrasonic
- 1. 100% Volumetric Longitudinal
- 2. UT of Clad Bond to a 3" Diameter
- 2. None Unbonded Area Repair Standard Dye Penetrant
- 1. PT Test Root and Final Layer of
Welds for Partial Penetration Welds to Control Rod Drive Mechanism Head Adapters and Instrument Tube Connections
- 2. PT Test Finished Surface
- 2. None of Cladding Steam Generator Ultrasonic
- 1. 100% Volumetric Longitudinal
- 1. Longitudinal UT on a Testing (UT) and Shear Wave UT of 9" x 9" Grid Pattern Plate Material Dye Penetrant
- 1. PT Test Finished Surface of
- 1. None Testing (PT)
Primary Head Cladding Pressurizer Ultrasonic
- 1. 100% Volumetric Longitudinal
- 1. Longitudinal UT on a Testing (UT) and Shear Wave UT of 9" x 9" Grid Pattern Plate Material Dye Penetrant
- 1. PT Test on Finished Surface
- 1. None Testing (PT) of Cladding Radiography
- 1. Radiograph Heaters To Check
- 1. None (RT)
Heater Wire Positioning