ML15226A031

From kanterella
Jump to navigation Jump to search
1 to Final Safety Analysis Report, Section 4, Table 4-19
ML15226A031
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/15/2014
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15226A139 List:
References
PNP 2014-086
Download: ML15226A031 (1)


Text

FSAR CHAPTER 4 - PRIMARY COOLANT SYSTEM TABLE 4-19 Revision 21 Page 1 of 1 PRIMARY COOLANT SYSTEM INSPECTION CE REQUIREMENTS ASME III CE Requirement Code Requirement Reactor Vessel Ultrasonic

1. 100% Volumetric Longitudinal
1. Longitudinal UT on a Testing (UT) and Shear Wave UT of 9" x 9" Grid Pattern Plate Material
2. UT of Clad Bond to a 3" Diameter
2. None Unbonded Area Repair Standard Dye Penetrant
1. PT Test Root and Final Layer of
1. PT Test of Finished Weld Testing (PT)

Welds for Partial Penetration Welds to Control Rod Drive Mechanism Head Adapters and Instrument Tube Connections

2. PT Test Finished Surface
2. None of Cladding Steam Generator Ultrasonic
1. 100% Volumetric Longitudinal
1. Longitudinal UT on a Testing (UT) and Shear Wave UT of 9" x 9" Grid Pattern Plate Material Dye Penetrant
1. PT Test Finished Surface of
1. None Testing (PT)

Primary Head Cladding Pressurizer Ultrasonic

1. 100% Volumetric Longitudinal
1. Longitudinal UT on a Testing (UT) and Shear Wave UT of 9" x 9" Grid Pattern Plate Material Dye Penetrant
1. PT Test on Finished Surface
1. None Testing (PT) of Cladding Radiography
1. Radiograph Heaters To Check
1. None (RT)

Heater Wire Positioning