ML15224A571

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Repts 50-269/89-26,50-270/89-26 & 50-287/89-26 on 890724-26.Enforcement Conference Will Be Scheduled to Discuss Violations Noted in Rept
ML15224A571
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/07/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML15224A572 List:
References
NUDOCS 8908140276
Download: ML15224A571 (2)


See also: IR 05000269/1989026

Text

AUG

71989

Docket Nos. 50-269, 50-270, 50-287

License Nos. DPR-38, DPR-47, DPR-55

Duke Power Company

ATTN:

Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-269/89-26, 50-270/89-26 AND

50-287/89-26

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted

by 0. Masnyk July 24-26, 1989.

The inspection included a review of activities

authorized for your Oconee facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed Inspection Report.

Areas examined during the inspection are identified in the report.

Within

. these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violations described in the enclosed Inspection Report

are under consideration for escalated enforcement action.

Accordingly, no

Notice of Violation is being issued at this time, and no response to this

letter is required.

However,

please be advised that the number and

characterization of violations described in the enclosed Inspection Report may

change as a result of further NRC review. An Enforcement Conference to discuss

these violations will be scheduled at a future date.

You will be advised by

separate correspondence of the results of our deliberations on this matter.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure.

Therefore, the enclosure

to this letter, with the exception of the report cover page, which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

cjcrettransmlted h"Mt

890 14027 6 89 0 8 0 7

PDR

ADO--CK: 05000269

0

PDC

Duke Power Company

2

1? IS89

Should you have any questions concerning this letter, please contact us.

Sincerely,

Stewart D. Ebneter

Regional Administrator

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/encl:

M. S. Tuckman, Station Manager

cc w/Inspection Summary:

State of South Carolina

bcc w/encl:

NRR/DRIS/SB

bcc w/Inspection Summary:

NRC Resident Inspector

H. Pastis, NRR

Document Control Desk (RIDS IE04)

RII:DRSS

SS

RI :

S

R

S RII:DRP

RII DRP

OMasnyk

D cGuire

line

J

V_

l

onse r

AHerdt

08/_3/89

08/3/89

083 /89

08/3 /89

08/3 /89

08/3 /89

RI *

A

RI

RII:RA0

"

eyes

o dard

enins MErnst

08/, /89

08/) /89

08/3/89

08/ /89

08/ /89

Document transmittd herewith

containi sensitive urciessefisd

SAFEGUARDS INFORMATION

cos,

this

ocunt is

dncontrolled.