ML15224A554

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/89-16,50-270/89-16 & 50-287/89-16 on 890530-0602.No Violations or Deviations Noted
ML15224A554
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/13/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML15224A555 List:
References
NUDOCS 8907210024
Download: ML15224A554 (2)


See also: IR 05000269/1989016

Text

July 13, 1989

Docket Nos. 50-269, 50-270, 50-287

License Nos. DPR-38, DPR-47, DPR-55

Duke Power Company

ATTN:

Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC

28242

Gentlemen:

SUBJECT:

INSPECTION REPORT NOS. 50-269/89-16, 50-270/89-16 AND 50-287/89-16

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

H. Whitener and J. Zeiler on May 30 - June 2, 1989.

The inspection included a

review of activities authorized for your Oconee facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in

progress.

Within the scope of the inspection,

no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

original signed by

Caudle A. Julian

Caudle A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

Inspection Report

cc w/encl:

M. S. Tuckman, Station Manager

State of South Carolina

bcc w/encl:

(See page 2)

8E907210

(024 890'7 13I

FDR

AT"DCK<%. 05000269

I

FDC

.

July 13, 1989

.

Duke Power Company

2

bcc w/encl:

NRC Resident Inspector

H. Pastis, NRR

Document Control Desk

RU:DRS

RII:DRS

RII:DRS

RII:

P

Jfeiler:jz:gb

HWhitener

GBelisle

MSh

O

.

Mf

/89

07//89

07/14/89

07//o/89