ML15224A540
| ML15224A540 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/26/1989 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML15224A542 | List: |
| References | |
| NUDOCS 8906160083 | |
| Download: ML15224A540 (2) | |
See also: IR 05000269/1989014
Text
MAY
.
Docket Nos. 50-269, 50-270, 50-287
License Nos. DPR-38, DPR-47, DPR-55
Duke Power Company
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC
28242
Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-269/89-14, 50-270/89-14, AND 50-287/89-14
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
A. Gooden on May 15-19, 1989.
The inspection included a review of activities
authorized for your Oconee facility. At the conclusion of the inspection, the
findinqs were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
.
Within the scope of the inspection,
no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concernina this letter, please contact us.
Sincerely,
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
(See page 2)
Duke Power Company
2
.
Enclosure:
NRC Inspection Report
cc w/encl:
M. S. Tuckman, Station Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
H. Pastis, NRR
Document Control Desk
W. D. Travers, NRR
J. C. Heard, FEMA RIV
RH
RHF
AGooden b
a1in
MS
mock
5/20/89
5,/89
5/A /89