NOV 30 1981
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC
28242
Gentlemen:
Subject: Report Nos. 55F
815
50-270/81-23 and 50-287/81-23
This refers to the routine safety inspection conducted by Mr. J. M. Puckett of
this office on October 5-9,
1981,
of activities authorized by NRC Operating
License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility. Our preliminary
findings were discussed with Mr. J. E. Smith, Station Manager, at the conclusion
of the inspection.
Areas examined during this inspection included radiation protection and sampling.
Within these areas,
the inspection consisted of selective examinations of
procedures and representative records,
interviews with
personnel,
and
observations by the inspector.
.
During the inspection, it
was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith
as
Appendix A. Elements to be included in your response are delineated in
Appendix A.
One new unresolved item is identified in the enclosed inspection report.
This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
See Page 2
8201270699 820112
PDR ADOCK 05000269
G
Nov 30 1981
Duke Power Company
2
Enclosures:
1. Appendix A, Notice of Violation
2. Inspection Report Nos. 50-269/81-23,
50-270/81-23 and 50-287/81-23
cc w/encl:
J. E. Smith, Station Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
RII
RI
RII
RH
RII
JMPuckett:ht
CMHosey
A
AI
s
PJK
g
11/43/81
1 1,t /81
11
11
1 V8
11/ A/81