Forwards IE Insp Repts 50-269/81-23,50-270/81-23 & 50-287/81-23 on 811005-09 & Notice of Violation
ML15224A496
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/30/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15224A493 List:
References
NUDOCS 8201270699
Download: ML15224A496 (2)


See also: IR 05000269/1981023

Text

NOV 30 1981

Duke Power Company

ATTN:

Mr. W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC

28242

Gentlemen:

Subject: Report Nos. 55F

815

50-270/81-23 and 50-287/81-23

This refers to the routine safety inspection conducted by Mr. J. M. Puckett of

this office on October 5-9,

1981,

of activities authorized by NRC Operating

License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility. Our preliminary

findings were discussed with Mr. J. E. Smith, Station Manager, at the conclusion

of the inspection.

Areas examined during this inspection included radiation protection and sampling.

Within these areas,

the inspection consisted of selective examinations of

procedures and representative records,

interviews with

personnel,

and

observations by the inspector.

.

During the inspection, it

was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith

as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report.

This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

See Page 2

8201270699 820112

PDR ADOCK 05000269

G

PDR

Nov 30 1981

Duke Power Company

2

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-269/81-23,

50-270/81-23 and 50-287/81-23

cc w/encl:

J. E. Smith, Station Manager

bcc w/encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

RII

RI

RII

RH

RII

JMPuckett:ht

CMHosey

A

AI

s

PJK

g

11/43/81

1 1,t /81

11

11

1 V8

11/ A/81