Forwards IE Insp Repts 50-269/81-29,50-270/81-29, 50-287/81-29,50-369/81-35,50-370/81-19,50-413/81-25, 50-414/81-25,50-491/81-04,50-492/81-04 & 50-493/81-04 on 811102-06.No Noncompliance Noted
ML15224A467
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, Cherokee  Duke Energy icon.png
Issue date: 12/10/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15224A468 List:
References
NUDOCS 8112310466
Download: ML15224A467 (2)


See also: IR 05000269/1981029

Text

DEC 1 0 1981

Duke Power Company

ATTN:

Mr. W. 0. Parker, Jr.

Vice President, Steam Production

RJap___

P. 0. Box 2178

Charlotte, NC

28242

Gentlemen:

Subject: Report Nos.

50-269/81-29,

50-270/81-29,

50-287/81-29,

50-369/81-35,

50-370/81-19,

-

1-378T-25, 50-414/81-25, 50-491/81-04, 50-492/81-04,

& 50-493/81-04

This refers to the routine safety audit conducted by Mr. R. W. Wright and others

of this office on November 2-6, 1981 of the quality assurance program for design,

procurement,

and construction of the Oconee,

McGuire,

Catawba,

and Cherokee

facilities, and to the discussion of our preliminary findings held with

Mr.

L. C. Dail,

Vice President-Design Engineering, of your staff at the con

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas,

the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Pa . Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2

8112310466 811210

PDR ADOCK 05000269

G

PDR

DEC

' 0 19

.

Duke Power Company

2

Enclosure:

Inspection Report Nos. 50-269/81-29,

50-270/81-29, 50-287/81-29, 50-369/81-35,

50-370/81-19, 50-413/81-25, 50-414/81-25,

50-491/81-04, 50-492/81-04, & 50-493/81-04

cc w/encl:

J. E. Smith, Station Manager

M. D. McIntosh, Plant Manager

J. T. Moore, Project Manager

J. W. Hampton, Station Manager

J. C. Rogers, Project Manager

bcc w/encl:

NRC Resident Inspectors

Document Management Branch

State of North Carolina

RWright:ht

CMUpright

CMu

y

to is

logg

efl

/81

.4-1-7

/81

11/81

1/)//81

12///81

I1