ML15224A454

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/81-27,50-270/81-27 & 50-287/81-27 on 810910-1010.No Noncompliance Noted
ML15224A454
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/30/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15224A453 List:
References
NUDOCS 8111130610
Download: ML15224A454 (2)


See also: IR 05000269/1981027

Text

Duke Power Company

ATTN:

Mr. W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC

28242

Gentlemen:

Subject:

Report Nos.. Q-269/81-2 250-270/81-27 and 50-287/81-27

This refers to the routine safety inspection conducted by Mr. W. Orders of this

office on September 10 - October 10, 1981, of activities authorized by NRC

License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear facility and to the

discussion of our findings held with Mr. J. E. Smith, Plant Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

.

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to with

hold such information. If your receipt of this letter has been delayed such that

less than seven days are available for your review, please notify this office

promptly so that a new due date may be established. Consistent with section

2.790(b)(1), such application must be accompanied by an affidavit executed by the

owner of the information which identifies the document or part thereof sought to

be withheld, and a full statement of the reasons on the basis of which it is

claimed that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the considera

tions listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall

be incorporated as far as possible into a separate part of the affidavit. If we

do not hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Document Room.

all-

0

0

Duke Power Company

2

OCT 2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

Inspection Report Nos. 50-269/81-27

50-270/81-27 and 50-287/81-27

cc w/encl:

J. E. Smith, Station Manager

bcc w/encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

RII:RRPI

RII:RRPI

RII:R

.

W r ers

nt

PJK@Togg

10/,9,7/81

10/zg/81

10/30 /81