ML15224A454
| ML15224A454 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/30/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15224A453 | List: |
| References | |
| NUDOCS 8111130610 | |
| Download: ML15224A454 (2) | |
See also: IR 05000269/1981027
Text
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC
28242
Gentlemen:
Subject:
Report Nos.. Q-269/81-2 250-270/81-27 and 50-287/81-27
This refers to the routine safety inspection conducted by Mr. W. Orders of this
office on September 10 - October 10, 1981, of activities authorized by NRC
License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear facility and to the
discussion of our findings held with Mr. J. E. Smith, Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
.
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to with
hold such information. If your receipt of this letter has been delayed such that
less than seven days are available for your review, please notify this office
promptly so that a new due date may be established. Consistent with section
2.790(b)(1), such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part thereof sought to
be withheld, and a full statement of the reasons on the basis of which it is
claimed that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the considera
tions listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall
be incorporated as far as possible into a separate part of the affidavit. If we
do not hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room.
all-
0
0
Duke Power Company
2
OCT 2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
Inspection Report Nos. 50-269/81-27
50-270/81-27 and 50-287/81-27
cc w/encl:
J. E. Smith, Station Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
RII:RRPI
RII:RRPI
RII:R
.
W r ers
nt
PJK@Togg
10/,9,7/81
10/zg/81
10/30 /81