Forwards IE Insp Repts 50-269/81-19,50-270/81-19 & 50-287/81-19 on 810810-0910.No Noncompliance Noted
ML15224A442
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/30/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15224A443 List:
References
NUDOCS 8110200554
Download: ML15224A442 (2)


See also: IR 05000269/1981019

Text

SEP 30 1981

Duke Power Company

ATTN: Mr. W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC 28242

U98

Gentlemen:

Subject: Report Nos.C-1269 80-1 91 50-270/81-19, and 50-287 ?

-19

This refers to the routine safety inspection conducted by M. F. Jape of this

office on August 10 - September 10, 1981, of activities authorized by NRC

Operating License Nos. DPR-38, DPR-47, and DPR-55 for the Oconee Nuclear facility

and to the discussion of our findings held with Mr. J. E. Smith, Station Manager,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within the

8_11 20054e 9o

PDR- ADOCK 05000269

0

~_PDR

~

SEP 3 0 1a8a

Duke Power Company

2

specified periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2,

Division of Resident and

Reactor Project Inspection

Enclosures:

Inspection Report Nos. 50-269/81-19

50-270/81-19, and 50-287/81-19

cc w/encl:

J. E. Smith, Station Manager

bcc w/encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

RII

RH

RII

AI

n~is:dt/

ant

PJKP ag

9/94/81

9/25/81

9//81