ML15224A438

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/81-18,50-270/81-18 & 50-287/81-18 on 810710-0810 & Notice of Violation
ML15224A438
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/19/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15224A435 List:
References
NUDOCS 8109290685
Download: ML15224A438 (2)


See also: IR 05000269/1981018

Text

Duke Power Company

ATTN: Mr. W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject:

Report Nos

50-270/81-18, and 50-287/81-18

This refers to the routine safety inspection conducted by Mr. F. Jape of this

office on July 10 - August 10, 1981, of activities authorized by NRC Operating

License Nos. DPR-38, DPR-47, and DPR-55 for the Oconee facility. Our preliminary

findings were discussed with Mr. J. E. Smith, Station Manager, at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interyiews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

.disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within the

8109290685 810924

PDR ADOCK 05000269

G

PDR/

AUG1 9 198

Duke Power Company

2

specified periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Project Branch 3, Division of

Resident and Reactor Project

Inspection

Enclosures:

1. Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-269/81-18,

50-270/81-18, and 50-287/81-18

cc w/encl:

J. E. Smith, Station Manager

bcc w/encl:

NRC Resident Inspector

Document Management Branch

State of North Carolina

RII

RII

ae~dr

J

ryant

gg

8/ /81

8/)J/81

8//1/81