ML15223A888
| ML15223A888 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/28/1983 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML15223A889 | List: |
| References | |
| NUDOCS 8305200103 | |
| Download: ML15223A888 (4) | |
Text
April 28, 1983 DISTRIBUTION o
Mc FiIe onner
_ffR7Ffff_
RI ngram L PDR Gray File+4 Dockets Nos. 50-269, 50-270 ORB#4 Rdg EBlackwood and 50-287 DEisenhut HOrnstein OELD RBirkel AEOD JSuermann LHarmon EAdensam Mr.-H. B. Tucker, Vice President ACRS-10 Nuclear Production Department TBarnhart-12 P. 0. Box 33189 LSchneider 422 South Church Street OGC Charlotte., North Carolina 28242 OPA DBrinkman
Dear Mr. Tucker:
RDiggs ASLAB We have completed our review of the Oconee Nuclear Station Standby Shutdown Facility (SSF) described in your letters dated March 28, 1980, February 16 and March 31, 1981, April 13, September 20 and December 23, 1982. The SSF design was to resgive the safe shutdown requirementsvforJ fire protection (Appendix R to 10 CFR 50, Sections III.G.3 and ILL),
the turbine building flooding issue and physical security requirements.
Our Safety Evaluation (SE) is enclosed.
- .,,*'find your SSF design meets the appropriate requirements with the exception of process monitoring instruments fo rjsource range flux moniltoring and steam generator pressure indication. It is our under standing that Duke 41 iWjer Company desires to appeal this staff require ment on the McGuire, Unit No. 2 and Oconee dockets. We believe that a uniform approach should be taken for all of your units. An appeal meeting for all units, as requested by your March 31, 1983 letter on the McGuire docket will be scheduled in the near future.
While the exception noted above is being resolved, we request that your staff continue their work on the Technical Specifications needed to insure th operability of the SSF components agrees with fire,.flooding and security assumptions used in the design. We request such Technical Specifications be proposed about 90 days before the final acceptance of the SSF for Oconee, Unit No. 1.
Our interpretation of Appendix R to 10 CFR 50 is that all necessary repairs will be made and cold shutdown achieved in a 72-hour period. Your previous commitment is.
to be prepared to make all necessary repairs for cold shutdown and depressurization. We acknowledge that your commitment was submitted prior to issuance of Appendix R. In recent discussions with Mr. R. Gill of your sitaff, we have learned that Duke Power Company if willing to review the previous commitment on the 72-hour requirement of Appendix R,Section III.L.5 and modify their position or request an exemption from this specific regulation. A mutually agreed upon schedule for this review and submittal of the above res y1ts has been determined to be congruent with the requested Technical Specifications.
8305200103 83042&
PDR ADOCK 05000269
_PDR OFFICE)
SURNAME)
DATE NRC FORM 318 (10-80) NRCM 0240 OFF IC IAL RECORD COP'Y USGPO: 1981-335-96w.
The information requested herein affects fewer than 10 respondents and, therefore, OMB clearance is not required under P.L.96-511. If you have any questions on this letter or the enclosed SE, please contact your assigned NRC Project Manager.
Sincerely, John-F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing
Enclosure:
Safety Evaluation cc w/enclosure:
See next page
- See previous white for co urrence.
OFFICE
.gB#4:DL.
.. L...
...LB.4.:.L SURNAMEI0...R I z
... QP...
r...............
irk l.......
DATE
- .*41.
A
/
42 3.......
/83.......... 4 /.
NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
DISTRIBUTION:
Gray File 4
Docket File DEisenhut AND NRC PDR Ringram LH-armon L PDR ORB#4 Rdg AerAB Dockets Nos. 50-269, 50-270 TBarnhart and 50-287 DBri, kWf CMiles RDiggs LSchneider ACRS-10 Mr. H. B. Tucker, Vice Preside 'nt Nuclear Production Department*L Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 2620Ta
Dear Mr. Tucker:
We have completed our review of the Oconee Nuclear.Station Standby Shut down Facility (SF) described i, n your.ette~rs dated March 2 1980 February 16 and March 31, 1981 l13, September20LdcrDecember 3,
1982.
The SF design was to resolve theidfe shutdown requirements for fire protection (Appendix R to,10 CFR 50,.Septions 1III.G.3 and III.L),
the turbine building flooding issue and physical security, requirements.
Our Safety Evaluation is enclosed.
We find your SSF design meets the apprqpriate requir&P*ents. with the exception of process monitoring in-struments for so urce-range flux monitoring and steam generator pressure indication. Itis our urnder standing that Duke Power Company is pursuing the appeal of this staff requirement on the cGuire We agree that a uniform approach should be ta2en for both McGuire and Oconee Units.
While the exception noted above js, being resolved, we request that your staff continue their work on the-Technca Spcfications needed to insure the operability of the SSF coconents Stain StandSht and security assumptions used in the design. Werequest such Technical Specifications be proposed about.90 days b0 ore the cMplton o f the SSF tie-in for Oconee, Unit No.f1.
ldWe is will be Ihapy tisuss rhi s
enclosed Safety Evaluation, proposedTechnical Specifi cations or o' er issues with you.mart Sincerely, John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing
Enclosure:
Safety Evaluati on cc w/enclosure:
SeeC~
n a
ORB#4:DL
- 4 C-ORB#4:DL C-ASB:DSI LB#4:DL OFFICE RIngram 1
JStoff OParr Rel j.
SURNAME
- n n *********
4/ 1/83 4/3/83 4/
/83 4//83 4/
/83 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
Duke Power Company cc w/enclosure(s):
Mr. William L. Porter Duke Power Company P. 0. Box 33189 422 South Church Street Office of Intergovernmental Relations Charlotte, North Carolina 28242 116 West Jones Street Raleigh, North Carolina 27603 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.E.
Atlanta, Georgia 30308.
William T. Orders Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Manager, LIS NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515 J. Michael McGarry, III, Esq.
DeBevoise & Liberman 1200 17th Street, N.W.
Washington, D. C. 20036