ML15223A793

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Pressurized Thermal Shock Issue.Response by 820430
ML15223A793
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/05/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To: Parker W
DUKE POWER CO.
References
REF-GTECI-A-49, REF-GTECI-RV, TASK-A-49, TASK-OR NUDOCS 8205030399
Download: ML15223A793 (3)


Text

II

~

L 051982 DISTRIBUTION:

Docket File GVissing HOrnstein NRC PDR PWagner EBlackwood L PDR RIngram SHanauer ORB#4 Rdg OELD 0o DEisenhut AEOD Dockit No. 50-269 IE ACRS-10 9

RE~lE Gray File APR I31982>s Mr. William 0. Parker, Jr.

m m

M2 Vice President - Steam Production Tec Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Parker:

During our meeting of March 24, 1982, concerning the pressurized thermal shock (PTS).issue for Oconee I we indicated that we would provide a formal request for any additional information which would be desired as a result of the meeting.

The enclosure.identifies the requested addi tional information. We request the information be submitted by April 30, 1982.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L.96-511.

Sincerely, jaw r?. STQ94 John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Request for Additional Information cc w/enclosure:-.

See next page 82050303 ORB#4:DL ORB #4:D C-B#4:DL D:DST AD-0R: L OFFICE P a n rt nqa n

SURNAME A

..................... *S t.

/....

an r...

k 3 /Ai 3

/..

3/

//.2

/82 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960

eS.

Duke Power Company cc w/enclosure(s):

Mr..William L. Porter Duke Power Company P. 0. Box 33189 422 South Church Street Office of Intergovernmental Relations Charlotte, North Carolina 28242 116 West Jones Street Raleigh, North Carolina 27603 Oconee County Library 501.West Southbroad Street Walhalla, South Carolina 29691 Honorable James M. PhinnSY' County Supervisor of Oconee County Walhalla, South Carolina 29621 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Region II 101 Marietta Street,'Suite 3100 Atlanta, Georgia 30303 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.E.

Atlanta, Georgia 30308 William T. Orders Senior Resident Inspector u.S. Nuclear Kegulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Manager, LIS.

NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515 J. Michael McGarry, III, Esq.

DeBevoise & Liberman 1200 17th Street, N.W.

Washington, D. C. 20036

Enclosure REQUEST FOR ADDITIONAL INFORMATION CONCERNING PRESSURIZED THERMAL SHOCK AND REGARDING THE "150 DAY" RESPONSE TO NRC LETTER DATED AUGUST 21, 1981 FOR OCONEE 1 DOCKET NO. 50-269 Concerning Operator Actions

1. Provide an analysis or basis to justify the time assumed for correct operator action in the Overcooling Transient Evaluations, and in the Steam Line Break Evaluations.
2. In the cases for the overcooling transients and steam Tine break analyses, provide an evaluation of the-sensitivity of the transients to the time assumed for.operator action (i.e., if the operator isolates the feedwater 5, 10 or 20 minutes later than assumed or restarts a RCP 10'or 20 minutes later than assumed, what are the-resulting pressure/

temperature transients?).