ML15223A418
| ML15223A418 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/22/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15223A417 | List: |
| References | |
| NUDOCS 7902280049 | |
| Download: ML15223A418 (2) | |
See also: IR 05000269/1978038
Text
ORREG(,
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 303
JAN 2 2 1979
In Reply Refer To:
RII:FJ
50-269/78-38
50-270/78-36
50-287/78-38
Duke Power Company
Attn: Mr. William 0. Parker, Jr.
Vice President, Steam Production
Post Office Box 2178
422 South Church Street
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by Mr. Frank Jape of this office
on December 18-29, 1978 of activities authorized by NRC License Nos.
DPR-38, DPR-47, and DPR-55 for the Oconee facilities, Units 1, 2 and 3,
and to the discussion of our findings held with Mr. J. E. Smith at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document. If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
o90 2o 800M
JAN
'~ 1979
Duke Power Company
-2
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
R. C. 'Lewis, Chief (Acting)
Reactor Operations and
Nuclear Support Branch
Enclosures:
Inspection Report Nos. 50-269/78-38,
50-270/78-36 and 50-287/78/38
cc w/enclosures:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
Post Office Box 1175
. Seneca, South Carolina 29678