ML15223A413

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/78-35,50-270/78-33 & 50-287/78-35.No Noncompliance Noted
ML15223A413
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/18/1979
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15223A412 List:
References
NUDOCS 7902150431
Download: ML15223A413 (2)


See also: IR 05000269/1978035

Text

REG4,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

JAN 1 8 1979

In Reply Refer To:

RII:FJ

50-269/78-35

50-270/78-33

50-287/78-35

Duke Power Company

Attn: Mr. William 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this office

on December 11-14, 1978, of activities authorized by NRC Operating License

Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Unit 1, 2 and 3 facilities,

and to the discussion of our findings held with Mr. J. E. Smith at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

7902150 431

Duke Power Company

-2

JAN 1 8 1979

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report Nos.

50-269/78-35, 50-270/78-33

and 50-287/78-35

cc w/encl:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. 0.

Box 1175

Seneca, South Carolina 29678