ML15223A384
| ML15223A384 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/19/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15223A383 | List: |
| References | |
| NUDOCS 7901110171 | |
| Download: ML15223A384 (2) | |
See also: IR 05000269/1978034
Text
0tREG~,
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
Z
ATLANTA, GEORGIA 30303
DEC 1 9 1978
In Reply Refer To:
RII:JEO
50-269/78-34
50-270/78-32
50-287/78-34
Duke Power Company
Attn: Mr. William 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. J. E. Ouzts of this office on
December 6-8, 1978 of activities authorized by NRC Operating License Nos. DPR-38,
DPR-47 and DPR-55 for the Oconee Unit 1, 2 and 3 facilities, and to the
discussion of our findings held with Mr. J. E. Smith at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
7901.110[j
Duke Power Company
-2
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
F. J. Long, Chie
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report Nos. 50-269/78-34,
50-270/78-32 and 50-287/78-34
cc w/encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. 0. Box 1175
Seneca, South Carolina 29678