ML15223A377

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/78-30,50-270/78-28 & 50-287/78-30 on 781113-17.No Noncompliance Noted
ML15223A377
Person / Time
Site: Oconee  
Issue date: 12/14/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15223A375 List:
References
NUDOCS 7901100438
Download: ML15223A377 (2)


See also: IR 05000269/1978030

Text

sp REGo

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

In Reply Refer To:

DEC 14 1978

RII:DJP

50-269/78-30

50-270/78-28

50-287/78-30

Duke Power Company

ATTN:

Mr. William 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by D. J. Perrotti of this

office on November 13-17, 1978, of activities authorized by NRC

Operating License Nos. DPR-38, DPR-47, and DPR-55 for the Oconee

Units 1, 2, and 3 facilities, and to the discussion of our findings

held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

One new unresolved item resulted from this inspection and is discusspd

in the enclosed report. This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

7 9 01 1 00q5'.S

DEC 1 4 1978

-2

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

Jack T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-269/78-30,

50-270/78-28, 50-287/78-30

cc:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. 0. Box 1175

Seneca, South Carolina 29678