ML15223A339
| ML15223A339 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/21/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15223A338 | List: |
| References | |
| NUDOCS 7812130311 | |
| Download: ML15223A339 (2) | |
See also: IR 05000269/1978026
Text
t,,R REGU4
UNITED STATES
0
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30303
NOV 2 1 1978
In Reply Refer To:
RII:PTB
50-269/78-26
50-270/78-25
50-287/78-26
Duke Power Company
ATTN:
Mr. William 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
422 South Church Street
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by Mr. P. T. Burnett of this office
on October 23-27,
1978,
of activities authorized by NRC Operating License
Nos. DPR-38,
and DPR-55 for the Oconee Units 1, 2,
and 3 facility,
and to the discussion of our findings held with Mr. J. E. Smith, Plant
Manager at the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspectors.
Within the scope of this inspection,
no
items of noncompliance
were
disclosed.
In accordance
with Section 2.790
of the
NRC's
"Rules of Practice",
Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document
Room.
If
this report contains
any information that you
(or
your contractor)
believe to be proprietary,
it
is
necessary that you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any
such application must
include a full statement of the reasons on the basis of which it
is
claimed
that the information
is proprietary,
and should be prepared
so
that proprietary information
identified in the application is
contained
in
a separate part of the document.
If
we
do not hear
from you
in this regard
within the specified period,
the report
will be placed in the Public Document Room.
7 812 13 03//
NOV 2 1 1978
Duke Power Company
-2
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
F. L. Long, Chie
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report Nos. 50-269/78-26,
50-270/78-25 and 50-287/78-26
cc w/encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. 0. Box 1175
Seneca, South Carolina 29678