Forwards IE Insp Repts 50-269/78-21 & 50-287/78-22 on 780919-21 During Which No Items of Noncompliance Were Noted
ML15223A329
Person / Time
Site: Oconee  
Issue date: 11/02/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15223A328 List:
References
NUDOCS 7812070319
Download: ML15223A329 (2)


See also: IR 05000269/1978021

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, NLW.

ATLANTA, GEORGIA 30303

NOV 0 2 1978

In Reply Refer To:

RII:NE

50-269/78-2 1

50-287/78-22

Duke Power Company

ATTN:

Mr. William 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 33189

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by N. Economos of this office on

September 19-21, 1978, of activities authorized by NRC Operating License

Nos. DPR-38 and DPR-55 for the Oconee I and 3 facilities, and to the

discussion of our findings held with Mr. R. M. Koehler, Superintendent of

Technical Services, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

Two new unresolved items resulted from this inspection and are discussed in

the enclosed report.

This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2.

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe

7812070 3/7

U2 1978

Duke Power Company

-2

to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is

proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

C. E. Murphy, hief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-269/78-21

and 50-287/78-22

cc w/encl:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. 0. Box 1175

Seneca, South Carolina 29678