UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, NLW.
ATLANTA, GEORGIA 30303
NOV 0 2 1978
In Reply Refer To:
RII:NE
50-269/78-2 1
50-287/78-22
Duke Power Company
ATTN:
Mr. William 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 33189
422 South Church Street
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by N. Economos of this office on
September 19-21, 1978, of activities authorized by NRC Operating License
Nos. DPR-38 and DPR-55 for the Oconee I and 3 facilities, and to the
discussion of our findings held with Mr. R. M. Koehler, Superintendent of
Technical Services, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
Two new unresolved items resulted from this inspection and are discussed in
the enclosed report.
This item will be examined during subsequent
inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2.
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe
7812070 3/7
U2 1978
Duke Power Company
-2
to be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is
proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
C. E. Murphy, hief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-269/78-21
and 50-287/78-22
cc w/encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. 0. Box 1175
Seneca, South Carolina 29678