Forwards IE Inspec Rept 50-269/78-23 on 780926-29 During Which No Items of Noncompliance Were Noted
ML15223A322
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/21/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15223A320 List:
References
781026, NUDOCS 7812060329
Download: ML15223A322 (2)


See also: IR 05000269/1978023

Text

' o

NUCLEAR REGULATORY COMMISSIUN

a

REGION II

101 MARIETTA STREET. N.W.

ATLANTA, GEORGIA 30303

OCT 2 61978

In Reply Refer To:

RII:AHJ

50-269/78-23

Duke Power Company

Attn:

Mr. William 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. A. H. Johnson of this

office on September 26-29, 1978, of activities authorized by NRC Operating

License No. DPR-38 for the Oconee Unit 3 facility, and to the discussion

of our findings held with Mr. J. E. Smith at the conclusion of the

inspection.

O

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

Puplic Document Room.

III~~3)9

OCT 2 6 1978

Duke Power Company

-2

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No.

50-269/78-23