ML15223A322
| ML15223A322 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/21/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15223A320 | List: |
| References | |
| 781026, NUDOCS 7812060329 | |
| Download: ML15223A322 (2) | |
See also: IR 05000269/1978023
Text
' o
NUCLEAR REGULATORY COMMISSIUN
a
REGION II
101 MARIETTA STREET. N.W.
ATLANTA, GEORGIA 30303
OCT 2 61978
In Reply Refer To:
RII:AHJ
50-269/78-23
Duke Power Company
Attn:
Mr. William 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. A. H. Johnson of this
office on September 26-29, 1978, of activities authorized by NRC Operating
License No. DPR-38 for the Oconee Unit 3 facility, and to the discussion
of our findings held with Mr. J. E. Smith at the conclusion of the
inspection.
O
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document. If we do not hear from you in this
regard within the specified period, the report will be placed in the
Puplic Document Room.
III~~3)9
OCT 2 6 1978
Duke Power Company
-2
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No.
50-269/78-23
cc w/encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. 0. Box 1175
. Seneca, South Carolina 29678