ML15223A285

From kanterella
Jump to navigation Jump to search
Inspec Rept 50-269/78-23 Inadvertently Named Oconee Unit 3, Should Be Oconee Unit 1
ML15223A285
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/13/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
References
NUDOCS 7811220110
Download: ML15223A285 (1)


See also: IR 05000269/1978023

Text

  • 9/26-29/78

UNITED STATES

o

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

NOV 1 3 1978

In Reply Refer To:

RII:AHJ

50-269/78-23

Duke Power Company

ATTN:

Mr.

William 0. Parker, Jr.

Vice President, Steam Production

P. Q. Box 2178

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

Through an in office review of Inspection Report 50-269/78-23 it was

found that the transmittal letter and pages 1-2 and 1-3 of the inspection

report inadvertently named Oconee Unit 3 as the unit inspected.

The

above pages of Inspection Report 50-269/78-23 should have referenced

Oconee Unit 1, as this was the unit inspected.

We regret any inconvenience this oversight may have caused you.

Sincerely,

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

cc: Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P.

0. Box 1175

Seneca, South Carolina 29678

78 1l2201,