Forwards IE Insp Rept 50-287/79-13 on 790531-0601 & 0606-08. No Noncompliance Noted
ML15222A053
Person / Time
Site: Oconee 
Issue date: 06/21/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15222A052 List:
References
NUDOCS 7907260062
Download: ML15222A053 (2)


See also: IR 05000287/1979013

Text

o5

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

In Reply Refer To:

JUN 21979

RII:WPA

50-287/79-13

Duke Power Company

Attn: W. 0. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

-Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspections conducted by W. P. Ang of this office on

May 31 through June 1, 1979 and June 6-8, 1979 of activities authorized

by NRC License No. DPR-55 for the Oconee Nuclear Station facility, Unit

3, and to the discussion of our findings held with J. E. Smith and J. R.

Wells at the conclusion of the inspections.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

7907260 0 o

JUN 2 1 1979

Duke Power Company

-2

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

C. E. Hurp y

,Chj.e

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report No. 50-287/79-13

cc w/enclosure:

J. E. Smith, Station Manager

Post Office Box 1175

Seneca, South Carolina 29678