UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY CORPORATION DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 229 License No. DPR-55
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility)
Facility Operating License No. DPR-55 filed by the Duke Energy Corporation (the licensee) dated July 20, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9809010370 980826 PDR ADOCK 05000287 P
-2
- 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 229, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION erbert N. Berko, Direc or Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
August 26, 1998
ATTACHMENT TO LICENSE AMENDMENT NO. 229 FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains a vertical line indicating the areas of change.
Remove Insert 4.18-2 4.18-2
g 0
and extending the piston rod in the tension mode direction. All snubbers connected to an inoperable common hydraulic fluid reservoir shall be counted as inoperable snubbers.
Snubber operability will be verified in accordance with the following schedule:
No. Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period 0
18 months +/- 25%
1 12 months +/- 25%
2 6 months +/- 25%
3,4 4 months +/- 25%
5,6,7 2 months +/- 25%
8 1 month +/- 25%
Note:
(1)
The required inspection interval shall not be lengthened more than two steps per inspection.
(2)
Snubbers may be categorized in two groups, "accessible" or "inaccessible,"
based on their accessibility during reactor operation. These two groups may be inspected independently according to be above schedule.
(3)
Hydraulic and mechanical snubber inspection schedules are independent.
4.18.2 The seal service life of hydraulic snubbers shall be monitored to ensure that the seals do not exceed their expected service life by more than 10% between surveillance inspections.
The maximum expected service life for the various seals, seal materials, and applications shall be estimated based on engineering information, and the seals shall be replaced so that the maximum expected service life is not exceeded by more than 10% during a period when the snubber is required to be OPERABLE. The seal replacements shall be documented and the documentation shall be retained in accordance with Specification 6.5.1.m.
4.18.3 At least once every 18 months', a representative sample, a minimum of 10% of the total of hydraulic snubbers in use in the plant, shall be functionally tested either in place or in a bench test. For each hydraulic snubber that does not meet the functional test acceptance criteria of Specification 4.18.4, an additional minimum of 10% of the hydraulic snubbers shall be functionally tested until none are found inoperative or all have been functionally tested.
The representative sample selected for functional testing shall include the various configurations, operating environments and the range of size and capacity of hydraulic snubbers. The representative sample shall be selected randomly from the total population of safety-related hydraulic snubbers.
'A one-time extension of the snubber functional test frequency to a maximum of 25 months is allowed for Oconee Unit 3 during operating cycle 17. This extension also applies to the functional testing of mechanical snubbers required by Technical Specification 4.18.5.
Oconee 1, 2 and 3 4.18-2 Amendment No.228 (Unit 1)
Amendment No.229 (Unit 2)
Amendment No.229 (Unit 3)