Nuclear Regulatory Commission Plan for the Audit of Firstenergy Nuclear Operating Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 - Flooding for Davis-Besse Nuclear Power Station,
ML15181A011
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/06/2015
From: Minarik A
Japan Lessons-Learned Division
To: Boles B
FirstEnergy Nuclear Operating Co
Minarik A, NRR/JLD, 415-6185
References
TAC MF3721
Download: ML15181A011 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 6, 2015 Mr. Brian D. Boles Site Vice President - Nuclear -

Davis-Besse FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 N. State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

NUCLEAR REGULATORY COMMISSION PLAN FOR THE AUDIT OF FIRSTENERGY NUCLEAR OPERATING COMPANY'S FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATING TO THE NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. MF3721)

Dear Mr. Boles:

This letter documents the U.S. Nuclear Regulatory Commission (NRC) staff's plan to perform a regulatory audit of FirstEnergy Nuclear Operating Company's (FENOC, the licensee) supporting calculations for the Flood Hazard Reevaluation Report (FHRR) submittal related to the Near-Term Task Force Recommendation 2.1, Flooding for the Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse). This technical audit will be performed consistent with NRC Office of Nuclear Reactor Regulation, Office Instruction LIC-111, "Regulatory Audits, dated December 29, 2008, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082900195). The audit will be conducted over multiple sessions, as needed and the NRC staff will develop an audit summary report to document its observations and conclusions within 90 days of the final audit session.

The audit will provide the NRC staff with a better understanding of the Davis-Besse FHRR submitted by letter dated March 11, 2014 (ADAMS Accession No. ML14070A108). Specifically, the audit will provide the NRC staff with a better understanding of the analyses of the flooding hazards presented in the Davis-Besse FHRR. The audit is intended to support completion of the staff's review of the FHRR and the subsequent issuance of a Staff Assessment.

The enclosed audit plan outlines the process that will allow the NRC staff to identify additional information potentially necessary for licensees to supplement their FHRRs, and resolve any potential technical concerns. The details of this audit have been discussed with Mr. Phil Lashley of FENOC.

B. Boles If you have any questions, please contact me at (301) 415-6185 or by e-mail at anthony.minarik@nrc.gov.

Sincerely,

~~ciManager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

Audit Plan cc w/encl: Distribution via Listserv

NRC PLAN FOR THE AUDIT OF FIRSTENERGY NUCLEAR OPERATING COMPANY'S FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATING TO THE NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR DAVIS-BESSE NUCLEAR STATION. UNIT 1 BACKGROUND AND AUDIT BASIS By letter dated March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 10 of the Code of Federal Regulations (10 CFR),

Section 50.54(f) "Conditions of license" (hereafter referred to as the "50.54(f) letter"). The request was issued in connection with implementing lessons-learned from the 2011 accident at the Fukushima Dai-ichi nuclear power plant, as documented in The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Recommendation 2.1 of that document recommended that the staff issue orders to all licensees to reevaluate seismic and flooding for their sites against current NRC requirements and guidance. Subsequent Staff Requirements Memoranda associated with Commission Papers SECY 11-0124 and SECY-11-0137, instructed the NRC staff to issue requests for information to licensees pursuant to 10 CFR 50.54(f).

By letter dated March 11, 2014, FirstEnergy Nuclear Operating Company (FENOC, the licensee), submitted its Flood Hazard Reevaluation Report (FHRR) for Davis-Besse Nuclear Station, Unit 1 (Davis-Besse) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14070A108). The NRC staff has begun its review of the aforementioned submittals and plans to conduct a regulatory audit of FENOC to aid in its review of the licensee's FHRR.

REGULATORY AUDIT SCOPE AND METHODOLGY The areas of focus for the regulatory audit is the information contained in the Davis-Besse FHRR submittal, and all associated and relevant supporting documentation used in the development of the aforementioned document including, but not limited to, methodology, process information, calculations, computer models, etc. The audit will be conducted and completed over several meetings that are to be determined, as necessary.

Enclosure

INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT The information required for the audit is the licensee's models and supporting calculations, as well as documentation related to the area streams and rivers and local intense precipitation analyses. Other information needs will be discussed as audit meetings are scheduled.

NRC AUDIT TEAM Title Team Member Affiliation Team Leader, NRR/JLD Anthony Minarik NRC Branch Chief, NRO/DSEA Chris Cook NRC Technical Lead Mike Lee NRC Technical Manager Mike Willinoham NRC Technical Support John Quinn Argonne National Laboratory Technical Support Kay Wuthrich Argonne National Laboratory LOGISTICS The audit meetings will be coordinated with FENOC staff.

DELIVERABLES The NRC team will develop an audit summary report to convey the audit results. The report will be placed in ADAMS within 90 days of the completion of the final audit session, and will be publicly available.

The information discussed in the audit may be included, fully or in part, in the development of the NRC technical staff's assessments as a result of the FHRR review.

B. Boles If you have any questions, please contact me at (301) 415-6185 or by e-mail at anthony.minarik@nrc.gov.

Sincerely, IRA/

Anthony J. Minarik, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

Audit Plan cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC JLD R/F RidsNRRJLD Resource SBreithaupt, NRO MShams, NRR MWillingham, NRO AMinarik, NRR CCook, NRO ARivera, NRO MLee, NRO MFranovich, NRR JBowen, NRR RidsNrrDorllpl3-2 BHarvey,NRO RidsNrrPMDavisBesseResource ADAMS Accession No.: ML15181A011 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME AMinarik SLent MS hams AMinarik DATE 07/02/15 07/01/15 07/02/15 07/06/15 OFFICAL RECORD COPY