OFFICIAL USE ONLY SECUl'UT'f "'ELATED INfO"'MATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant
(
Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165
- July 13, 2015
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - DAM SAFETY INSPECTION REPORT (TAC NO. MF5201)
Dear Mr. Waldrep:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission. This report contains the results of an insp.ection on April 1, 2015, of the auxiliary reservoir dam at the Shearon Harris Nuclear Power Plant, Unit 1. Based on observations made during field inspection, review of data submitted by the owner, and discussions with NRC and licensee representatives, FERC found that the Shearon Harris Auxiliary Reservoir Dam and appurtenant structures were in satisfactory condition and adequately maintained.. No conditions were found adversely affecting the safety, permanence, and operational reliability of the reservoir.
At FERC's request, the enclosure is not being made publicly available, since it contains critical energy infrastructure information.
Docket No. 50-400
Enclosure:
Dam Safety Inspection Report cc w/o enclosure: Distribution via Listserv Sincerely, Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation The enclosure transmitted herewith contains Security-Related Information. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY= SECURITY RELATED INFORMATION
OFFICIAL USE ONLY SECURITY RELATED INFORMATION Mr. Benjamin C. Waldrep Site Vice President July 13, 2015 Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - DAM SAFETY INSPECTION REPORT (TAC NO. MF5201)
Dear Mr. Waldrep:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERG) for the U.S. Nuclear Regulatory Commission. This report contains the results of an inspection on April 1, 2015, of the auxiliary reservoir dam at the Shearon Harris Nuclear Power Plant, Unit 1. Based on observations made during field inspection, review of data submitted by the owner, and discussions with NRG and licensee representatives, FERC found that the Shearon Harris Auxiliary Reservoir Dam and appurtenant structures were in satisfactory condition and adequately maintained. No conditions were found adversely affecting the safety, permanence, and operational reliability of the reservoir.
At. FER C's request, the enclosure is not being made publicly available, since it contains critical energy infrastructure information.
Docket No. 50-400
Enclosure:
Sincerely,
/RA/
Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Dam Safety Inspection Report ----
cc w/O enclosure: Distribution via Listserv The enclosure transmitted herewith contains Security-Related Information. When separated from enclosure, this transmittal document is decontrolled.
DISTRIBUTION:
PUBLIC RidsNrrDorllpl2-2 RidsNrrDorlDpr R~sNrrPMSheamnHa~s RidsNrrLABClayton RidsRgn2MailCenter RidsN rrDeEmcb RidsACRS MailCTR DHoang, NRR ADAMS A ccess1on N os.: LTR ML15173A135 s
"t R I t d R rt ML15173A140 ecurny-ea e epo OFFICE DORL/LPL2-2/PM DORL/LPL2-2/PM DORL/LPL2-2/LA DORL/LPL2-2/LA NAME DGalvin MBarillas LRonewicz BClayton DATE 06/25/15 06/25/15 06/25/15 07/06/15 OFFICE.
DE/EMCB DORL/LPL2-2/BC DORL/LPL2-2/PM NAME DHoang SHelton MBarillas DATE 06/22/15 07/02/15 07/13/15 OFFICIAL RECORD COPY OFFICIAL USE ONLY SECURITY RELATED INFORMATION