Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations
ML15154A678
Person / Time
Site: Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Braidwood, Limerick, Clinton, LaSalle
Issue date: 05/20/2015
From: David Gudger
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-2015-05
Download: ML15154A678 (18)


Text

Exelon Generation 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com RS-2015-05 May 20, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-41 O Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

U.S. Nuclear Regulatory Commission May 20, 2015 Page2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2015-05, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

1. NRC Regulatory Issue Summary 2015-05, "Preparation and Scheduling of Operator Licensing Examinations," dated April 20, 2015
2. NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations," dated April 29, 2014 In Reference 1, the Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2017 through 2020, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2017 and 2018. Attachments 1through14 provide responses to RIS 2015-05 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In Reference 2, the Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2016 through 2019. As discussed with your office, for LaSalle County Station, Units 1 and 2, the number of Initial Operator License Examinations has increased. Therefore, a revised NRC Form 536 is being submitted in Attachment 6, for CY 2016 - 2019.

There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Laura Cates at (610) 765-5729.

Respectfully, Da Gudger I

Manager - Licensing & Regulatory Affairs - Northeast Exelon Generation Company, LLC

May 20, 2015 U.S. Nuclear Regulatory Commission Page 3 cc:

Regional Administrator - NRG Region I Regional Administrator-NRG Region Ill -

Response to Regulatory Issue Summary 2015-05 for Braidwood Station -

Response to Regulatory Issue Summary 2015-05 for Byron Station -

Response to Regulatory Issue Summary 2015-05 for Calvert Cliffs Nuclear Power Station -

Response to Regulatory Issue Summary 2015-05 for Clinton Power Station -

Response to Regulatory Issue Summary 2015-05 for Dresden Nuclear Power Station -

Response to Regulatory Issue Summary 2014-05 for LaSalle County Station -

Response to Regulatory Issue Summary 2015-05 for LaSalle County Station -

Response to Regulatory Issue Summary 2015-05 for Limerick Generating Station -

Response to Regulatory Issue Summary 2015-05 for Nine Mile Point Nuclear Station - Unit 1 O - Response to Regulatory Issue Summary 2015-05 for Nine Mile Point Nuclear Station - Unit 2 1 - Response to Regulatory Issue Summary 2015-05 for Oyster Creek Nuclear Generating Station 2 - Response to Regulatory Issue Summary 2015-05 for Peach Bottom Atomic Power Station 3 - Response to Regulatory Issue Summary 2015-05 Quad Cities Nuclear Power Station 4 - Response to Regulatory Issue Summary 2015-05 for R. E. Ginna Nuclear Power Plant 5 - Response to Regulatory Issue Summary 2015-05 for Three Mile Island Nuclear Station

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015) *¥'

Estimated burden per response to comply with !his voluntary information colleciion request I hour.

This informauon collection Is used to plan budgets and resources for operator

t n

OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the FOtA, Privacy. and Information 0

. c Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

~......

01 EXAMINATION DATA 20555-0001, or by internet e-mail to tnfocollects.Resource@nrt.gov, and to the Desk Officer,

"........... +

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of MS11agement and Budget, Washington, DC 20503. If a means used to Impose an information collection does not display a currently valid OMS control number, Iha NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRCREGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

l 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR 0

9 0

12 OPERATORS NUMBER OF SENIOR REACTOR 0

11 0

10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 05/29/2018 NIA 0310212020 ALTERNATE DATE 06/04/2018 03/09/2020 N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMB.ER ESTIMATED NUMBER OF 20 0

0 CANDIDATES 0

0 0

0 22 NRC FORM 536 (01*2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1of1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2017 (01-2015)

~ P.P Eav, Estimated burden per response to comply with this voluntary information collection request: 1

.::P hour.

This information collection is used to plan budgets and resources for operator

.. ~})AS:1' 0

<?.

/!!

~

OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information 0

~~~i Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

~

EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk OffK:er,

.o Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION Byron Station, Units l and 2 Ill Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED I

l l

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY 2018 CY 2019 CY 2020 NUMBER OF REACTOR 6

6 6

0 OPERATORS NUMBER OF SENIOR REACTOR 8

8 8

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

0 l

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DA TES PRIMARY DATE ll/1312017 I 012912018 11/12/2019 NIA ALTERNATE DATE 1112012017 1110512018 1111812019 NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 15 CANDIDATES NRC FORM 536 (01*2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1of1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2017 (01-2015)

FACILITY OPERA TOR LICENSING EXAMINATION DATA Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53}, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503.

~a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

NRG REGION I

Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY2017 CY2018 0

5 0

7 0

3 0

0 NIA 6111/2018 NIA 719/2018 CY2019 CY2020 0

1 0

0 CY2019 CY2020 0

5 0

7 0

3 0

0 NIA 618/2020 NIA 7/6/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (01-2015)

MARCH 0

CY 2017 JUNE SEPTEMBER DECEMBER MARCH 0

0 0

0 CY 2018 JUNE SEPTEMBER DECEMBER 0

0 12

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2.017 (01*2015)

Estimated burden per response IO CO"lllY with this voluntary information collection request: 1

{~';

hour.

This information collection Is used to plan budgets and resowces for operator OPERA TOR LICENSING examinations. Send comments rega!ding burden estimate to the FOIA, Privacy, and Information

~

Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

\\

EXAMINATION DATA 20555-0001, or by internet e*mall to lnfocolleas.Resoun:e@nrc.gov, and to the Desk Officer, If-I)

+0 Office of Information and Regulatory Affairs, NEOB-10202, (315().0131), Olflce of Management and Budget, Washington, DC 20503.

W a means used to Impose an information conectlon does not display a currently vaBd OMB contrnt number, the NRC may not conduct or sponsor, and a pelSOn is not required to respond to, the information collection.

FACILITY NRCRc:u1v" Clinton Power Station, Unit l III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR 0

4 0

4 OPERATORS NUMBER OF SENIOR REACTOR 0

6 0

6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

2 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE NA 10/22/18 NA 10/19/20 ALTERNATE DATE NA 10/29/18 NA 10/26/20 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 10 0

0 0

0 0

CANDIDATES NRC FORM 536 (01*2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1of1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01*2015)

'li:J'R REC(I(

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator

,,,~,,,.

o'f:t.

/!!

OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information 0

'¢ rt :

Collections Branch (T*5 F53}, U.S. Nuclear Regulatory Commission, Washington. DC

~

-~

EXAMINATION DATA 20555-0001, or by internet &-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer,

...... 1':

o~

~

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a curren~y valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY2018 CY 2019 CY2020 NUMBER OF REACTOR 3

0 3

3 OPERATORS NUMBER OF SENIOR REACTOR 12 0

12 5

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/28/2017 NA 03/25/2019 08/17/2020 ALTERNATE DATE 09/1112017 NA 03/18/2019 08/24/2020

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 15 0

0 0

0 0

CANDIDATES NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1of1 NRC FORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 10/31/2017 (01-2015)

Estimated burden per response to comply v.tth this vounlaty informalioo collection request: 1

~w/

hour.

Tllis lnlormation collection is used 1D plan budgelS and resources for operator n

OPERA TOR LICENSING 8laminatioos. Send comments regarding burden estimate to !he FOIA Privacy, and Information

~i c

Collections Branch (T-5 FSJ), U.S. Nuclear RegulalJlri Commission. Washingtoo, DC

'"~,,.

./

EXAMINATION DATA 20555-0001, or by intemGI 1t-mail to lnfocollects.Resource@nrc.gov, and to Iha Desk Officer.

Offloa of lnfoonation and RegulalllfY Aflats, NEOB-10202, (3150.0131), Office of Managemanl and Budge~ Washington, DC 20503. If a means used lo imposa an information oollection doea not di<play a currently valid OMB control number, the NRG may not ronduct or sponsor, and a peroon is not rnquired lo respond lo, the ilformation colectioo.

FACILllY NRCREGION LaSalle County Station, Units I and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY 2019 NUMBER OF REACTOR 11 0

IO 0

OPERATORS NUMBER OF SENIOR REACTOR 13 0

12 0

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 10/17/2016 NIA I 0/15/2018 NIA ALTERNATE DATE 10124/2016 NIA 1012212018 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

22 0

0 CANDIDATES NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1 of 1 NRC FORM636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 10/31/2017 (01-2015)

~

Estimated burden per rasponse ID comply ~

1his volunlaly infOllT181ion collection request 1

~¥'

hour.

This informalion collection is used ID plan budgets and resources fer opera!Dr

~

OPERA TOR LICENSING eitaminatioos. Send comments regllllin!J burden estimate ID lhe FOIA, Privacy, and Information

~

Collections Branch {T-5 F53), U.S. Nuclear RegulatOIY Commission, Washinglon, DC

"/

"<t,9 EXAMINATION DATA 20555-0001, or by internet e-mail lo lnfocolecis.Resource@nrc.gov. and lo !he Oesk Officer, Office of lnfonnation and Regulalruy Alfairs, NEOB-10202, (3150-0131). Olllce of Management and Budget, Washington, DC 20503.

tt a means used lo impose an information colleci!oo dOO!I nol display a currenl!y vafid OMB control number, lhe NRC may not conduct or sponsor, and a person is not required ID respond ID, the infoonation collection.

FACILllY NRCREGION LaSalle County Station, Units I and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY20I7 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

I 0

I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS

8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR 0

10 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

12 0

4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

2 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE NIA 10/15/2018 N/A 1011912020 ALTERNATE DATE NIA 1012212018 NIA IOi26!2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

22 0

0 0

0 0

0 CANDIDATES NRC FORM 53e (01 -2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1of1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015)

FACILITY OPERA TOR LICENSING EXAMINATION DATA Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53}, U.S. Nuclear Regulatory Commission, Washington, DC 205~001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

NRCREGION I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY2017 CY2018 7

4 5

3 1

1 0

0 02/06/2017 02/05/2018 02/13/2017 02/12/2018 CY2019 CY2020 1

1 0

0 CY2019 CY2020 4

4 3

3 1

0 0

02/04/2019 02/03/2020 02/11/2019 02/10/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 7

0 0

0 7

0 CANDIDATES NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015)

(}'iJ!lo11o HCf]tlt*

Estimated burden per response to comply with this voluntary information collection request: 1

'~W/

hour.

This information collection is used to plan budgets and resources for operator

~i~,~~

OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

~

'1 EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer,

"'+..,, ~.

.,o'

    • 1t**

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit 1 Region I Renewed Facility Operating License No. DPR-63 Docket No. 50-220 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY 2019 CY 2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY2018 CY 201 9 CY 2020 NUMBER OF REACTOR 6

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 5

0 5

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 0210612017 NIA 01/0712019 NIA ALTERNATE DATE NIA NIA 0111412019 NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF NIA NIA 11 NIA NIA NIA NIA NIA CANDIDATES NRG FORM 536 (01-201 5)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 0 Page 1of1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015)

FACILITY OPERATOR LICENSING EXAMINATION DATA Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

NRCREGION Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY2017 CY2018 0

6 0

6 0

0 0

0 NIA 01/0812018 NIA 0111612018 CY2019 CY2020 0

1 0

0 CY2019 CY2020 0

6 0

6 0

0 0

0 NIA 0111312020 Nia 0112112020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF NIA NIA NIA NIA NIA NIA 12 NIA CANDIDATES NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 1 Page 1of1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015)

~' lv~~ HCnut.., ~

Estimated burden per response to comply with this voluntary information collection request: 1 fr.~

.o~"'

hour.

This informatkln collection is used to plan budgets and resources for operator

(

r, OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information r,

~:

Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

~

EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer,

"'+..,

.. d' Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCRt:LilON Oyster Creek Nuclear Generating Station I

Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR 0

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DA TES PRIMARY DATE NIA NIA NIA NIA ALTERNATE DATE NIA NIA NIA NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 2 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015)

~l~;;Jof:l.. Nt'f]ut.,"

Estimated burden per response to comply with this voluntary information collection request: 1

l

. ;IQ~..(.

hour.

This information collection is used to plan budgets and resources for operator J,

OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information

~

,I* C Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

\\

I EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer,

.,.tS-Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION Peach Bottom Atomic Power Station, Units 2 and 3 Region I Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR 6

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 7

0 5

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3120117 NIA 3125119 NIA ALTERNATE DATE 3127/17 NIA 411119 NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF NIA NIA 11 NIA NIA NIA N/A NIA CANDIDATES NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 3 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 10131/2017 (01-2015)

~flfl(Qf)I Estimaled burden per response to comply with this voluntary informalion coliacUon request: 1

~

nour.

This information collection is used lo plan budgets and resources for operator

~:'i

.01..

g... \\ /.., l OPERATOR LICENSING examinations. Send comments regarding bulden estimate lo the FO!A, Privacy, and lntarmation Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington. DC rt..

EXAMINATION DATA 20555-0001. or by internet e-mail to lnfocoilacts.Resourca@nrc.gov, and to the Desk Officer

'~

o~

~

Office of lnlormatlon and Regulatory Affairs, NEOB-10202. (3150*0131), Office of Management and Budget, Washington, DC 20503. If a means used ta impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a

~on is not required to respond to, ~~e information cvllection.

l'ACIUTY NR<.;REGION Quad Cities Nuclear Power Station, Units 1 and 2 Region III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

I 0

l EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR 0

5 0

5 OPERATORS NUMBER OF SENIOR REACTOR 0

13 0

13 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 03/19/2018 N/A 03/16/2020 ALTERNATE DATE N/A 03/26/2018 N/A 03/23/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2017 CY 201 8 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 18 0

CANDIDATES NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 4 Page 1of1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015) tJto~ REGtJ~

Estimated burden per response to comply with this voluntary information collection request: 1

-~~~.

hour.

This information collection is used to plan budgets and resources for operator

§. ~~ ti, ~

OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information

~ ii_

Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

.,,..°"IJ

..,.o.$!

EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION R.E. Ginna Nuclear Power Plant I

Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 201 7 CY2018 CY201 9 CY 2020 NUMBER OF REACTOR 8

0 8

0 OPERATORS NUMBER OF SENIOR REACTOR 5

0 5

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2

0 3

0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3/31/2017 N/A 1/22/2019 N/A ALTERNATE DATE 3/20/2017 N/A 1/28/2019 N/A

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 13 0

0 0

0 0

NRC FORM 536 (01-2015)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2015-05 5 Page 1 of 1 NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160--0131 EXPIRES: 10/31/2017 (01*2015)

""'""Ila",..

Estimated bumen per response to comply wi:h this wlun;ary 'nformation collecl!on request 1 l~

0~

hour.

This infcnmatioo collecfon is used lo plan budgets and resourtes for operator

~

11 OPERATOR LICENSING examlnatJOns. Send comments regaming burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53}, U.S. Nuc!ear Regulatory Commission, Wash1111lton. DC

\\.+.

of EXAMINATION DA TA 20555*0001. or by internet e-ma:I to lnfoccllacts.Rescurce@nrt.gov. and to the Desk Officer,

~.......

Office of Information and Regulatory Affair.;, NEOB* 10202, (3150-0131 ). Office of Managemen:

and Budget, Washington, DC 20503.

If a means used lo impose an information col'eciion does not display a currently valid OMB conUol number, the NRC may not conduct or sponsor, and a person is not requ~ed to respond to, the information coilection.

FACILITY NRCREGION Three Mile Island Nuclear Station, Unit 1 I

Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 16 0

12 0

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR 9

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 5

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

0 1

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 06/19/17 N/A 6/17119 N/A ALTERNATE DATE 06/26/17 NIA 6/24/ 19 NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 201 8 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 12 0

0 0

CANDIDATES NRC FORM 536 (01 -20151