Letter Sequence ' |
---|
|
|
MONTHYEARRS-14-310, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality2014-12-30030 December 2014 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality Project stage: Request ML15105A5502015-04-24024 April 2015 Nonacceptance of Requested Licensing Action Spent Fuel Storage Pool Criticality Methodology Project stage: Acceptance Review ML15152A3762015-05-21021 May 2015 NRR E-mail Capture - (TAC Nos. MF5734/MF5735) Draft Acceptance Review for License Amendment Request Spent Fuel Storage Pool Criticality Methodology and Proposed Change TS 4.3.1, Criticality for Dresden Nuclear Power Station 2, 3 ML15147A6102015-06-15015 June 2015 Summary of the April 7, 2015, Meeting with Exelon Generation Company LLC, on the License Amendment Request to Add Spent Fuel Pool Methodology and Proposed Change to Technical Specification 4.3.1 for Dresden Nuclear Power Station, Units 2 an Project stage: Meeting ML15149A3852015-06-25025 June 2015 Acceptance of License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality Project stage: Acceptance Review ML15253A6682015-09-0202 September 2015 NRR E-mail Capture - (TAC Nos. MF5734/MF5735) Revisions to Draft Rai'S for License Amendment Request Spent Fuel Storage Pool Criticality Methodology and Proposed Change TS 4.3.1, Project stage: Draft Other ML15232A6702015-09-29029 September 2015 Request for Additional Information Related to Dresden Units 2 and 3 License Amendment Request for Spent Fuel Storage Criticality Methodology Project stage: RAI ML15275A4152015-10-16016 October 2015 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3 Project stage: Withholding Request Acceptance 2015-05-21
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23339A0882023-12-0404 December 2023 NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief I5R-22 ML23328A0092023-11-22022 November 2023 Supplement - Dresden Security Rule Exemption Request ISFSI Docket No. Reference (EPID L-2023-LLE-0031) (Email) ML23304A0172023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Dresden 1, 2 & 3 - Exemption from Security Rule (L-2023-LLE-0031) ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23263A9932023-09-20020 September 2023 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Acceptance of Licensing Action Submittal Re Amendment to Adopt TSTF-564 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23052A0652023-02-21021 February 2023 NRR E-mail Capture - Dresden Units 2 and 3 - Request for Additional Information for Alternative Request RV-23H ML23026A0172023-01-23023 January 2023 NRR E-mail Capture - (External_Sender) IEMA Response Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specification 4.3.1 for Dresden Nuclear Power Station, Units 2 and 3 ML23019A0132023-01-12012 January 2023 NRR E-mail Capture - Final RAI Dresden 2 and 3 - License Amendment Pertaining to GNF3 Fuel Transition ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A1212022-11-21021 November 2022 NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief RV-02D (EPID L-2022-LLR-0075), RV-03 (EPID L-2022-LLR-0076), and RV-23H ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22290A0842022-10-13013 October 2022 NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22258A1882022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review: Dresden 2 and 3 License Amendment Request to Revise Technical Specification 3.1.4, ML22258A1872022-09-13013 September 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3, Amendment Request - Transition to GNF3 Fuel ML22229A0752022-08-16016 August 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-09 ML22229A0762022-08-16016 August 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-10 ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22199A2412022-07-18018 July 2022 NRR E-mail Capture - Acceptance Review: Dresden Units 2 and 3 - License Amendment Request New Fuel Vault Storage and SFP Criticality Safety Analysis Methodology ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval ML22103A2112022-04-12012 April 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief (16R-01) - EPID L-2022-LLR-0037 ML22103A2132022-04-12012 April 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief (16R-02) - EPID L-2022-LLR-0038 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22039A2042022-02-0808 February 2022 NRR E-mail Capture - Public Meeting Dresden/Quad Cities - Proposed Alternative to Use ASME Code Case N-921 ML22027A3592022-01-26026 January 2022 U1: CY2022 Inspection Plan, Docket No. 05000010, License No. DPR-2 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21321A3802021-11-17017 November 2021 NRR E-mail Capture - NRC Acceptance Review of Dresden Nuclear Power Station, Units 2 and 3, Request for Exemption from 10 CFR 2.109(b) ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21244A4012021-08-10010 August 2021 (Final) Request for Information (RAI) Dresden, Units 1, 2, 3, and ISFSI Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50 Appendix E ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21139A1722021-05-19019 May 2021 Acceptance Review Memo Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Pressure Retaining Bolting Requirements ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21105A0002021-04-12012 April 2021 Acceptance Review (LAR)-Dresden Nuclear Power Station, Units 1, 2, and 3, Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently De-fueled Condition ML21103A0082021-04-12012 April 2021 Acceptance Review (Exemption Request): Dresden Nuclear Power Station, Units 1, 2, and 3-Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21081A0722021-03-19019 March 2021 Acceptance Review for Dresden Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-External Events (EPID L-2021-JLD-0000) (E-mail) ML21078A2182021-03-19019 March 2021 Acceptance Review for Dresden Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML21063A3202021-03-0202 March 2021 RAIs for Dresden, Units 2 and 3, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (EPID L-2020-LLA-0239) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 2023-09-22
[Table view] |
Text
NRR-PMDA-ECapture Resource From: Haskell, Russell Sent: Thursday, May 21, 2015 10:39 AM To: Mathews, Mitchel A:(GenCo-Nuc)
Cc: Purnell, Blake; Mozafari, Brenda
Subject:
(TAC Nos. MF5734/MF5735) Draft Acceptance Review for License Amendment Request Spent Fuel Storage Pool Criticality Methodology and Proposed Change TS 4.3.1, "Criticality" for Dresden Nuclear Power Station 2, 3 Importance: High Mr. Mathews:
By licensee letter dated December 30, 2014 (RS-14-310), NRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML14364A100, supplemented by NRC letter dated April 24, 2015 (ML15105A550), and licensee letter dated May 8, 2015 (RS-15-119) ML15128A305, Exelon Generation Company, LLC (EGC, the licensee) submitted a license amendment request for Dresden Nuclear Power Station (DNPS), Units 2 and 3. The proposed license amendment would change the criticality safety analysis (CSA) methodology in the unit 2 and 3 spent fuel pools, and would change the DNPS Technical Specification (TS) 4.3.1, "Criticality."
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to commence its detailed technical review. The acceptance review is also intended to identify whether the application consists of readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. The purpose of this email is to communicate to EGC the NRCs intention to accept this amendment request; and is preliminary in nature. This message will be formalized by a forthcoming NRC letter.
The NRC staff has concluded the application provides the adequate technical information, in sufficient detail, to enable the NRC staff to proceed with its technical review. The NRC will make an independent assessment regarding the acceptability of the applications request in terms of regulatory requirements and the protection of public health and safety, and the environment.
Given the lesser scope and depth of the applications acceptance review compared to a detailed technical review, there may be instances or issues which will impact the NRCs ability to complete a detailed technical review. If this should occur and additional information is required by the NRC staff, you will be advised by separate correspondence. I am currently the point of contact for the Dresden units.
If you have any questions, feel free to contact me at (301) 415-1129 or email me at Russell.Haskell@nrc.gov with regard to any licensing action affecting Dresden 2 and 3. You may also contact Blake Purnell (301.415.1380) in my absence for urgent issues.
Russell S. Haskell II United States Nuclear Regulatory Commission (NRC)
Reactor Systems Engineer NRR/DORL/LPL 3-2 P.O.C.:Dresden Nuclear Power Stations 2,3
+ Russell.Haskell@NRC.Gov; ( (301) 415-1129; Office: O-7D21 1